Kempower and BIBUS MENOS install 18 charging points across three sites for Koleje Małopolskie intercity bus fleet in Poland
By Eve
Kempower and its partner BIBUS MENOS have delivered 18 charging points at three locations in Małopolska, Poland, to support Koleje Małopolskie's intercity bus project. The infrastructure will serve a fleet of 15 electric buses and 5 hydrogen buses as part of the region's zero emission public transport initiative.
Why it matters
The deployment demonstrates growing procurement of multi site charging infrastructure for regional public transport operators in Poland. It also highlights the role of local distribution partners in scaling EV charging rollouts for mixed zero emission fleets.
Source
- Original title
- “Kempower and BIBUS MENOS Deliver Charging Infrastructure for Koleje Małopolskie Intercity Bus Project in Poland”
- Published
- 6 October 2026
- Updated
- 7 October 2026
- Also covered by
- Google News
In this story
- Topic
- EV Charging
- Place
- Poland
- Tags
- Kempower · BIBUS MENOS · Koleje Małopolskie
Related news
Koopmann opens multimodal EV charging hub in Cloppenburg, Germany, using Kempower distributed system
Energy service provider Koopmann has opened a high-power charging hub in Cloppenburg, Germany, serving passenger cars, trucks and buses, with 12 CCS2 plugs delivered through Kempower's More Power, More Plugs solution. It is Kempower's first 12-Satellite site in Germany, and combines a wooden solar carport with photovoltaic panels delivering up to 1.2 megawatts and a 1 megawatt-hour battery energy storage system installed by Stodia. Commercial vehicles get two 400 kW charging points and six fast charging points for overnight charging, alongside four public fast charging points for cars, with DKV running charging operations and GLS Mobility managing payment terminals, according to a report posted on 24 November 2026.
Why it matters
The site shows a mixed fleet and public hub combining on-site solar, storage and a distributed charging architecture, with named partners covering storage, operations and payments. It is a useful reference for CPOs and procurement teams scoping multi-stakeholder heavy-duty and public charging sites in Germany.
MAHLE introduces Park & Charge pilot combining autonomous parking with wireless EV charging up to 11 kW
MAHLE has introduced a Park & Charge pilot for automakers that pairs autonomous parking with contact-free inductive charging. Vehicle cameras and AI-based algorithms identify compatible charging bays without extra sensors, and the Differential Inductive Positioning System (DIPS), which SAE International declared a global industry standard two years ago, aligns the vehicle over the ground pad. The system supports charging up to 11 kW at more than 92 percent efficiency under real-world vehicle conditions, includes bidirectional capability, and is being evaluated with the BMW Group in a BMW iX3, with a converted engine test cell in Stuttgart serving as the wireless charging test bench.
Why it matters
MAHLE names car rental, logistics and delivery fleets as target users, so depot operators and CPOs may need to consider ground pad infrastructure and automated bay alignment in future site designs. It is still a pilot with an OEM evaluation, so near-term procurement impact is limited, but it signals where hands-free fleet charging may head.
Urven unveils Urven Charger Park, a solar carport with EV charging that needs no conventional construction
Spanish start-up Urven, working with Bexie Energy, has launched Urven Charger Park, a modular system combining a solar carport with EV charging. It is self-supporting and uses prefabricated concrete ballast blocks instead of reinforced concrete foundations, with the two structures shown using bases of 2,500 kg and 3,500 kg. Parts are prepared in the factory so no cutting or drilling is needed on site, though fixing points are still required to meet local building regulations. The system was shown at the Genera trade fair in Madrid and is built on Urven's L Series solar carport range, as reported by a Turkish technology outlet.
Why it matters
Removing foundation works could shorten installation time and lower civil engineering cost and risk on car park sites, which is relevant to rollout speed and site selection. Buyers should still check the required fixing points and local building rules, as the report gives no pricing, charger power ratings or delivery timelines.