Skip to content
Electric Vehicles
United States

Sound Transit breaks ground on Renton Transit Center for battery-electric double-decker bus service

By Eve

Sound Transit and the City of Renton have begun construction on the new Renton Transit Center, scheduled to open in 2028, which will serve as a hub for the Stride S1 line. The S1 will operate Sound Transit's first battery-electric double-decker buses running every 10 to 15 minutes for over 17 hours daily, connecting Burien and Bellevue via Renton. The Stride bus rapid transit system received voter approval in 2016, with planning starting in 2018 and design completed between 2021 and 2024.

Why it matters

The project signals a major procurement opportunity for electric bus charging infrastructure at a regional transit hub expected to support high-frequency service over extended operating hours. CPOs and suppliers should note the 2028 timeline for a facility designed to accommodate double-decker battery-electric vehicles, which may require specialised charging solutions for larger battery capacities.

Source

Original title
“Sound Transit reveals electric double-decker bus plans, breaks ground on Transit Center”
Published
6 February 2026
Updated
18 July 2026

Related news

KGM Torres EVX qualifies for £1,500 UK Electric Car Grant, cutting price to £35,495

The all-electric KGM Torres EVX now benefits from the UK Government's £1,500 Electric Car Grant, reducing its starting price to £35,495. The South Korean SUV features a 73.4kWh BYD battery with 287 mile range and 130kW fast charging, achieving 10% to 80% charge in 28 minutes. KGM's Musso EV pick-up also qualifies for the £5,000 Plug-in Van Grant, bringing its price to £39,995 and making it the UK's most affordable electric pick-up compared to rivals priced from £57,845.

Why it matters

The grant eligibility makes KGM's EVs significantly more competitive in UK fleet and retail markets, potentially driving demand for charging infrastructure at dealerships and workplaces. The Musso EV's price advantage over established pick-up rivals could accelerate commercial fleet electrification and associated depot charging requirements.

United Kingdom
9 Oct 2026

KGM · Source

Citroen launches OUTDOOR trim for e-C3 and e-C3 Aircross electric models

Citroen has introduced a new OUTDOOR trim level for its C3 family, including the e-C3 and e-C3 Aircross electric vehicles. The OUTDOOR variant sits above the existing MAX trim as the top specification, featuring rugged styling with new front and rear bumpers, grey protective elements, and LED fog lights on the Aircross models. The trim targets customers seeking adventure oriented design while maintaining the C3 range's comfort and practicality.

Why it matters

This product update is not directly relevant to EV charging procurement or infrastructure development, as it concerns vehicle styling and trim levels rather than charging capabilities or partnerships.

Global
9 Oct 2026

Citroën · Source

Chery offers RM18,000 discount on Tiggo 9 and extended 10 year battery warranty on Tiggo 8 PHEV at Malaysia auto expo

Chery is offering an RM18,000 rebate on its Tiggo 9 SUV, reducing the price to RM179,800, and promoting its Tiggo 8 PHEV at RM159,800 with an extended 10 year battery warranty at the paultan.org Auto Car Expo 2026 in Malaysia, running from 31 October to 1 November. The Tiggo 8 PHEV features a 275 PS hybrid system with 90 km electric only range and 1,200 km combined range. The expo will feature over 20 automotive brands including Audi, BMW, Hyundai, Proton eMas, and Zeekr.

Why it matters

The extended 10 year battery warranty on the Tiggo 8 PHEV signals growing manufacturer confidence in PHEV durability, potentially influencing fleet procurement decisions in Malaysia. The presence of multiple EV and PHEV brands at a major consumer expo reflects accelerating electrification in the Southeast Asian market.

Malaysia
9 Oct 2026

Chery (global) · Source