EV Charging
Stories
27 November 2026
India edition · Germany edition · UK edition · Ireland edition · Global edition · Southeast Asia edition
Honda Cars India signs charging partnerships with five networks ahead of Honda Alpha electric SUV launch
Honda Cars India has entered charging partnerships with Adani TotalEnergies, Jio-bp, Tata Power, GO EC and ElectreeFi ahead of the Honda Alpha, its first electric SUV in India, which debuts on 2 December. The networks will be integrated into the Honda Connect digital platform so users can find chargers, check availability, start sessions and pay in one place, with ElectreeFi acting as the charging ecosystem technology partner linking the operators. The announcement was reported by trade press quoting Honda Cars India's Kunal Behl and Jio-bp's Sarthak Behuria.
Why it matters
An automaker bundling several operators into one app shows OEMs in India are choosing roaming style aggregation over owning networks, which raises the value of open integration and reliable uptime for CPOs. Operators outside the named partners may face a visibility gap with Honda Alpha drivers.
Elli launches EnBW Boost tariff with fixed 54 cent per kWh fast charging across Germany
Volkswagen Group subsidiary Elli has introduced EnBW Boost, a tariff open to drivers of electric vehicles from all manufacturers, offering a fixed rate of €0.54 per kWh across the EnBW fast-charging network for a monthly fee of €3.99. The tariff can be cancelled monthly and will also be available in Volkswagen Group brand apps. Separately, the Volkswagen brand is launching an exclusive We Charge City tariff for the new ID. Cross, at €0.39 per kWh for public AC charging and fast charging at EnBW stations in Germany. EnBW operates Germany's largest fast-charging network, with more than 9,000 charge points, according to the announcement from Wolfsburg.
Why it matters
Fixed per kWh pricing bundled through OEM apps shows how automaker backed roaming tariffs are steering volume to a single large network, which can shape utilisation and negotiating leverage for CPOs inside and outside that partnership. Operators and bidders should note the price points now set as a consumer reference for fast charging in Germany.
Elli · EnBW · Volkswagen Group · Source
North of Scotland expands public EV charging network
SmartCitiesWorld reports that public EV charging provision in the North of Scotland is being expanded. The available text gives no figures on chargepoint numbers, locations, funding, delivery partners or timing, so the scale of the rollout cannot be confirmed from this item alone.
Why it matters
Network growth in the North of Scotland may signal emerging tender, funding or site host opportunities in a region where coverage has historically been thinner. Procurement teams and CPOs should check the full article and the responsible local authorities for specifics before acting.
Somerset Council moves ahead with delayed £3.8m LEVI charging scheme after operator withdrew
Somerset Council says it is ready to progress the next phase of two initiatives under the Local Electric Vehicle Infrastructure (LEVI) programme, after delays caused by the originally selected chargepoint operator withdrawing. The council's allocation of £3.783m from government remains protected and is to be used alongside private investment, and the pause was used for a review of delivery, evidence base and a revised, more flexible contract reflecting urban and rural needs. The council is now preparing a revised submission to the Office for Zero Emission Vehicles (OZEV) before starting a new procurement process.
Why it matters
A fresh procurement round is coming in Somerset, with a contract revised for more flexibility across urban and rural areas, which may change the terms bidders respond to. It also shows the delivery risk when a selected operator withdraws from a LEVI award, and the time that can cost a local authority.
EV charging cable theft in Ireland described as widespread and weekly, with industry calling for a national strategy
EV charger groups told an Oireachtas committee this week that there has been a "significant" increase in cable theft this year, with incidents said to be coordinated, carried out by several groups, and occurring across multiple sites every weekend. The committee heard Tipperary was "practically wiped out" by cable theft a couple of weekends ago, and industry groups cited repair costs of tens of thousands. An Garda Síochána said it could not provide reliable figures because there is no specific category for EV cable theft in its system.
Why it matters
Repeated cable replacement adds unplanned opex and uptime risk for CPOs, and the lack of official theft data makes it harder to build the case for insurance, security specification and tender requirements. Operators and funders may want to weigh cable protection and site security measures in procurement, while watching for any national strategy from gardaí and Government.
Xpeng to roll out 1 MW X-Energy chargers from end of year and launch five new models in 2027
At the Auto Guangzhou show, Xpeng said it expects to deliver over 100,000 export vehicles in 2026, including a record 13,326 units in October, up 166% year on year. Its X-Energy charging network starts rolling out from the end of the year, with 1 MW (1,000 kW) output through a liquid cooled connector rated at up to 1,000 amps, and a battery energy storage system limits grid draw to no more than 240 kW at a time. The L05 SUV is due in Thailand in December, then Malaysia later in 2027 alongside the L03, as the company positions X-Energy against BYD's Flash Charging.
Why it matters
A 1 MW charger backed by on-site storage that caps grid draw at 240 kW is a design pattern that could ease grid connection constraints for high power sites. Growing Xpeng export volumes and new ASEAN launches also point to a larger base of its vehicles in markets such as Thailand and Malaysia.
Xpeng (cn) · BYD (cn) · Source
Fastned and Places for London open East Finchley hub and line up further London sites
Fastned and Transport for London property company Places for London have opened an East Finchley Underground Station hub with eight ultra-rapid bays powered by 400kW technology, capable of adding up to 100 miles of range in five minutes for compatible vehicles. The earlier Hatton Cross hub near Heathrow has supported more than 1.1 million zero-emission kilometres in six months, and a further nine planning consents have been secured with three more awaiting decisions. Construction is due to begin next year on at least five sites in Dagenham, Hillingdon, Hounslow, Redbridge and West Barking, delivering 66 bays and taking the joint venture to eight sites and 122 bays, while the 36-bay Hanger Lane site in Ealing is due to open in spring 2027.
Why it matters
The partnership shows a repeatable model for securing ultra-rapid sites on public sector land in London, with a visible planning pipeline of nine consents and three pending. Competing CPOs and funders should note the pace of consent and the scale of bays planned in a constrained urban market.
RAC says only 31 cross-pavement charger grants were paid out in the past 12 months
New figures cited by the RAC show just 31 grants of £500 were paid for cross-pavement charge points over the past 12 months, with the scheme only available until March 2027. The RAC puts a charge point at around £1,000, a cable channel at an average £1,300 and some council licence fees at up to £185 a year, against an estimated nine million households without off-street parking. It is urging ministers to simplify the rules, back cross-pavement gullies more strongly and cut VAT on public EV charging from 20% to the 5% normally applied to domestic electricity.
Why it matters
Very low grant uptake suggests home charging is still out of reach for most drivers without driveways, which keeps demand pressure on public on-street and neighbourhood charging. A VAT cut on public charging, if adopted, would directly affect CPO pricing and the competitiveness of public charging against home tariffs.
26 November 2026
Australia edition · Hong Kong edition · US edition · France edition · UK edition · Europe edition · India edition · Global edition · Turkey edition · South Korea edition
Australian Senate passes third resolution demanding release of NRMA 'Grit in the Gears' report on national EV charging rollout
The Senate voted 35 to 20 this week, with the Greens and independents backing the Coalition motion, to set a new deadline of 25 November for release of the NRMA report. The 21-page document, subtitled 'Lessons from the frontline of building a national EV network', examines why NRMA fell short on a $78 million plan to build 117 charging stations, with around 62 completed according to an NRMA spokesperson. Energy and climate minister Chris Bowen has refused the earlier requests citing commercial sensitivity and public immunity, and the copy on the Department of Climate Change, Energy and the Environment website is fully redacted apart from one line giving an average installation cost of $350,000, as reported by The Driven.
Why it matters
The report is believed to set out the practical problems that stalled a publicly funded national charging contract awarded in April 2023, which is the kind of insight bidders and CPOs would want when pricing and scoping similar programmes. The only disclosed figure, an average installation cost of $350,000, offers a rare public benchmark, but the wider lessons remain hidden.
Schneider Electric launches 720kW EVlink Pro DC 720 charger and Schneider Boost Pro battery storage in Hong Kong
Schneider Electric has launched the EVlink Pro DC 720 in Hong Kong, a charging system delivering up to 720kW for cars, buses and trucks, aimed at commercial buildings, fleet operators and charging station providers. The company says a compatible vehicle can charge from 20% to 80% in around 15 minutes under suitable conditions, and the system can serve up to 12 vehicles at once. It has also introduced Schneider Boost Pro, a battery energy storage system to help businesses manage electricity usage and make better use of existing power infrastructure.
Why it matters
Pairing high-power charging with on-site storage points to a route for sites with constrained grid capacity to add heavy duty and fleet charging without waiting for major upgrades. Procurement teams in Hong Kong now have another supplier option to assess, though the charge time claims are the vendor's and depend on suitable conditions.
IONNA opens its largest charging hub in Westminster, California and adds Tesla Autocharge support
IONNA has opened a 22-bay Rechargery at 6260 Westminster Boulevard, near the Interstate 405, with 12 CCS and 10 NACS connectors, charging speeds of up to 400 kW and a 4 MW grid connection. The site is the company's largest to date and includes lounges, restrooms and a convenience store using Amazon's Just Walk Out technology. IONNA is also enabling automatic charging authentication for Tesla drivers across its network, and is highlighting its coverage through road trips totalling more than 40,000 miles.
Why it matters
A 22-bay site on a 4 MW connection shows the scale and power density that automaker-backed networks are now building, and sets a benchmark for competing CPOs bidding for high-traffic corridor locations. Autocharge support removes a key friction point for Tesla drivers and signals growing interoperability between networks, which affects how operators plan connector mix and driver access.
Electra and RATP Solutions Ville to form joint venture for ultra-fast charging stations across Île-de-France
Electra and RATP Solutions Ville, the urban infrastructure arm of the RATP group, announced on Wednesday 25 November at the Salon des maires that they will create a joint company, owned 51% by Electra and 49% by RATP Solutions Ville. About ten sites are already identified in Paris, the inner suburbs and the Yvelines, with close to 80 ultra-fast charge points planned in time. RATP will provide land and urban integration experience, Electra will design, operate and sell the charging service, and both will fund the infrastructure, though no investment figure or company name has been disclosed.
Why it matters
Securing space for rapid charging in dense urban areas is a major constraint, and this deal gives Electra access to a pipeline of transport operator land in the Paris region. Competing CPOs and site hosts should note the model of pairing a landholder with an operator through a majority owned joint venture.
Allego prepares time and location based charging prices and a loyalty programme for 2027
In an interview published by Bevolt on 18 November 2026, Allego marketing director Jean Gadrat outlined plans for pricing that could vary by time of day and by station in 2027. The ideas include separate day and night prices and discounts at less busy sites, with a loyalty programme also under consideration for early 2027. These plans would follow the app credit offer Allego currently runs, and no tariff figures were given in the excerpt.
Why it matters
Allego is moving towards price signals that steer demand across hours and sites, which could shift utilisation at underused locations and change how roaming and fleet customers compare tariffs. Procurement teams and CPOs should watch how the day and night split and site discounts are set, as they may influence host site economics and charging cost planning in France.
Tesla puts 29 mobile Supercharger stalls in place for Thanksgiving travel in California and Arizona
Tesla says 29 temporary Supercharger stalls are live at busy sites in California and Arizona, on top of 1,027 permanent US stalls opened over the last 56 days. Three of the four sites shown in Tesla's charging account photo are in California's Central Valley, with the fourth at Holbrook on I-40 in northern Arizona. Tesla is also providing on-site attendants to manage queues and a virtual waitlist now running at 300 sites, and has not said whether the mobile units run from the grid or from onboard batteries.
Why it matters
Temporary capacity, attendants and virtual queuing show how a large network operator now handles peak demand on key corridors, which sets a visible benchmark for CPOs and site hosts planning for holiday surges. The unanswered question on grid or battery supply is relevant to anyone assessing how quickly extra capacity can be deployed where grid connections are limited.
Government compliance report finds contactless payment lags other public charge point rules
The Department for Transport and the Office for Zero Emission Vehicles published a statutory report covering January to December 2025 under Part 2 of the Automated and Electric Vehicles Act 2018. The Office for Product Safety and Standards inspected more than 300 public charge points at 78 locations, finding that 76% met the contactless payment requirement and 86% met the requirement to display charging prices, with compliance on helpline and open data obligations higher than on contactless. Contactless has been required since November 2024 for newly installed chargers rated at 8kW or more, and for existing and new rapid chargers rated at 50kW or above.
Why it matters
Contactless is the Public Charge Point Regulations 2023 requirement where inspected sites fell furthest short, so operators and site hosts should expect it to draw scrutiny. Procurement specifications and maintenance contracts should make payment hardware compliance, and the November 2025 roaming requirement, explicit obligations.
Allego secures green financing package of up to €720m, the largest ever for a European charge point operator
Allego has arranged a green financing package worth up to €720 million, made up of a €370 million refinancing facility, a €250 million accordion term facility and a guarantee facility of up to €100 million. The operator's European network currently stands at 32,000 charging points, 5,500 of them ultra-rapid, and it has already committed €100 million to the UK by 2030. Its growth leans on retail and automotive partners, including Ford dealerships (chargers up to 400kW), Hornbach in the Netherlands (taking it to 80 hubs there), HOFER in Slovenia, IKEA in Belgium, REWE in Germany and Burger King in France.
Why it matters
Debt capacity of this scale at a European CPO signals lender confidence in public charging and suggests Allego will keep pursuing host partnerships and site roll-outs. Suppliers, landowners and rival bidders should expect a well-funded competitor in tenders and site negotiations.
Fastned opens first Autonomous Pit Shop at Gateshead charging hub
Charge point operator Fastned has opened the first of five planned Autonomous Pit Shop sites on Askew Road, Gateshead, combining a self-service convenience shop and café with 10 ultra-rapid bays of up to 400kW. The site is open 24 hours a day, with customers tapping a payment card to enter, and money is only taken when refreshments are bought or a charge session starts. Charging starts at 55p/kWh for Gold members (from £4.99 a month, covering up to three vehicles per account) and 79p/kWh for non-subscribers, as reported in the trade press.
Why it matters
Fastned is testing retail as an add-on to high-power hubs, with four more Autonomous Pit Shop sites planned across the UK. Site hosts, landowners and rival CPOs should watch how unstaffed retail affects dwell time and site economics, alongside the published subscription and pay-as-you-go price points.
India to expand Unified Bharat e-Charge platform beyond five-state pilot
India plans to scale the Unified Bharat e-Charge platform beyond its five-state pilot, with expansion described as gradual and tied to strengthening the charging network. The platform, jointly developed by NPCI BHIM Services and BHEL, has around 12 charging operators onboard, and the Ministry of Heavy Industries says most electric two-wheeler, three-wheeler and four-wheeler manufacturers are also integrated. No timeline has been announced for adding more states.
Why it matters
A single interface for locating chargers and paying across networks could reduce reliance on operator-specific apps, so CPOs in India may need to plan for integration as the pilot widens. With no timeline set and expansion linked to network reliability, uptime and dependability are likely to shape who benefits first.
MAHLE introduces Park & Charge pilot combining autonomous parking with wireless EV charging up to 11 kW
MAHLE has introduced a Park & Charge pilot for automakers that pairs autonomous parking with contact-free inductive charging. Vehicle cameras and AI-based algorithms identify compatible charging bays without extra sensors, and the Differential Inductive Positioning System (DIPS), which SAE International declared a global industry standard two years ago, aligns the vehicle over the ground pad. The system supports charging up to 11 kW at more than 92 percent efficiency under real-world vehicle conditions, includes bidirectional capability, and is being evaluated with the BMW Group in a BMW iX3, with a converted engine test cell in Stuttgart serving as the wireless charging test bench.
Why it matters
MAHLE names car rental, logistics and delivery fleets as target users, so depot operators and CPOs may need to consider ground pad infrastructure and automated bay alignment in future site designs. It is still a pilot with an OEM evaluation, so near-term procurement impact is limited, but it signals where hands-free fleet charging may head.
Urven unveils Urven Charger Park, a solar carport with EV charging that needs no conventional construction
Spanish start-up Urven, working with Bexie Energy, has launched Urven Charger Park, a modular system combining a solar carport with EV charging. It is self-supporting and uses prefabricated concrete ballast blocks instead of reinforced concrete foundations, with the two structures shown using bases of 2,500 kg and 3,500 kg. Parts are prepared in the factory so no cutting or drilling is needed on site, though fixing points are still required to meet local building regulations. The system was shown at the Genera trade fair in Madrid and is built on Urven's L Series solar carport range, as reported by a Turkish technology outlet.
Why it matters
Removing foundation works could shorten installation time and lower civil engineering cost and risk on car park sites, which is relevant to rollout speed and site selection. Buyers should still check the required fixing points and local building rules, as the report gives no pricing, charger power ratings or delivery timelines.
Intermarché and Edenred Mobilité launch Inter énergies fleet card with fixed charging rates
Intermarché and Edenred Mobilité have launched a payment card for business fleets covering both fuel and EV charging, for petrol and diesel, rechargeable hybrid and electric vehicles. According to a French press report, rates are fixed at 0.29 € per kWh excluding VAT on AC points and 0.49 € per kWh excluding VAT on fast chargers, equal to 0.348 € and 0.588 € including 20% VAT. A 50 kWh fast charge would therefore cost 29.40 € including VAT, before any extra fees.
Why it matters
A single flat tariff applied across all partner networks gives fleet managers cost predictability that most public charging pricing does not offer, and it sets a visible price benchmark for roaming and fleet card negotiations. CPOs in France may face pressure to join such schemes or to justify higher variable rates to fleet customers.
ChargeZone CEO says India needs $4 billion to $5 billion of charging investment to reach 30% EV penetration by 2030
In a video conversation with Autocar Professional, ChargeZone Founder and CEO Kartikeya Hariyani said EV penetration in India has risen from under 3% to 8% to 10% in 18 months. He estimates a minimum $4 billion to $5 billion of charging infrastructure investment is needed to support the 30% by 2030 target, with 80% to 90% of future capex going to ultra-fast superchargers that keep highway stops under 20 minutes. The interview follows the Society of Indian Automobile Manufacturers (SIAM) declaring November 20 as India EV Charging Day, and Hariyani says network utilisation is outpacing supply growth on major intercity corridors.
Why it matters
A shift of most future capex towards ultra-fast, multi-bay hubs, which Hariyani says have better unit economics than smaller fast-charging stations, signals where tender and site pipeline demand is heading in India. His claim that over 90% of charger components are already localised in India is relevant to supplier selection and sourcing.
EZO plans more than 250 new public charging locations in the North of Scotland by 2030
EZO, a charge point operator based in the UK and Ireland, has opened the first of more than 250 planned sites in Aviemore, with one 50kW DC charger and two 11kW AC chargers. The rollout sits under a 20 year partnership with Aberdeen City, Aberdeenshire, Highland and Moray councils, the first inter-council contract awarded through the Scottish Government's Electric Vehicle Infrastructure Fund, with Transport Scotland committing more than £7m. EZO is also progressing a further 51 fully self-funded sites, has migrated 385 public chargers from ChargePlace Scotland to its platform, and is replacing 77 existing chargers.
Why it matters
This shows a multi-council concession model backed by public funding and operator investment, which sets a template for regional tenders in Scotland. The migration of 385 ChargePlace Scotland chargers to EZO's platform also points to operators consolidating legacy networks and prioritising reliability.
Rice University develops rapid synthetic graphite method that enables four minute battery charging in tests
Researchers at Rice University have devised a new way to produce synthetic graphite for lithium ion batteries, using petroleum coke, a low cost by-product of oil refining, mixed with a small amount of nickel compound and hit with a strong electrical pulse. Temperatures reach about 2,500 degrees and the graphite structure forms in just 0.2 seconds, against conventional production that needs very high temperatures held for long periods at high energy cost. The nickel acts as a temporary scaffold and slightly widens the spacing between graphite layers, and tests indicate a four minute charge is possible, according to a Turkish language report.
Why it matters
Faster charging and cheaper, less energy intensive anode material would matter to anyone planning high power charging capacity, but this is a laboratory result with no commercial timeline stated. Procurement teams should treat it as a signal to watch in battery supply chains rather than a basis for current specifications.
Andersen EV expands Bedfordshire manufacturing and introduces same-day dispatch for home chargers
Andersen EV has taken an additional unit alongside its existing facility in Stewartby, Bedfordshire, adding production space and capacity after sales volumes more than doubled year on year in the third quarter. The company is also investing in new technologies and introducing AI into its production processes. Orders for the A2, A3 and Andersen Quartz home chargers placed before 11am on a working day can now be dispatched the same day in the chosen colour and specification.
Why it matters
A UK manufacturer adding capacity and offering same-day dispatch on its home charger ranges points to shorter lead times and greater supply confidence for installers and procurement teams specifying residential units. It also shows demand for design-led home charging is strong enough to justify further investment in domestic production.
Volkswagen and Elli to launch €1,995 bidirectional V2G charger in Germany in December 2026
Volkswagen Group's energy subsidiary Elli will launch a Vehicle-to-Grid package in Germany in December 2026, combining a bidirectional DC wallbox, electricity tariffs, digital services and installation. The Elli BiDi Charger is priced at €1,995 including VAT and shipping, delivers up to 11 kW of charging and discharging, supports 400-volt and 800-volt architectures and includes ISO 15118-20 communication. The offer initially covers Volkswagen, Volkswagen Commercial Vehicles, CUPRA and Škoda customers, with expansion to more European markets planned for 2027, and The Mobility House Energy is supporting the management of aggregated battery capacity.
Why it matters
A published mass-market price of €1,995 for an 11 kW bidirectional DC wallbox gives buyers and installers a concrete benchmark for V2G hardware costs. The ISO 15118-20 support and the planned 2027 European expansion signal that bundled hardware, tariff and aggregation offers may become a competitive reference for CPOs and installers considering V2G.
Volkswagen · Elli · Source
Depot grid capacity, not vehicle supply, sets the pace of fleet electrification, says Arun Anand
In a piece on depot charging, Arun Anand argues that the agreed import capacity with the distribution network operator (DNO), rather than the number of parking bays or vehicles, decides how many vans can charge at once. His worked example is that twenty vans on 22kW chargers can demand 440kW as soon as they return, while many depots were sized only for lighting, offices and a workshop. He notes that reinforcement means an application, a network study, a quote and a place in the queue, and that timelines can run well beyond vehicle delivery dates. The article also covers load management and the government's Depot Charging Scheme.
Why it matters
For CPOs and installers, the connection is the critical path on depot projects, so early capacity checks and load management design can decide whether a scheme is deliverable. Operators who request the largest possible connection face higher capital contributions, which affects how projects are scoped and priced.
Ionna halves DC fast charging price to $0.20/kWh across US network for Thanksgiving weekend
Ionna, the automaker-backed public charging network ranked first in J.D. Power's latest public charging satisfaction survey, has cut its average price from $0.40/kWh to $0.20/kWh plus tax at all its US DC fast charging stations, a 50% discount. The fixed price runs through November 29 and needs no code or special action, with payment via the automaker app, on-site terminals or the Presto app for Tesla owners using Autocharge. The report notes a 50 kWh session that would cost $20 now costs $10 plus tax, and that Ionna uses 400 kW Alpitronic chargers exclusively, with many stalls offering dual cords with CCS2 and NACS connectors.
Why it matters
A network-wide, time-limited price cut at a satisfaction-ranked operator shows how a well-funded CPO can use pricing to drive utilisation and brand loyalty during peak travel periods. Competing operators and site hosts should consider how it affects driver price expectations and the pricing assumptions in their own tenders and business cases.
Hybrid graph and reinforcement learning model improves urban EV charging load forecasts in Shanghai test
An engineering research team has developed a hybrid spatio-temporal forecasting framework that combines a graph attention network, an enhanced long short-term memory architecture and a value-decomposition multi-agent reinforcement learning algorithm. Published in Sustainable Energy Research and tested on the urban distribution network of Fengxian District in Shanghai, it is reported to improve load forecasting accuracy, convergence stability and resilience during operational anomalies against benchmark models. The system produces day-ahead charging demand estimates and quantifies the effect of heavy charging loads on distribution grid voltage profiles. The excerpt does not give specific accuracy figures.
Why it matters
Better day-ahead demand forecasts and voltage impact estimates at station level could help CPOs and grid planners size connections, manage flexible load and anticipate network constraints before they delay rollout. This is an academic result from a single district test, so it should be treated as an early signal rather than a proven commercial tool.
South Korea links more than 140,000 EV charging facilities to national fire service system
Korean fire stations can now see the locations and types of EV charging facilities, plus contact details for their managers, through the fire prevention information system, which began operating this month. The data comes from the Ministry of Climate, Energy and Environment and the Korea Environment Corporation (K-eco), with the National Fire Agency announcing completion on the 26th. The move follows a cross-government safety plan issued after a 2024 EV fire at an apartment complex in Cheongna, Incheon, and aims to cut the time needed to locate chargers and contact managers to isolate power.
Why it matters
Charge point operators in Korea are now a named contact in the emergency response chain, so accurate and current manager details become an operational requirement. Procurement teams elsewhere should expect similar expectations on site data, power isolation access and emergency contact information to appear in tender specifications.
Exicom board approves term sheet to sell Tritium at US$85 million enterprise value
Exicom's board has approved a term sheet that is not binding from a prospective buyer, valuing its DC fast charging subsidiary Tritium at an indicative US$85 million enterprise value on a cash free, debt free basis. The deal is subject to confirmatory due diligence, customary closing adjustments and final transaction documents. Exicom would keep a perpetual licence to the modular Tritium platform launched in June 2025 for Europe, which supports up to 64 chargepoints with 100kW, 200kW and 400kW dispensers.
Why it matters
Tritium's ownership and capital backing could change, which matters for buyers relying on its order book, warranties and long term support. Exicom's retained licence to the modular platform suggests the technology stays available to it, while the sale is meant to free capital for its India and export business and return it to being debt free.
25 November 2026
Switzerland edition · US edition · India edition · Global edition · China edition · France edition · Canada edition · UK edition · Austria edition · Belgium edition · Bulgaria edition · Croatia edition · Cyprus edition · Czech Republic edition · Denmark edition · Estonia edition · Finland edition · Germany edition · Greece edition · Hungary edition · Ireland edition · Italy edition · Latvia edition · Lithuania edition · Luxembourg edition · Malta edition · Netherlands edition · Poland edition · Portugal edition · Romania edition · Slovakia edition · Slovenia edition · Spain edition · Sweden edition · Australia edition · South Korea edition
Switzerland awards its first heavy truck fast charging network to Fastned, Obornes and Milence
Switzerland's Federal Roads Office (OFROU) has awarded all three lots of its first heavy truck fast charging network, picking three operators from eleven bids and favouring build quality and energy efficiency, according to French trade coverage. The network will have 82 chargers across 32 sites, including rest areas and heavy traffic control centres: Fastned wins lot 1 (11 sites), Obornes, the Ortec group subsidiary behind the Orève stations, wins lot 2 (10 sites), and Milence wins lot 3 (11 sites). CCS chargers must deliver at least 350 kW, seven sites will have at least one MCS charger, and the operators have two years to design projects and secure planning permits, then must finance, build and operate the chargers themselves.
Why it matters
This is a rare fully awarded national truck charging tender where winners carry the finance, build and operation risk, and the MCS requirement at seven sites signals where specification is heading. For CPOs, it shows that quality of construction and energy efficiency can outweigh other criteria in public awards, and the two-year permitting window sets a long lead time for suppliers.
New Jersey approves 19 station EV fast charging project with 152 ports
The New Jersey Department of Transportation has approved a statewide contract for 19 electric vehicle fast charging stations, including two planned along I-195, providing 152 publicly accessible ports in total. Each station will have eight 150 kW ports with both CCS and J3400 connectors, and sites must be within one mile of the highway and no more than 50 miles apart. Final station locations have not yet been selected, according to an update dated 25 November 2026, and the state already has more than 400 public DC fast charging stations.
Why it matters
The contract sets a clear technical and siting specification (eight 150 kW ports, dual connectors, highway proximity and spacing limits) that bidders and site hosts can plan against. With locations still to be chosen, siting and delivery details remain to be confirmed, so CPOs and developers should watch for further announcements.
Standex Electronics acquires solid-state transformer isolation specialist IsoGap
Standex Electronics, the electronics segment of Standex International, has acquired IsoGap, a North Carolina State University spinoff focused on isolation technology for power conversion in solid-state transformers. The deal adds power magnetics and R&D capability to its Standex Edge business, serving AI data centres, EV charging, battery energy storage and other grid and renewable infrastructure. Standex plans a Power Magnetics R&D Center in Raleigh, North Carolina, to advance and validate the technology and develop custom applications with customers, as reported by EVNews on 25 November 2026.
Why it matters
Medium-frequency transformers provide the galvanic isolation barrier in medium-voltage solid-state transformers, and insulation reliability under partial discharge is a key long-term risk as power levels rise. A supplier building dedicated R&D and customer co-development capacity in this area is worth watching for teams specifying high-power charging hubs that connect at medium voltage.
Jaipur Development Authority proposes 10 sites for new public EV charging stations
Around 10 public EV charging stations are planned across Jaipur, including Tonk Road, the Walled City, Vidhyadhar Nagar, Mansarovar and Jagatpura, as part of Rajasthan Renewable Energy Corporation Ltd's (RRECL) statewide expansion. The Jaipur Development Authority has sent RRECL a list of 10 potential sites, each with a minimum area of 200 square metres, and RRECL is reportedly preparing tenders to appoint agencies to install and operate the units. The Jaipur stations fall under a Centre-backed programme that has approved Rs 81.12 crore for 591 public EV charging stations across Rajasthan.
Why it matters
RRECL's forthcoming tenders will be an entry point for operators wanting to install and run chargers in Jaipur, with tariffs to be set by RRECL and the appointed agencies and the land authority compensated only for land use. The 591-station Rajasthan programme points to a wider pipeline of similar tenders across the state.
Gilbarco Veeder-Root expands into fleet charging in Belgium and the Netherlands with Mokobouw
US company Gilbarco Veeder-Root will deploy its Konect EV charging solutions for fleet operators in Belgium and the Netherlands, with long-time partner Mokobouw handling installation and ongoing servicing. The first private fleet deployment under the partnership was completed at MC Transport & Logistics in Dendermonde, and the companies intend to expand the offering to similar customers in both countries. The excerpt notes that the number of EV charging points in Belgium rose by around 23% in 2025.
Why it matters
A forecourt and retail specialist moving into commercial fleet charging adds a new competitor and partner option for fleet depot projects in Belgium and the Netherlands. The installer-led delivery and servicing model with a local partner is one to watch when comparing long-term support offers.
Statiq passes 1.3 million app downloads and reports coverage of over 1,000 cities in India
Statiq says its EV charging app has been downloaded more than 1.3 million times across Google Play Store and Apple App Store, and claims it is India's most downloaded EV charging app. The company reports more than 10,000 charging points across over 1,000 cities and says its network has facilitated more than 500 million green kilometres of travel. The app offers real-time availability, reservations, payments, RFID authentication and an Auto Charge feature, and Statiq also supplies its charging technology to partner platforms including those of Hyundai and Mercedes-Benz.
Why it matters
Statiq is positioning itself as an aggregation and software layer, with automaker platform integrations and AI-based predictive maintenance, which is relevant for CPOs weighing roaming and OEM access routes. The figures are company claims, so buyers should verify uptime and fault-handling performance before relying on them in procurement.
NIO targets more than 10,000 battery swap stations and RMB 350 billion of battery packs by 2030
NIO says its energy arm, NIO Power, will operate more than 10,000 battery swap stations and manage over RMB 350 billion ($52 billion) of battery packs by 2030, with more than 10 billion kWh delivered per year through charging and swapping. NIO had 4,252 swap stations and 5,584 charging stations in China as of 11 November, so the target needs roughly 1,400 new swap stations a year, against 679 added in 2024 and 681 in 2025. The targets were announced at NIO IN 2026 in Guangzhou, and NIO missed its 2021 goal of more than 4,000 swap stations worldwide by the end of 2025, reaching about 3,700 by February 2026, almost all in China.
Why it matters
The plan would roughly double the swap network, but the gap between the required build rate and recent delivery, plus the missed 2021 target, means suppliers and site partners should treat the timeline with caution. Any firm demand for swap hardware, sites or grid connections would depend on NIO actually lifting its pace of roll out.
Chargemap confirms user data theft linked to an old technical interface
Chargemap told users on 18 November 2026 that their data had been stolen, according to its communication as reported by Next and Bevolt. The attack reportedly took place on 8 November, was detected on 10 November and the flaw was fixed on 12 November, with an old technical interface said to be the cause. Exposed data includes email address, username and app language, and depending on the account may also include identity, phone number, date of birth, city, profile photo, subscription status and Google, Facebook or Apple login identifiers. Some former users who deleted their accounts may also be affected, and the company says it has notified the CNIL and is starting a complaint procedure.
Why it matters
Charge point operators and procurement teams that rely on Chargemap for driver discovery, roaming or app integrations should review their data sharing arrangements and security due diligence. The reported cause, a legacy interface, and the possible exposure of deleted accounts are reminders to test data retention and decommissioning as part of supplier assessments.
Halton Hills has no set timeline or dedicated funding for more municipal EV chargers
Usage at Town of Halton Hills EV chargers rose in 2025, with about 9,673 kilowatt hours delivered across 829 sessions. That is a nearly 7% rise in sessions and more than 12% more electricity dispensed than in 2024. The town runs 26 charging stations at municipal properties in Georgetown and Acton, and says any expansion depends on private partners and grant funding.
Why it matters
Municipal expansion in Halton Hills is not budgeted, so any new sites are likely to come through private partnerships or grant backed projects. CPOs and funders should note the town is looking outside its own budget to deliver more chargers, and that usage is growing from a small base.
ChargePoint partners with Kässbohrer to bring DC fast chargers to ski resorts
ChargePoint has partnered with Kässbohrer, maker of the PistenBully slope groomer, to target ski resorts in North America and Europe. The partnership, effective immediately, puts Kässbohrer's customers, from ski resort operators to public parking operators, in direct contact with ChargePoint's hardware and software. Resorts and indoor ski facilities can access a charging ecosystem for electric snow groomers and other EVs in their fleets, according to InsideEVs.
Why it matters
Ski resorts and similar sites are a niche channel for heavy-duty and fleet charging, reached through an established equipment maker's customer base rather than through conventional site acquisition. CPOs and installers may see new demand at remote, cold-climate locations where charger selection could be shaped by the Kässbohrer relationship.
UK public EV charger network reaches 124,738 as DfT reports 8,686 added in 2026 to 1 October
The UK had 124,738 public chargers at 1 October 2026, or 180.0 per 100,000 residents, according to Department for Transport statistics published on 25 November. Of these, 29,772 were rated at 50kW or above (42.9 per 100,000 residents), and 8,686 chargers were added in 2026 up to 1 October, against 13,281 across the whole of 2025, though the periods differ. By power, 49% were 3kW to below 8kW, 27% were 8kW to below 50kW, 12% were 50kW to below 150kW and 12% were 150kW or above, while by type 52% were destination, 33% on street, 11% en route and 4% other.
Why it matters
Only around a quarter of the network is rated at 50kW or above, and DfT notes London has the second lowest per capita provision at that level because of its on street, lower power mix, so rapid capacity remains the gap for bids and site pipelines. In England, 9,616 rapid or higher chargers sit within one mile of the Strategic Road Network, with 8,857 classed as open access, giving a baseline for corridor coverage.
PLUG Charging launches in-house maintenance division and hires Cardiff field engineer
PLUG Charging has brought the testing, inspection, fault response and maintenance of its EV charging network fully under its own management through a new in-house division. Field Engineer Connor Ogden, formerly an Approved Electrician at Virtua UK Ltd, has joined in Cardiff to establish the service, focusing on resilience for depot charging active with Welsh authorities and fault response at PLUG's public charging locations. The company said the move gives it direct control over response times and service quality.
Why it matters
For public sector fleet buyers and CPOs, an operator that handles maintenance in-house offers a clearer line of accountability on uptime than one relying on subcontracted service. It is a signal to test operations and maintenance claims, response commitments and local engineering capacity when assessing charging suppliers.
myenergi and PAUA partner to simplify home charging reimbursement for company car and van drivers
myenergi and EV charging platform PAUA have created plans to make it easier for company car and van drivers to be reimbursed for home charging, as reported on 25 November 2026 by James Evison. The partnership links myenergi's zappi home chargers with PAUA Reimburse, which automatically records charging sessions and calculates costs against the driver's own electricity tariff rather than relying on estimates. It can also use mileage information to separate business and personal journeys, so employers cover the appropriate share, and it supports a wide range of smart tariffs and home solar use.
Why it matters
Home charging can be cheaper than public points, but tariff variation and mixed journeys make accurate reimbursement hard for fleets. Automated, tariff-based reimbursement tied to the charger could reduce manual mileage claims and give fleet buyers a clearer case for home charging schemes.
Delhi government plans 540 public EV chargers across 180 locations
Delhi's nodal agency Transco has started appointing operators to set up and run 540 chargers at 180 sites under the PM e drive scheme, using the charger configuration approved by the Ministry of Heavy Industries, according to Latest News Delhi. Each site is to have one 12 kW charger for electric two and three wheelers, one 60 kW charger for N1 goods carriers and four wheelers, and one 120 kW fast charger, all with two guns. The project is estimated at around ₹62 crore.
Why it matters
The sites are split into two packages of 90, with Package 1 covering western and northern Delhi and Package 2 covering southern, New Delhi and eastern Delhi, so operators can plan bids by geography. The Delhi EV Policy 2026 phased electrification mandate for three wheelers and N1 goods carriers points to demand for the lower power and goods vehicle charging at these sites.
IONNA, the eight automaker charging joint venture, positions 400kW chargers against Tesla Supercharger at LA Auto Show
In an interview at the LA Auto Show on 19 November, IONNA CEO Seth Cutler said the network aims to be trusted, reasonably priced and convenient for every EV driver. IONNA, founded in 2023 by Hyundai, Kia, BMW, GM, Honda, Mercedes-Benz, Stellantis and Toyota, supports outputs of up to 400kW, which the report says is 60% above Tesla's V3 Supercharger (250kW) and 14% above Electrify America and EVgo (350kW). A Hyundai Ioniq 5 is cited as charging from 10% to 80% in about 20 minutes.
Why it matters
An automaker-backed network pairing higher power ratings with price competitiveness and rapid roll-out raises the benchmark for rival CPOs and for site hosts weighing hardware and partner choices. Procurement teams should expect 400kW to feature more often in tender specifications and competitor comparisons.
Staffordshire County Council backs revised LEVI programme with four Stone sites on indicative list
Staffordshire County Council, led by Reform UK, has approved a new Local Electric Vehicle Infrastructure programme covering publicly accessible charging in car parks and community hubs, plus a trial of cross-pavement charging for eligible households without off-street parking. An indicative list includes four sites in Stone: Anglers Car Park, Canalside, Christchurch Way and Riverside, none of which are confirmed. The council was allocated £4.6 million of LEVI funding in 2024, and the previous Conservative administration had committed 90% of it to a Midlands consortium procurement with Nottinghamshire and Derbyshire, according to the Local Democracy Reporting Service.
Why it matters
The council still needs Government approval for its revised approach before it finalises procurement and the site portfolio, so timing and route to market remain open. Suppliers and CPOs should note the move away from the consortium procurement and the inclusion of a cross-pavement charging trial.
Daimler Truck TruckCharge Network now available in 21 European countries
Daimler Truck has expanded its TruckCharge Network to 21 European countries, bringing private, semi-public and public charging together so battery-electric truck operators can charge beyond their own depots. The article says Milence became the first public charging operator integrated into the network in August 2026, giving TruckCharge customers access to approximately 300 truck-compatible fast-charging points across Europe without additional roaming fees. Milence was founded in 2022 as a joint venture between Daimler Truck, the TRATON GROUP and Volvo Group.
Why it matters
A single network that combines depot, semi-public and public charging with no extra roaming fees points to simpler access for fleets, and shows large truck makers working with brand-independent operators like Milence. CPOs and site developers should note that integration into OEM-led networks is becoming a route to demand for heavy-duty charging.
Exicom to sell Tritium just over two years after acquiring the fast charger maker out of administration
Indian power technology company Exicom is looking to divest Tritium, the Brisbane-founded DC fast charger manufacturer it bought in August 2024 after the company entered insolvency in April 2024. Exicom says Tritium has the "highest order book since the acquisition with a clear path to profitability", but that it "remains capital intensive" when weighed against "aggressive" growth plans in India and other export markets. The news was reported in a trade publication article on the planned sale.
Why it matters
Buyers and CPOs with Tritium hardware in service or on order face fresh questions over ownership, warranty and long term support until a new owner is confirmed. Those evaluating suppliers should seek clarity on continuity of service and spares, particularly in Australia where Tritium has been a dominant player.
France's public charging network grows to 203,993 points as a record 10% are unavailable for over a week
The Avere France barometer, reported by Bevolt on 24 November, found that 10% of public charge points were unavailable for more than seven consecutive days in October 2026, a record level. Only 60% of points were available 99% of the time, down from 70% a year earlier, though the remaining 40% were not necessarily out of service. The network added 1,189 points in October and 18,490 since January 2026, compared with more than 26,000 in the first ten months of 2025.
Why it matters
Rollout is slowing while prolonged downtime is rising, which puts the focus on uptime performance and maintenance responsiveness over raw installation counts. CPOs and buyers in France should expect availability and repair commitments to carry more weight in tenders and contracts.
Hyundai Motor Group unveils unified HMG Global AC Charger for Hyundai, Kia and Genesis ahead of 2027 global rollout
Hyundai Motor Group has unveiled the HMG Global AC Charger, a home charger that consolidates designs and user experiences that previously varied by brand and market. The automaker said on Wednesday that it will launch in Korea with 7 kilowatt and 11 kilowatt output options and Type 1 (J1772) support, in wall-mounted and freestanding versions, before an international rollout beginning in 2027. Hyundai Motor and Kia led product planning, technology and design, while Hyundai Kefico took part in development and will oversee mass production.
Why it matters
A single branded home charger across three marques signals the group is standardising its home charging hardware, which could shape installer and supplier relationships as the rollout widens from 2027. The separation of installation and wiring components from the functional charging unit is worth watching for its potential effect on installation and servicing workflows.
Delhi and NCR have 12.94 lakh EVs but only 16,785 charging points, CAQM report says
The Hindu, citing the Commission for Air Quality Management (CAQM) status report submitted to the Supreme Court, reports that Delhi, Uttar Pradesh, Haryana and Rajasthan have 12.94 lakh registered EVs supported by 16,785 charging points. Delhi has 14,913 operational points for 6,83,251 EVs, or 88.85% of the total, against 565 points for 3,47,587 EVs in Uttar Pradesh, 1,285 for 2,18,530 in Haryana and 22 for 44,987 in Rajasthan. The report also flags limited enforcement against end of life vehicles and uneven progress in the shift to electric mobility.
Why it matters
Outside Delhi, charging provision is very thin compared with the number of EVs on the road, which points to unmet demand in Uttar Pradesh, Haryana and Rajasthan. With the issue now before the Supreme Court, regulatory pressure to expand networks across the wider region may increase, which would be relevant for CPOs and those bidding for rollout work.
Bank of Baroda joins SBI, Indian Bank and Central Bank of India with a dedicated EV charging loan scheme
Bank of Baroda launched bob Green PLUG on 19 November, offering term or demand loans of above ₹10 lakh and up to ₹5 crore for EV charging stations, battery swapping facilities and allied infrastructure. Interest rates run from 8.15% to 9.60% per annum, linked to its Baroda Repo Linked Lending Rate, with repayment of up to 120 months including a moratorium of up to 12 months. A roundup of Indian bank schemes notes that SBI, Indian Bank and Central Bank of India already have products aimed at businesses and MSMEs in the segment.
Why it matters
More public sector lenders now offer dedicated debt for charging and swapping projects, giving CPOs, fleet operators and site hosts more options to compare on rate, tenor and moratorium. Eligibility also covers solar powered charging sites, which is relevant for renewable integrated builds.
Bank of Baroda · SBI · Source
GM signs agreement with Tesla to adopt NACS and open Supercharger access in Korea
General Motors said on the 25th that it has signed an agreement with Tesla on the North American Charging Standard (NACS) to make electric vehicle charging more convenient in Korea. The deal extends an earlier GM and Tesla arrangement in North America to the Korean market, and GM plans to introduce EVs with NACS ports and give users access to Tesla's Supercharger network. GM's EVs sold in Korea have so far used CCS Combo 1 ports, the Korean standard, and existing CCS models can use NACS charging with an adapter.
Why it matters
A major foreign OEM moving towards NACS in a CCS Combo 1 market could shift where its drivers charge, putting Tesla's Supercharger network in more direct competition with other Korean networks for those drivers. CPOs and procurement teams in Korea may need to weigh connector strategy and adapter use as mixed standards appear on the road.
24 November 2026
India edition · US edition · France edition · UK edition
Two public EV charging stations in Cyberabad's Serilingampally zone out of service, with cables missing
Two public EV charging stations in the Serilingampally zone of the Cyberabad Municipal Corporation, Hyderabad, have stopped working, according to local press reporting. They are located in front of IIIT Hyderabad and opposite Gachibowli Stadium, and the charging cables appear to be missing, raising suspicion of cable theft. The report notes that CCTV cameras stand near the stations, which has prompted questions about security and monitoring of the equipment.
Why it matters
Suspected cable theft at busy, camera-covered sites shows that uptime and physical security are operational risks that tender specifications and O&M contracts need to address. For CPOs, unclear responsibility for monitoring and repair can leave public assets idle and damage user confidence.
Powercor installs seven pole mounted EV chargers around Apollo Bay in regional Victoria
Australian distribution network operator Powercor has installed seven pole mounted EV chargers across the Colac Otway Shire, in and around Apollo Bay, about three hours from Melbourne. Each unit has one or two 22 kW sockets for streetside charging, enough to take most vehicles to 80 per cent in around four hours. The sites are part of a 100 charger rollout across the CitiPower, Powercor and United Energy networks, where all 100 sites have now been identified, and the Apollo Bay chargers were delivered in partnership with Colac Otway Shire.
Why it matters
Network operators are putting low cost AC kerbside charging on their own poles and working with councils to fill regional coverage gaps, a model that can cut civil works and connection effort per site. CPOs and bidders should note the distributor led route as both a potential partnership channel and a competing source of public charging.
Rajasthan seeks private land for public EV charging stations along highways
Rajasthan Renewable Energy Corporation Ltd (RRECL) has begun mobilising private land along national highways and major state roads for public EV charging stations, with fuel stations, hotels, dhabas and commercial establishments expected to play a key role. Fuel stations would need to offer a minimum land parcel of 200 sqm, and landowners are likely to be paid through lease rentals, revenue sharing, commercial development rights or a combination. RRECL is also close to finalising proposals under an earlier tender for over 250 charging stations on government land, with awards expected soon, as reported in the source article.
Why it matters
A second route to sites beyond limited government land could widen the pipeline for CPOs in Rajasthan, with commercial terms likely to be lease or revenue-share based. Any extension of PM E-Drive support, which covers up to 80% of upstream infrastructure cost such as transformers and connectivity, to private land would materially improve project viability, though the article says RRECL still has to approach the Centre on this.
Mercedes Benz High Power Charging offers 25% off DC fast charging over the 2026 holiday period
Mercedes Benz High Power Charging, working with State of Charge, is offering 25% off DC fast charging at participating Mercedes Benz HPC locations from 25 November 2026 to 3 January 2027. Drivers must enter promo code TOM25 at the charger and start the session with a credit card directly at the charger, according to EVChargingStations.com. The offer applies only to participating sites, and the article points to further details on its terms.
Why it matters
A network operator is using a time limited, code based discount to draw holiday road trip demand to its premium sites, which is a useful signal on utilisation tactics. The requirement to start sessions by card at the charger also shows how promotions can be tied to specific payment methods, which matters when specifying payment and pricing capability.
A charger labelled up to 300 kW can deliver less than a 150 kW unit when power is shared
A French language article argues that the headline figure on a charger is only one of several limits. A "up to 300 kW" unit can give a car under 150 kW if the 300 kW is split across several outputs, while dynamic allocation can raise a driver's power mid session as other cars draw less. It compares three fictional sites with identical cars, using reserved power, a fixed equal split and dynamic allocation, and cites Kempower's technical manual on the separate limits of vehicle, charge point and site.
Why it matters
Specifying and marketing sites by headline kW can mislead drivers and tenders, so procurement teams should ask how power is shared between outputs and what a driver receives when the site is busy. Power sharing architecture affects real session speed, throughput per bay and how a CPO should describe its offer.
InstaVolt brings ultra-rapid charging to first 8 upgraded Premier Inn sites across the UK
InstaVolt has upgraded existing charging facilities at the first 8 Premier Inn sites, less than a month after announcing its partnership with Whitbread PLC. Sites range from the Scottish Highlands to the Devon coast, including one near London Heathrow, with a dedicated charger for every bay and access via contactless card, the InstaVolt app or RFID card with no subscription. App and RFID users pay 55p per kWh between 8pm and 7am, and sessions started before 7am keep that rate for the whole charge.
Why it matters
The upgrade of existing hotel chain charging, with one charger per bay and more sites moving through design, planning and construction, shows how quickly a host partnership can move from announcement to live sites. Off-peak pricing at 55p per kWh and a dedicated unit for every bay set a visible benchmark for destination charging offers on hospitality estates.