Daily EV news · France · 24 November 2026
EV Charging
A charger labelled up to 300 kW can deliver less than a 150 kW unit when power is shared
A French language article argues that the headline figure on a charger is only one of several limits. A "up to 300 kW" unit can give a car under 150 kW if the 300 kW is split across several outputs, while dynamic allocation can raise a driver's power mid session as other cars draw less. It compares three fictional sites with identical cars, using reserved power, a fixed equal split and dynamic allocation, and cites Kempower's technical manual on the separate limits of vehicle, charge point and site.
Why it matters
Specifying and marketing sites by headline kW can mislead drivers and tenders, so procurement teams should ask how power is shared between outputs and what a driver receives when the site is busy. Power sharing architecture affects real session speed, throughput per bay and how a CPO should describe its offer.
Electric Vehicles
Volkswagen ID. Polo waiting times in Germany stretch beyond a year, with up to 21 months reported for the Trend
Dealers in Germany now cite waits of more than a year for the Volkswagen ID. Polo, against ten months reported in September, according to an Automobilwoche survey cited by Electrive on 23 November 2026. Motor.es estimates, also reported by Electrive, put waits at up to 21 months for the Trend, five months for a variant labelled Sportline and seven months for the GTI. These are reported estimates for Germany, not a delivery schedule for the French market, and Sportline should not be confused with the French Style trim.
Why it matters
Long and uneven waits suggest production is struggling to keep pace with orders, which could delay fleet and depot electrification plans that depend on specific versions. Buyers and CPOs forecasting charging demand from new registrations should treat the German figures as a signal rather than a French timeline, and check the configuration and the distributor's own allocation.
BYD enters exclusive talks to buy Ineos Automotive's Hambach plant in France
BYD has entered exclusive negotiations to acquire Ineos Automotive's manufacturing plant in Hambach, France, subject to consultation with works councils. Ineos plans to move Grenadier and Quartermaster production to the United States in 2028, as the US now accounts for 70% of global Grenadier 4×4 sales, and both models would continue to be assembled at Hambach in the medium term during the transition. BYD would build electric vehicles in France for European buyers as part of its wider European expansion.
Why it matters
A BYD production base in France points to more locally built EVs for European buyers, which could shape future fleet and charging demand across the region. CPOs and procurement teams should watch how the timing and scale of output develop once the deal and consultations conclude.
France to build strategic reserves of rare earths and priority metals from 2027 to protect EV production
At the Choose France summit on Monday 23 November 2026, the Élysée announced strategic reserves of rare earths and certain priority metals, modelled on oil stockpiles and planned from 2027. According to France Info, the scheme will be run by the Caisse des dépôts, which will consult industry on its needs, and carmakers will also have to diversify their supply sources to keep receiving public aid. Ministry of Economy figures cited in the report say China holds more than 85% of global rare earth separation capacity.
Why it matters
Public support is being tied to supplier diversification, which could shape how French vehicle makers source materials and, indirectly, EV supply and pricing. Procurement teams should watch for any knock on effects on component availability and lead times.
Policy & Market
France updates list of electric car versions eligible for environmental score based subsidies from 24 November 2026
The list of electric car versions meeting France's minimum environmental score changes on 24 November 2026, following an order dated 22 October (published 23 October) and a second order dated 19 November (published 20 November), both taking effect on 24 November. Buyers are told to check the exact version on the quote using the TVV reference (Type, Variante, Version) rather than the model name, since ADEME says one model can correspond to several dozen TVVs. The updated list must be consulted instead of the annex published in October.
Why it matters
Eligibility for the subsidy is set at version level, not model or range level, so any fleet, leasing or workplace charging customer budgeting around the aid needs to verify the TVV. Changes to the list can shift which vehicles qualify and so affect near-term EV uptake and charging demand planning in France.