Skip to content
EV Charging
United Kingdom
Global

Geely developing 1800kW chargers for five minute top ups, UK deployment planned

By Eve

Volvo and Polestar owner Geely is developing 1800kW electric vehicle chargers in China that could reach the UK within a few years, enabling five minute charge times. The Chinese automotive group already operates Zeekr brand vehicles capable of 600kW charging with sub 10 minute 10% to 80% charge times on Chinese roads. Geely UK managing director Michael Yang told Autocar that Britain would be prioritised for the technology rollout, as the company targets 5% UK market share and 100,000 annual vehicle sales by 2030.

Why it matters

The planned UK deployment of 1800kW charging infrastructure by a major automotive manufacturer signals potential demand for ultra high power grid connections and site upgrades. Charge point operators may face competitive pressure from OEM backed networks as Chinese brands including Geely, BYD and MG race to deploy faster charging technology in Britain.

Source

Original title
“Geely goes after BYD with 1800kW electric car chargers - and UK could get them”
Published
3 September 2026
Updated
7 September 2026
Also covered by
Google News (1, 2)

In this story

Related news

BYD and Gentari explore ultra-fast EV charging at Petronas stations in Malaysia

BYD and Gentari are exploring the deployment of ultra-fast EV charging infrastructure in Malaysia, including at Petronas stations and along major highway corridors. The Chinese automaker is seeking to widen charging options for its vehicles, according to the report. The input gives no figures, site counts or timelines, so the plans appear to be at an early stage.

Why it matters

An automaker pairing with a energy-company charging arm on forecourt and highway sites points to a possible future pipeline for hardware suppliers, installers and site partners in Malaysia. CPOs should watch for how the roles are split between BYD, Gentari and Petronas, as that will shape who procures equipment and who operates it.

Malaysia
30 Oct 2026

BYD · Gentari · Petronas · Source

UK home seller reports buyers worried about installing an EV charger on a driveway detached from the house

A UK home seller said on the r/HousingUK subreddit that estate agent feedback after viewings showed potential buyers were concerned they could not fit an EV charger because the driveway is not attached to the property. The Reddit thread, reported by The Cool Down, asked whether home charging could become a standard buying criterion alongside features such as driveways and en suite bathrooms. Several posters said the possibility of installing a charger mattered more than whether one was already in place.

Why it matters

Charger installability is starting to show up as a factor in buyer sentiment, which points to growing demand for solutions where off-plot or detached parking makes a standard home install hard. This is anecdotal evidence from a single forum discussion, but it hints at a gap that on-street, shared and neighbourhood charging providers could address.

United Kingdom
2 Nov 2026

Source

Easelink and Luxshare partner to industrialise automated Matrix Charging in China

Austria-based Easelink is working with Luxshare, a precision manufacturing provider operating in 30 countries, to industrialise its Matrix Charging system for the Chinese market, according to a report posted on 2 November 2026 by Charles Morris. Matrix Charging uses a connector on the underside of the vehicle and a ground-mounted charging pad. Through a technology licence, Luxshare can add the system to its automotive portfolio and offer it to OEM customers, and the two firms are already working on OEM projects to integrate it into future vehicle platforms. Easelink plans to expand its local team in China to support the work.

Why it matters

A licensed manufacturing route into Chinese OEM platforms signals that conductive, hands-free charging is moving towards scaled production, which matters for anyone planning autonomous or fleet charging infrastructure. Procurement teams should watch whether vehicle-side connectors and ground pads become specified at platform level, as that would shape future site design and supplier choices.

China
2 Nov 2026

Easelink · Luxshare · Source