Skip to content
Grid & Energy
United Kingdom

E.ON's acquisition of OVO Energy analysed for supply chain implications

By Eve

Supply Chain Digital has published an analysis of E.ON's acquisition of OVO Energy and what the deal means for energy supply chains in the United Kingdom. The article examines the potential impacts on the broader energy sector as the two companies combine operations.

Why it matters

Consolidation among major energy suppliers can reshape procurement dynamics for EV charging operators, potentially affecting electricity supply agreements, grid connection processes and partnership opportunities for charge point operators across the UK.

Source

Original title
“What E.ON's OVO Acquisition Means for Energy Supply Chains”
Published
21 May 2026 (date approximate)
Updated
16 July 2026

In this story

Related news

E.ON acquires former BP Pulse EV charging network in the Netherlands from Catom

E.ON has bought the EV charging business from Dutch fuel distributor Catom, which had acquired BP's petrol station and charging operations in the country last year. The portfolio includes 17 fast charging hubs with Alpitronic chargers delivering up to 300kW, 51 battery buffered sites for grid constrained locations, and 45 secured development sites for future rollout. E.ON Infrastructure will own and maintain the assets while sister utility Essent will handle customer facing operations and marketing, with sites rebranded to Essent and chargers carrying E.ON branding.

Why it matters

The deal consolidates a ready built Dutch charging estate under a major European utility, giving E.ON immediate scale in a market where battery buffered sites address grid capacity constraints. The 45 secured development sites offer a clear pipeline for staged expansion, while the dual brand model separates infrastructure ownership from customer operations.

Netherlands
12 Oct 2026

E.ON · BP Pulse · Source

750 affordable homes in UK now heated by mine water geothermal network

A new energy centre at Seaham Garden Village in the UK is now supplying low carbon heat to around 750 affordable homes using naturally warm mine water pumped from a Durham treatment facility. Energy Live News reported that the network has completed commissioning and is fully operational. The system uses geothermal processes that keep mine water at a relatively constant temperature year round, providing a dependable heat source instead of traditional heating fuel.

Why it matters

The operational mine water heating network demonstrates a replicable model for decarbonising heat in social housing developments, potentially informing procurement specifications for low carbon heating infrastructure at scale. The proven reliability of geothermal mine water as a consistent year round heat source may influence future district heating tenders and public sector energy resilience planning.

United Kingdom
12 Oct 2026

Source

Tesla Powerwall autonomously grid-charged before peak rates to offset low solar yield in Arizona

A Tesla Powerwall owner in Tucson, Arizona, reported that the battery began charging from the grid at around 2:30 p.m. on a rainy day, ahead of a 3 to 7 p.m. peak rate window, after solar generation fell short. The homeowner had set the system to Saving mode and disabled Stormwatch, allowing the Powerwall to draw enough grid power to cover the high cost period. The case, shared on Reddit's r/Powerwall forum, illustrates how residential storage can automatically balance low renewable output with time of use tariffs.

Why it matters

The example shows demand side flexibility in action, with home batteries responding to tariff signals and weather conditions without manual intervention. For CPOs and utilities, it underscores the growing role of behind the meter storage in load shifting and the need for rate structures that reward or integrate such behaviour at scale.

United States
11 Oct 2026

Tesla · Source