Skip to content
EV Charging
India

ThunderPlus and Indofast Energy partner to build 250 integrated EV energy hubs across India

By Eve

Electric vehicle infrastructure provider ThunderPlus has formed a strategic partnership with Indofast Energy to develop integrated EV energy hubs offering both charging and battery swapping services at single locations. The rollout will begin in Hyderabad, Bengaluru, and Delhi NCR, with plans to expand to more than 250 sites nationwide. The co-located model targets two-wheelers, three-wheelers, and commercial fleet operators, with Indofast Energy deploying its battery swapping stations within ThunderPlus's existing charging network.

Why it matters

The 250 site pipeline represents significant procurement opportunity for equipment suppliers and construction partners serving India's commercial EV segment. The integrated charging and swapping model addresses fleet downtime concerns and signals a shift toward multi-modal energy infrastructure that CPOs and fleet operators may increasingly adopt.

Source

Original title
“ThunderPlus and Indofast Energy partner to build EV energy hubs”
Published
18 February 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

ThunderPlus installs Hyderabad's first public EV charging station at AIG Hospital campus

ThunderPlus has installed Hyderabad's first public EV charging facility within a hospital campus at AIG Hospital, Gachibowli. The facility features a 60 kW DC fast charger and a 7.4 kW AC charger, with the DC unit enabling charging in approximately 30 to 45 minutes. The station is accessible to hospital staff, visitors and the general public.

Why it matters

The installation demonstrates a new site category for charging infrastructure deployment, targeting healthcare campuses where users spend extended periods. For CPOs and site hosts, hospitals represent high dwell time locations with captive audiences of staff and visitors, potentially offering strong utilisation rates for charging assets.

India
9 Oct 2026

ThunderPlus · AIG Hospital · Source

Believ to install more than 600 chargers across Ayrshire in 15 year council partnership

EV charge point operator Believ has secured a 15 year agreement with three Ayrshire councils to install more than 600 chargers at around 300 locations, with installation beginning in early 2027. The project combines over £2.8m from the Scottish Government's EV Infrastructure Fund with more than £15m in committed capital investment from Believ, delivered alongside Transport Scotland and the Scottish Futures Trust. The rollout includes roughly 180 chargers for East Ayrshire, 210 for North Ayrshire and 220 for South Ayrshire, with passive infrastructure for over 450 additional chargers to enable future upgrades without disruptive roadworks.

Why it matters

This major regional deployment demonstrates how CPOs can secure long term public sector contracts by combining government funding with substantial private capital, creating a scalable model for rural and island charging access. The inclusion of passive infrastructure for 450 additional chargers shows forward planning that reduces future deployment costs and speeds network expansion as EV adoption grows.

United Kingdom
9 Oct 2026

Believ · Source

Vietnam mandates cross-brand compatibility at public EV chargers from July 2027

Circular 61/2026/TT-BCT, issued by Vietnam's Ministry of Industry and Trade, requires public EV charging stations to serve vehicles from multiple manufacturers starting 1 July 2027. Operators must install compatible connectors, charging modes and technical specifications, and station control systems must not restrict charging for publicly declared compatible vehicle configurations. The regulation emphasises technical compatibility without mandating support for all vehicle brands, The Investor reported on 8 October.

Why it matters

The rule forces charging point operators in Vietnam to design infrastructure for interoperability, potentially raising upfront costs but widening the addressable customer base. Procurement teams and OEMs will need to verify that hardware and software meet the new compatibility standards ahead of the July 2027 deadline.

Vietnam
9 Oct 2026

Source