Skip to content
Tag
UK

London Fire Brigade

Tagged in 1 story

Stories tagged London Fire Brigade

London Fire Brigade completes year-long trial of electric-hybrid fire engine and moves it into frontline service

The Zero Emission Pumping Appliance (ZEPA01), developed by London Fire Brigade with Emergency One and Babcock Critical Services, has finished a year-long operational trial and is now fully integrated into frontline service. Based at Hammersmith Fire Station since October 2025, it attended over 1,500 incidents, including 141 fires, 393 special service calls and a 25-pump warehouse fire in Brent, completing every attendance on battery power alone. It has a range of more than 200 miles, can pump water continuously for up to four hours, and is estimated to have saved almost 17 tonnes of carbon dioxide compared with a standard diesel fire engine.

Why it matters

A successful trial in one of the most demanding emergency response roles strengthens the case for electrifying blue light fleets, which could create new demand for depot and station charging infrastructure. CPOs and installers should note that resilient, high availability charging at fire stations is likely to become a requirement if the technology is adopted more widely.

United Kingdom
23 Nov 2026

London Fire Brigade · Source