UK EV News
UK · This year
Stories
EV Charging
EZO plans more than 250 new public charging locations in the North of Scotland by 2030
EZO, a charge point operator based in the UK and Ireland, has opened the first of more than 250 planned sites in Aviemore, with one 50kW DC charger and two 11kW AC chargers. The rollout sits under a 20 year partnership with Aberdeen City, Aberdeenshire, Highland and Moray councils, the first inter-council contract awarded through the Scottish Government's Electric Vehicle Infrastructure Fund, with Transport Scotland committing more than £7m. EZO is also progressing a further 51 fully self-funded sites, has migrated 385 public chargers from ChargePlace Scotland to its platform, and is replacing 77 existing chargers.
Why it matters
This shows a multi-council concession model backed by public funding and operator investment, which sets a template for regional tenders in Scotland. The migration of 385 ChargePlace Scotland chargers to EZO's platform also points to operators consolidating legacy networks and prioritising reliability.
Andersen EV expands Bedfordshire manufacturing and introduces same-day dispatch for home chargers
Andersen EV has taken an additional unit alongside its existing facility in Stewartby, Bedfordshire, adding production space and capacity after sales volumes more than doubled year on year in the third quarter. The company is also investing in new technologies and introducing AI into its production processes. Orders for the A2, A3 and Andersen Quartz home chargers placed before 11am on a working day can now be dispatched the same day in the chosen colour and specification.
Why it matters
A UK manufacturer adding capacity and offering same-day dispatch on its home charger ranges points to shorter lead times and greater supply confidence for installers and procurement teams specifying residential units. It also shows demand for design-led home charging is strong enough to justify further investment in domestic production.
myenergi and PAUA partner to simplify home charging reimbursement for company car and van drivers
myenergi and EV charging platform PAUA have created plans to make it easier for company car and van drivers to be reimbursed for home charging, as reported on 25 November 2026 by James Evison. The partnership links myenergi's zappi home chargers with PAUA Reimburse, which automatically records charging sessions and calculates costs against the driver's own electricity tariff rather than relying on estimates. It can also use mileage information to separate business and personal journeys, so employers cover the appropriate share, and it supports a wide range of smart tariffs and home solar use.
Why it matters
Home charging can be cheaper than public points, but tariff variation and mixed journeys make accurate reimbursement hard for fleets. Automated, tariff-based reimbursement tied to the charger could reduce manual mileage claims and give fleet buyers a clearer case for home charging schemes.
Staffordshire County Council backs revised LEVI programme with four Stone sites on indicative list
Staffordshire County Council, led by Reform UK, has approved a new Local Electric Vehicle Infrastructure programme covering publicly accessible charging in car parks and community hubs, plus a trial of cross-pavement charging for eligible households without off-street parking. An indicative list includes four sites in Stone: Anglers Car Park, Canalside, Christchurch Way and Riverside, none of which are confirmed. The council was allocated £4.6 million of LEVI funding in 2024, and the previous Conservative administration had committed 90% of it to a Midlands consortium procurement with Nottinghamshire and Derbyshire, according to the Local Democracy Reporting Service.
Why it matters
The council still needs Government approval for its revised approach before it finalises procurement and the site portfolio, so timing and route to market remain open. Suppliers and CPOs should note the move away from the consortium procurement and the inclusion of a cross-pavement charging trial.
Daimler Truck TruckCharge Network now available in 21 European countries
Daimler Truck has expanded its TruckCharge Network to 21 European countries, bringing private, semi-public and public charging together so battery-electric truck operators can charge beyond their own depots. The article says Milence became the first public charging operator integrated into the network in August 2026, giving TruckCharge customers access to approximately 300 truck-compatible fast-charging points across Europe without additional roaming fees. Milence was founded in 2022 as a joint venture between Daimler Truck, the TRATON GROUP and Volvo Group.
Why it matters
A single network that combines depot, semi-public and public charging with no extra roaming fees points to simpler access for fleets, and shows large truck makers working with brand-independent operators like Milence. CPOs and site developers should note that integration into OEM-led networks is becoming a route to demand for heavy-duty charging.
InstaVolt brings ultra-rapid charging to first 8 upgraded Premier Inn sites across the UK
InstaVolt has upgraded existing charging facilities at the first 8 Premier Inn sites, less than a month after announcing its partnership with Whitbread PLC. Sites range from the Scottish Highlands to the Devon coast, including one near London Heathrow, with a dedicated charger for every bay and access via contactless card, the InstaVolt app or RFID card with no subscription. App and RFID users pay 55p per kWh between 8pm and 7am, and sessions started before 7am keep that rate for the whole charge.
Why it matters
The upgrade of existing hotel chain charging, with one charger per bay and more sites moving through design, planning and construction, shows how quickly a host partnership can move from announcement to live sites. Off-peak pricing at 55p per kWh and a dedicated unit for every bay set a visible benchmark for destination charging offers on hospitality estates.
Welch's Transport opens megawatt-scale eHGV charging hub at Cambridge headquarters and earns revenue from shared access
Welch's Transport has opened a six-bay eHGV charging hub at its Cambridge headquarters under the UK's eFREIGHT 2030 initiative, using Voltempo's HyperCharger, which can deliver up to 1 megawatt of dynamically distributed power across multiple charging points. The site has two full-length drive-in, drive-out bays for tractor and trailer combinations and four tractor-unit bays, and a second six-bay, 1 megawatt hub at Bedford is soon to be energised. Welch's earns revenue by sharing the infrastructure with other local operators through Voltempo's DepotCharge model, and 12% of its truck fleet will be electric by January, according to a report dated 24 November 2026.
Why it matters
The DepotCharge model shows how a fleet depot can recover charger costs by opening up spare capacity to third parties, a route to consider for CPOs and fleet buyers weighing shared depot access. The eFREIGHT 2030 programme covers 36 sites, including 25 megawatt-scale hubs, which points to a growing pipeline of heavy-duty charging work in the UK.
Fastned opens first automated store at new 10-bay Gateshead charging hub
Fastned has opened its first automated self-serve store at a new Gateshead hub on Askew Road, pairing a 24-hour contactless convenience store and café with 10 ultra-rapid bays rated at up to 400kW each, which the company says can add up to 200 miles of range in ten minutes. Visitors tap a debit or credit card to enter, with payment taken when items are picked up. It is the first of five automated stores planned across Fastned's UK network, which currently stands at 270 chargers across 42 locations.
Why it matters
Fastned is testing an unstaffed retail offer on its ultra-rapid sites, which could shape amenity expectations in site bids and host negotiations. The extra-wide bays for wheelchair and mobility aid access and the suspended cable systems also show where accessibility and usability standards for new hubs are heading.
TotalEnergies appointed to deliver more than 1,500 22 kW chargers in Tower Hamlets under LEVI
Tower Hamlets Council has appointed TotalEnergies to deliver more than 1,500 new 22 kW AC charging points across the east London borough, the first LEVI-funded charging contract awarded in the capital. The first installation is scheduled for December at Pritchards Road, with the rollout continuing over the following four years. The borough is receiving a share of more than £1.2 million in government investment, which the council said can help unlock private-sector funding, and TotalEnergies will supply all electricity from renewable sources.
Why it matters
This is a London LEVI award to an established operator with more than 3,200 charge points in the capital, a useful signal for how boroughs are structuring on-street contracts. With 93% of Tower Hamlets households lacking off-street parking and the borough already at around 2,350 public charge points, it shows where demand and council appetite are strongest.
Raw Charging opens 10 charger ultra-rapid hub in South Harrow, London
Raw Charging has opened a South Harrow hub on South Vale with 10 ultra-rapid chargers offering up to 300kW, including a priority bay for disabled drivers and those needing extra space. It targets taxi, private hire and delivery drivers, and follows Raw's Forest Hill hub of 12 chargers on Dartmouth Road, as well as its Aberdeen and Dudley Port sites. The chargers accept contactless payment, support major EV charging apps and have 24/7 customer support, and Raw was named Zapmap Best Destination Network for 2026 and holds ICC Gold accreditation.
Why it matters
Raw is replicating its Forest Hill model in a second London location, which signals a repeatable template for high-volume commercial driver charging that bidders and landowners can benchmark against. Contactless payment, app roaming and priority bay provision show the service standards now expected on urban ultra-rapid sites.
UK Government acknowledges concerns over payment holds of up to £50 at public EV charge points
The Department for Transport has confirmed that the amount temporarily held in drivers' bank accounts at public charging points can be up to £50 and varies between charging operators, while the time before funds are released differs significantly by card issuer. The issue was raised in a written parliamentary question by Conservative MP Rebecca Paul, who asked whether ministers had discussed reducing the amounts and duration of holds with operators, payment providers and the Financial Conduct Authority. Transport minister Simon Lightwood acknowledged the concerns in his written response, though the excerpt is cut off before his full reply.
Why it matters
Pre-authorisation holds are a visible friction point for contactless and card payments, and ministerial attention could lead to scrutiny of how operators set hold amounts. CPOs and those specifying payment systems should review their hold levels and how clearly they are communicated to drivers.
Specialist warns of safety risk from ageing 'orphan' private EV chargers in the UK
Safer Charging has warned that hundreds of thousands of private EV chargers have not been inspected since installation, creating a growing pool of 'orphan' devices. Public chargers face minimum operational targets that ensure routine checks and maintenance, but private devices, including home wallboxes and small networks in depots, offices, public sector sites and housing blocks, have no such requirements. Chief executive Chris Cheetham said some installers or manufacturers have gone out of business, leaving customers without support, and that failures could range from devices simply stopping working to, in extreme cases, a fire risk.
Why it matters
Private and semi-public estates such as depots, housing blocks and public sector sites carry unregulated maintenance risk, which creates a market for ongoing service contracts and raises due diligence questions about installer longevity in procurement. CPOs and site owners should check who is responsible for upkeep after installation and what happens if the supplier exits.
Siemens and First Bus sign five-year maintenance deal for 1,000 UK DC charge points
Siemens and First Bus have agreed a new five-year contract covering maintenance and servicing of 1,000 DC charge points across the UK. The scope includes 24/7 remote support, proactive monitoring, preventative maintenance, rapid on-site intervention, repairs and replacement parts. First Bus has more than 1,500 zero-emission buses, over a quarter of its fleet, and the deal builds on a partnership that began in 2021 with the Caledonia Depot in Glasgow, which now has more than 170 charging points.
Why it matters
Long-term lifecycle service contracts are becoming a core part of depot electrification, with operators locking in uptime and availability across large charger estates rather than buying hardware alone. For CPOs and service providers, this shows the bus sector rewarding established delivery partners with extended maintenance work as fleets scale towards First Bus's 2035 zero-emission commitment.
EV 'class divide' between home and public charging as Andy Burnham comes under pressure over driveway rules
A report says EV owners charging at home pay 0% VAT at rates as low as 7p per kWh, while public charging carries 20% VAT and fees of around 50p per kWh. StartRescue estimates that over 10,000 miles home charging costs about £175 against around £1,125 on public chargers, and suggests public users pay as much as £1,000 more per year. The article says Andy Burnham is under pressure to change the plan, after the Prime Minister decided to cut domestic VAT from 5% to 0% from 1 October.
Why it matters
The gap between home and public charging costs keeps pressure on VAT treatment and pricing for drivers without driveways, who depend on public networks. CPOs and funders should expect continued scrutiny of public tariffs and a political push to narrow the difference.
UK EV drivers need two or three charging apps as rapid prices range from 55p to 93p a kWh
A UK consumer guide says a new EV driver needs one app from their most used network, a roaming app and a map. It puts rapid charging at 55p to 93p a kWh depending on the charger owner, the time of day and the app used. The Department for Transport counted 121,171 public chargers on 1 July 2026, 28,887 of them rapid or faster at 50kW and above, while Zapmap put the total at 126,140 at the end of October, with 30,060 rapid or ultra rapid chargers, roughly 24%.
Why it matters
The same rapid charger can be sold at very different prices depending on whether the driver pays through the CPO's own app or a roaming EMSP, so the customer-facing channel affects both revenue and driver choice. The guide also notes DfT has moved its baseline from charging devices (97,266 in July) to chargers, so anyone benchmarking network growth should check which measure they are comparing.
Paua opens 13 Stagecoach Chargd depot sites to commercial fleets, offering 652 connectors
Paua, the UK EV charging platform for commercial fleets, has opened access to 13 Stagecoach Chargd locations offering 652 connectors to approved business fleets. The network runs from Dover to Aberdeen and includes Cambridge, Oxford, London, Sunderland and Inverness. Chargd is Stagecoach's commercial proposition that opens spare capacity at bus depots, originally installed for electric buses, to approved fleets when capacity is available.
Why it matters
Shared depot charging adds a further option for fleets alongside public, home, workplace and own depot charging, and puts existing high powered assets to wider use. For CPOs and funders, it shows demand for third party access to underused depot capacity, and a route to improve utilisation without building new sites.
Paua · Stagecoach · Chargd · Source
UK driver finds public charging cost over 12 times his home tariff on a 626 mile trip
Content creator Ben Goes Electric drove a Volvo EX40 Twin Motor 626 miles over three days, making four unplanned public charging stops, as reported by The Cool Down citing Supercar Blondie. Public charging took 114 minutes and cost £128.66, and with £5.10 of home charging the total was £133.76, or about 21.4 pence per mile, against an estimated £122 for a petrol SUV. At Cherwell Valley Services a charger advertised at up to 350 kilowatts delivered just 38 kilowatts because of power restrictions.
Why it matters
Public pricing that far above home tariffs can erase the running cost advantage on long journeys, which puts rate transparency under scrutiny for operators. A site that delivers 38 kilowatts from a 350 kilowatt unit also shows why buyers should check the power a site can actually deliver, not just the rated hardware.
New drive to boost EV charging across Argyll and Bute
West Coast Today reports a new drive to expand EV charging across Argyll and Bute in western Scotland. The article sits behind a subscription wall, so the available text gives no figures on funding, site numbers, delivery partners or timelines.
Why it matters
Rural and island areas are often where public charging provision is thinnest, so any new programme here could lead to future funding calls or tenders. Until details are published, treat it as a signal to monitor rather than an actionable opportunity.
Zest installs six 75kW rapid chargepoints at Weston Favell Shopping Centre in Northampton
Zest has installed six 75kW rapid chargepoints at Weston Favell Shopping Centre in Northampton, with Zest funding, deploying and operating the infrastructure under the agreement. The site joins a growing UK retail portfolio that includes Metrocentre in Gateshead, Merry Hill in the West Midlands, Frenchgate in Doncaster, Time Square in Warrington, Chantry Place in Norwich and the Kennedy Centre in Belfast. The centre reports nearly six million visitors a year, including more than two million vehicle visits.
Why it matters
Zest's model of funding and operating chargepoints at its own cost on retail sites shows how landlords can add charging without capital outlay, and how a CPO can scale through repeat deals with shopping centre owners. High footfall sites with dwell time remain a clear route for rapid charger rollout.
Kerb-integrated EV charge points to be trialled in East Lothian
Centrica's research and development company Energised Futures, vehicle component developer Pierburg and East Lothian Council have launched a trial of kerb-integrated EV charging for residential streets and space-constrained locations. Three chargers have been installed, one in a residential street and two in a public car park by the nearby beach. The trial is largely focused on evidence gathering, with Zapmap's Home and Community Charging Stats as of August 2026 showing nearly a third of UK households have no driveway or dedicated off-street parking.
Why it matters
The trial will assess installation and maintenance requirements, technical performance, reliability, utilisation and public acceptance of kerb-integrated charging, and the findings should inform Centrica's public charging strategy. For CPOs and local authorities serving households without off-street parking, it offers early evidence on whether this format could be a viable alternative to conventional on-street units.
Survey finds 44% of EV fleets rely on drivers to self-report home charging costs, leaving expenses fraud exposure
A survey of 250 fleet, finance and procurement leaders, commissioned by mobility software firm Cubic3, found that 48% had expenses claims they could not verify in the last 12 months, 31% reported unauthorised transactions on company credit or fuel and charging cards, and 30% had at least one suspected or confirmed fraud case. While 93% said they could identify unauthorised or fraudulent spend, only 41% said their expenses were under control, and 54% said EV charging made payment and spend management more complicated, a process averaging 171 hours per year.
Why it matters
Weak verification of home charging claims points to demand for tools that capture and reconcile charging spend, which matters for CPOs and suppliers selling to fleets. Procurement teams assessing charging payment and reimbursement options can use these figures to make the case for better data and controls.
TotalEnergies signs deal to deliver 1,500 EV charge points in Tower Hamlets under LEVI funding
TotalEnergies has signed an agreement to deliver 1,500 new EV chargers for the London Borough of Tower Hamlets over four years, in what is described as the first government LEVI-funded charging contract awarded in London. The network will use AC 22kW fast charging sockets, and TotalEnergies will deliver and operate the infrastructure as well as supply the electricity, 100% of which is sourced from renewable generation. The first installation is scheduled to begin in December 2026, with the network expanding progressively across the borough; TotalEnergies currently operates more than 3,200 charge points across London.
Why it matters
This is the first LEVI-funded contract awarded in London, which gives CPOs and funders a reference point for how the scheme is being packaged in the capital. The combined delivery, operation and electricity supply model shows the integrated offer a local authority is willing to award at scale, and the December 2026 start sets a clear timeline for the pipeline.
InstaVolt opens 10 charger ultra-rapid hub at Harlech Retail Park in Newport
InstaVolt has launched a new site at Harlech Retail Park in Newport, 1.7 miles from the M4, with 10 ultra-rapid 160kW chargers powered by 100% renewable energy. The hub has two fully accessible bays, contactless payment and 24/7 access, with an off-peak rate of 55p per kWh between 8pm and 7am for app or RFID card users. The site sits alongside Tesco and McDonald's, and the announcement quotes CEO Delvin Lane describing it as part of continued investment in a future-ready network.
Why it matters
A retail park location close to a motorway junction shows the continued appeal of host sites that serve both strategic route traffic and local demand. The published off-peak tariff and accessible bay provision also offer a useful benchmark for competing CPOs and site hosts.
Maintenance firm warns thousands of private EV chargers have gone years without inspection
Safer Charging, a maintenance company, says thousands of residential and workplace EV chargers in the UK have not been inspected since installation. Public chargers must meet the Public Charge Point Regulations (PCPR), which require them to work 99% of the time, but private chargers fall under no equivalent legislation. Founder Chris Cheetham said he believes there are hundreds of thousands of ageing private chargers that are not being inspected or maintained, and pointed to Andersen EV, which went into administration in 2022, with its chargers bought before 24 October 2022 no longer carrying contractual warranty support.
Why it matters
Private and workplace chargers sit outside the PCPR reliability regime, so maintenance, warranty cover and supplier viability depend on the buyer's own due diligence. That points to a growing market for inspection and aftercare contracts, and a reason for procurers to test the long-term financial standing of suppliers and installers.
i-media wins exclusive advertising rights across Gridserve's UK electric vehicle charging sites
Motorway advertising company i-media has signed an exclusive partnership with charging operator Gridserve covering advertising at its Electric Forecourts, a national network of screens built into its chargers, and the experiential rights at its sites. i-media says the agreement takes its network of screens aimed at electric vehicle drivers to more than 1,000, and cites an average charging stop of 27 minutes. The release does not disclose the deal value, contract length, campaign start date or how many of those screens are at Gridserve locations.
Why it matters
Charging dwell time is being packaged as a media asset, so site hosts and operators should expect advertising and experiential rights to feature in host and partner negotiations. With no price, term or Gridserve screen count published, the commercial terms and revenue share remain unclear.
UK rapid charging could cost 33% more per mile than a petrol hybrid in 2027
A Turkish language report citing an assessment by The Fast Charge and UK charge point operator Zest says public rapid charging tariffs could rise from 79p to £1.03 per kWh in 2027. On that basis a Tesla Model Y Long Range RWD could cost more than 20p per mile on public rapid chargers, against about 15p per mile for a Nissan Qashqai hybrid doing a real world 50 mpg at current petrol prices. The report puts the gap at roughly 33% for drivers relying only on public rapid charging, and links the rise to rising grid costs and an Ofgem charging decision taken in 2019 and in force since 2022.
Why it matters
Network charges that follow the maximum a site can draw, rather than actual consumption, put pressure on rapid charging margins and on the prices CPOs can set. Drivers without home charging are most exposed, so tariff risk and grid connection costs should be built into site selection and bid pricing.
InstaVolt to add 24/7 driver facilities building at Banbury Superhub in early 2027
InstaVolt will open a new building beside its Banbury Superhub, just off Junction 11 of the M40, in early 2027, offering free WiFi, hot and cold drinks and an accessible toilet open 24 hours a day, with entry via the InstaVolt app. The site opened with eight chargers in 2020 and has grown to 32, since upgraded to 160kW ultra-rapid speeds. The announcement also promotes an off-peak rate of 55p per kWh between 8pm and 7am for users of the subscription-free InstaVolt app.
Why it matters
A major CPO is adding round-the-clock amenities to an established hub in response to customer feedback, which signals that on-site facilities are becoming part of the competitive offer alongside charger count and speed. The off-peak rate also shows how operators are using pricing to encourage overnight and early-morning use.
Safer Charging offers to maintain orphaned EV chargers for UK site owners
Safer Charging, a UK EV charge point maintenance specialist, audits installations for site owners who no longer know who is responsible for maintaining their chargers, then offers to maintain, inspect and repair units from any manufacturer. Founder and CEO Chris Cheetham said warranties are expiring, some installers have gone bust and taken maintenance contracts with them, and some manufacturers have left the UK. The article notes that public operators must meet 99% uptime under the Public Charge Point Regulations 2023, while privately run chargers can be left with no one responsible for upkeep.
Why it matters
Ageing first and second wave chargers on private sites are a growing source of stranded assets and downtime risk, creating demand for independent, manufacturer agnostic maintenance contracts. Site owners and CPOs should check who holds long-term maintenance responsibility before warranties and installer contracts lapse.
Public EV charging could cost 33% more per mile than petrol, experts warn
A UK report headlined with this claim says experts warn public charging prices may soar next year. The supplied excerpt contained only web page code and no article text, so the underlying tariffs, the petrol price basis and the named experts cannot be confirmed. The page references suggest the piece comes from the Daily Mail website.
Why it matters
If public charging does end up costing more per mile than petrol, it could weaken the consumer case for switching and put pressure on CPO pricing and tariff transparency. Procurement teams should treat the 33% figure as unverified until the full article and its methodology are checked.
Opinion: Volta EV chief says the Government's £100m public charging fund may not ease fleet charging costs
In an opinion piece, Chris Chevalier-Moniz, CEO of charger supplier Volta EV, discusses the £100m announced in the Autumn Budget to reduce the cost of using lower-powered public EV chargers, with changes expected from spring 2027. The move is expected to save drivers around £150 a year, but he argues fleet operators face different challenges and should assess overall fleet requirements. He says depot charging could be more practical and cost-effective for vehicles that return to the same site each day, as it gives operators greater control.
Why it matters
The piece is a supplier's view, but it signals that fleet customers may look beyond public charging price cuts and weigh depot charging, which could shape demand for depot installations. CPOs and installers targeting fleets may need to pitch around vehicle parking patterns and return times rather than the cost of a single public plug-in.
MFG EV Power ranked second among UK large rapid charging networks in Zapmap 2026/27 awards
MFG EV Power was named an EV Driver Recommended network in Zapmap's 2026/27 awards, finishing second in the large rapid and ultra-rapid category for the second year running with an overall satisfaction rating of 4.2 out of 5. The survey drew a record 5,346 EV drivers in September and October, and the large category covers networks with more than 800 rapid and ultra-rapid chargers, where three networks scored 4 or more. MFG EV Power now operates more than 3,000 rapid and ultra-rapid chargers across 597 locations, having grown 16% over the past year.
Why it matters
Driver-rated reliability, ease of use and payment options are becoming visible differentiators among large UK networks, which can influence host site and landlord decisions. The staffed forecourt and supermarket model is cited as helping resolve faults quickly, a useful reference point for operators and bidders weighing site partnerships and service commitments.
Northumberland County Council approves 36 more EV charge points across 26 locations
Northumberland County Council's cabinet has agreed to add 36 EV charge points at 26 locations to its existing network, with the site list subject to final review once connection and installation costs are confirmed. A total of £1.038m from the City Region Sustainable Transport Settlement will fund the rollout until 2029, with revenue covering running, management and maintenance costs. Some 78% of installations will be on council owned land and 22% on third party land under licence, with the council's in-house EV Team installing and maintaining the chargers.
Why it matters
The council is delivering and maintaining the chargers in house rather than procuring a concession, so opportunities for external CPOs look limited here, although connection and hardware costs may still create supply demand. The value for money review of sites against confirmed connection costs shows how tightly public funded rollouts are being scrutinised.
Arnold Clark Charge named Best EV Charging Network in Zapmap's Medium Rapid and Ultra-rapid category
Arnold Clark Charge won Best EV Charging Network 2026/27 in the Medium Rapid and Ultra-rapid category at the Zapmap awards, with the highest overall satisfaction score of 4.4 out of 5. Zapmap's survey gathered feedback from 5,346 EV drivers in September and October 2026, rating networks on reliability, ease of use, customer support, value for money and payment experience. The network now operates 429 chargers across 63 UK sites and charges 55p/kWh.
Why it matters
A driver-rated win for a mid-sized operator shows that reliability, helpful support and convenient locations can outweigh sheer network scale in satisfaction scores. For CPOs and site hosts, it is a benchmark for service quality and pricing, with 55p/kWh now a reference point for competitive public rapid charging.
Ayvens and Fellten partner to supply containerised EV chargers for company car fleet hubs
Fleet company Ayvens and EV tech firm Fellten will offer Fellten Charge Qubes to fleet customers where sites lack the power to meet charging demand, aiming to bypass grid upgrade queues. Each unit combines AC or DC charging with a battery of up to 1MWh, needs no groundwork, plugs into a three phase supply and can be deployed within two hours if a connection is already available. Ayvens will use fleet telematics data where available to identify charging "pinch points", and cited a government release claiming grid demand rose by 460% in the first half of 2025, with projects taking up to 15 years.
Why it matters
Battery buffered units that draw lower peak power than a standard DC charger give fleets and CPOs a route to deploy where grid upgrades are stalled, and the units can be relocated if needed. The telematics led site selection also points to a model where charging demand data drives where capacity is procured.
Ayvens and Fellten partner to supply containerised EV chargers for company car fleet hubs
Fleet company Ayvens and EV technology firm Fellten will offer Fellten Charge Qubes to fleets where site power is inadequate, aiming to bypass grid upgrade queues. Each unit combines AC or DC charging with a battery of up to 1MWh, needs no groundwork and plugs into a three-phase supply, so it can be deployed within two hours if a connection is already available. The report cites a government release saying grid demand rose by 460% in the first half of 2025, with projects taking up to 15 years, and notes public charging can cost 13 times the cheapest home energy rates.
Why it matters
Battery buffered units that draw lower peak power than a standard DC charger offer a route to energisation where grid connections are the bottleneck, and they can be relocated if needed. Ayvens plans to use fleet telematics data to find charging pinch points, which could shape where such hubs are specified and funded.
Connected Kerb appointed on 20-year contract to deliver 1,562 public chargepoints in Cheshire West and Chester
Cheshire West and Chester Council has appointed Connected Kerb as its delivery partner on a 20-year contract to install 1,562 public EV chargepoints across the borough by December 2030, with installation expected to begin in early 2027. The programme combines £2.049 million of Government LEVI funding with around £8 million of private investment from Connected Kerb. Most chargers will be in council-owned car parks, with on-street charging where residents live more than 400 metres from one.
Why it matters
This is a further example of the LEVI model leveraging a small amount of public funding, here roughly one pound for every four of private capital, into a large, long-term concession, and it shows a car park first approach with a 400 metre on-street fallback. Overnight public charging rates on all new installations are also a stated feature of the scheme, which CPOs and bidders should note when pricing similar tenders.
Motorway service stations building their own roadside solar farms to power EV charging because they cannot connect to the grid
A report headlined as above says motorway service stations in the United Kingdom are building solar farms beside the road to supply electric car charging, because they cannot get a grid connection. The text supplied contained only page code and advertising data, so no figures, site names or operators can be confirmed. The page scripts suggest the piece was published by MailOnline.
Why it matters
If accurate, grid connection delays are pushing motorway charging hosts towards self generation, which affects how projects are scoped, financed and programmed. Buyers and CPOs should check connection timelines and onsite generation assumptions in any motorway site bid, and verify the details against the original article.
UK Government removes red tape for cross-pavement EV charging solutions such as pavement gullies
Labour's decision to cut red tape for cross-pavement charging, including pavement gullies that run a cable under the footpath to a vehicle parked outside a home, is described as removing barriers to EV ownership. The article says drivers without off-street parking pay 20% VAT at public chargers, putting costs close to 50p per kWh, against 0% VAT and about 7p per kWh for home charging. Motorpoint's EV expert Mike Vousden called the move a game-changer, in coverage of the rule change for UK motorists.
Why it matters
Cross-pavement charging could draw on-street drivers toward cheaper home tariffs, which may reduce reliance on public charging for residential top-ups. CPOs and local authority procurers working on kerbside provision should watch how this shifts demand and the case for on-street chargepoints.
UK opens second £38 million Depot Charging Scheme round with grant rate cut to 60%
The UK government has launched a second funding window for its Depot Charging Scheme, worth £38 million and aimed at fleet electrification. The grant rate has been reduced to 60%, and applications close on 26 February 2027. The details come from the announcement as reported in the news excerpt.
Why it matters
A lower grant rate means operators and CPOs bidding for depot projects must fund a larger share of capex themselves, which affects business cases and partner financing. The long window to 26 February 2027 gives time to prepare bids and line up co-investment.
Go Eve secures £750,000 to develop next version of DockChain fleet charging system
Go Eve, a University College Dublin and Imperial College London spin-off, has raised £750,000 from Innovate UK and private investors for an 18 month project on the next version of its patented DockChain distributed DC fast charging technology. DockChain lets a single power module serve multiple EVs in sequence, rather than fitting a separate DC charger at every bay, which can reduce the chargers and electrical infrastructure needed. The project covers custom hardware, firmware and software for better control of starting, stopping and restarting sessions, with existing units upgradeable and a production-ready version due for manufacturing partners in 2027, as reported on a Posted November 13, 2026 newswire item.
Why it matters
Distributed charging could cut charger counts and grid connection requirements at depots where vehicles share limited capacity, which directly affects fleet charging cost and speed of deployment. Go Eve is inviting fleet operators to discuss trial sites, and the planned upgrade path for existing units and the exploration of bidirectional charging and V2G are worth tracking for future procurement.
East Sussex County Council plans concession contract for an electric vehicle charge point network
East Sussex County Council has published a LEVI funded tender titled "Concession Contract for the Provision of an Electric Vehicle Charge Point Network for East Sussex". The listed value is £691,666,667, and the procurement is currently in the planning stage. It was first published on 13 Nov 2026.
Why it matters
A concession structure for a whole county network, with a listed value of this size, is one for CPOs and funders to watch closely. Because the procurement is still in planning, there may be time to prepare partnerships and bid positioning before formal documents appear.
Motorpoint poll finds home charger costs and complexity are deterring UK drivers from switching to electric
A Motorpoint survey of 2,000 UK drivers suggests nearly 5.8 million motorists could be delaying an EV purchase because of the cost of fitting a home charger, which the report puts at £800 to £1,200. Among non-EV drivers, 23% said they would be more inclined to go electric if installing a home charger was simpler, 22% said they would be more likely to switch if their property already had one, and 26% said installation cost discouraged them, even with the Electric Vehicle Chargepoint Grant offering up to £500 for qualifying homes without a driveway. The coverage frames recent UK Government regulatory changes as aimed at making home charging more straightforward.
Why it matters
Home charger cost and installation hassle remain a stated barrier to EV uptake, which keeps demand open for installers, bundled offers and lower cost install models. The £500 grant for homes without a driveway has not removed cost concerns for a sizeable share of drivers, so it is worth watching how the rule changes affect on-street and residential charging propositions.
SDLP councillor Martin Reilly calls for stronger rapid EV charging network in Derry
SDLP Waterside Councillor Martin Reilly has called for urgent action to improve Derry's electric vehicle charging network. He warns that the lack of reliable rapid charging points is letting down local drivers and visitors to the city. The call was reported in a local news piece, and the excerpt gives no figures on current site numbers or planned investment.
Why it matters
Local political pressure on rapid charging provision in Derry points to unmet demand that CPOs and funders could target, particularly where reliability is the complaint. With no sites, funding or timelines stated, it is a signal to monitor rather than a confirmed opportunity.
Greenwheel Electric submits plans for solar powered 16 bay EV charging hub at Hunterston PARC in North Ayrshire
Greenwheel Electric has submitted applications to North Ayrshire Council for an EV charging hub at the Hunterston PARC (Port And Resource Campus) site. The proposal covers 16 charging bays offering low-cost, ultra-rapid charging, plus a small solar power plant to supply the hub. The filing follows a period of community engagement, and the company says it will extend its 'Plug-in local' charter on local supply chains at the site after launching it at its Dumbarton location.
Why it matters
A new entrant pairing ultra-rapid charging with on-site solar at a port and industrial campus shows how developers are using co-located generation to shape their site proposals. The 'Plug-in local' charter signals a local supply chain commitment that contractors and equipment suppliers in the area may want to track.
Reverse the Charge assessment projects UK rapid charging could reach £1.03 per kWh by 2027 as standing charges climb
The Reverse the Charge impact assessment, published jointly by charging firm Zest and The Fast Charge newsletter, says average operator standing charges have risen from £61.47 per week in 2021 to £440.13 in 2026, and are due to reach £541.73 in 2027. Under the Ofgem Targeted Charging Review, operators pay daily standing charges based on each chargepoint's maximum capacity rather than actual usage. ZapMap puts the average rapid charger price at 79p per kWh, but the assessment suggests a rapid charger dispensing only 3,000kWh per month could need to charge £1.03 per kWh by 2027.
Why it matters
Capacity based standing charges put the heaviest pressure on lightly used rapid sites, leaving operators to choose between running at a loss and raising prices. Anyone planning, funding or tendering for sites should test business cases against low utilisation and the cost of the connection capacity they specify.
Tesla, Arnold Clark Charge and Connected Kerb win top honours in Zapmap's ninth annual EV charging awards
Zapmap has announced the winners of its ninth annual EV charging awards, with Tesla taking Large Rapid and Ultra-rapid for the third year running, Arnold Clark Charge leading Medium Rapid and Ultra-rapid, and Connected Kerb retaining Destination and On-street in the 2026/27 titles. The rankings draw on responses from a record 5,346 EV drivers, up 34% on last year, and assess reliability, ease of use, customer support, payment and value for money. Large networks have over 800 chargers, medium networks have 250 to 800, and destination and on-street entrants need at least 2,000 predominantly standard or standard plus chargers; a record 27 networks met the threshold with sufficient responses and a positive rating.
Why it matters
Driver-rated rankings on reliability, payment and value shape which networks are seen as the benchmark, which matters when assessing competitors, partners or site hosts. The record response base and the number of qualifying networks suggest a more closely watched UK market where service quality is increasingly visible.
Tesla (global) · Arnold Clark (uk) · Connected Kerb (uk) · Zapmap (uk) · Source
Char.gy says charging investment must build confidence among future EV drivers as well as serve current demand
Christina Georgiou, Head of Product at char.gy, told the Transport + Energy Forum in Warwick that infrastructure planning should consider people who have yet to buy an EV, particularly those without a driveway, alongside today's demand. She said char.gy's in-house data team uses modelling to balance serving existing drivers with installing in areas where future demand could develop. The operator has around 6,000 charge points and has spent about a decade designing, manufacturing and operating its own hardware, management system and driver apps, with lamppost charging used to extend coverage and make investment go further.
Why it matters
It signals that some operators are siting on-street charging ahead of proven demand, which may shape how local authorities and CPOs frame site selection and utilisation expectations in tenders. Buyers may want to ask bidders how their demand modelling accounts for future drivers as well as current usage.
Rapid EV charging could reach £1/kWh in 2027 as fixed costs rise, report warns
WhichEV reports that a new report warns UK rapid charging prices could reach £1 per kWh in 2027. Rising fixed costs are named as the cause. The text available gives no detail on who produced the report, today's price baseline or which costs are driving the increase.
Why it matters
If fixed costs are pushing rapid charging prices towards £1/kWh, CPOs and funders should stress test tariff and margin assumptions in business cases and bids. Buyers should check the full report for the cost breakdown before relying on the figure.
UK driver restores a 100 mile commute overnight for about £6 using a three pin granny charger
As reported by The Cool Down, UK content creator Alex Carter tested a dé charger with his 2026 Tesla Model 3 Long Range Rear Wheel Drive. He plugged in just after 6pm and the battery reached 74% by just after 6am, having been at 43% on his return from 70% in the morning. He reported adding 26 kWh over slightly more than 12 hours at roughly 2.3 kW (230 volts at 10 amps) for about £6, without a special EV tariff. The charger was supplied free for the test, and Carter had previously relied only on Superchargers.
Why it matters
This is a single self reported test with a manufacturer supplied charger, but it suggests slow overnight charging at around 2.3 kW can cover a typical daily commute for drivers with access to a socket. For CPOs and procurement teams, it is a reminder that low power options compete with public charging for routine, predictable mileage.
AA UK EV Readiness Index rises from 47.5 to 60 out of 100 in little over a year
The AA says Britain's shift to electric vehicles has reached a "turning point", citing cheaper cars, better charging access and an improved ownership experience. Its latest data shows just 1.2% of EV breakdowns are now due to running out of charge, compared with 8.3% in 2015, and in 40% of those cases the driver could reach a charger followed by the AA patrol. The AA also reports that 87.5% of EV breakdowns are repaired at the roadside, against 84.6% for petrol or diesel vehicles, with 99% of patrols trained to Level 2 Electric Vehicle Prepared standard.
Why it matters
Falling range anxiety related breakdowns and a higher index score point to growing driver confidence in the charging network, which supports the demand case behind new site investment and tenders. CPOs and funders can use the figures as evidence that access and reliability improvements are shifting consumer behaviour, although the excerpt does not break down the index by charging infrastructure alone.
AA's UK EV Readiness Index rises from 47.5 to 60 out of 100 in little over a year
The AA says Britain's shift to electric vehicles has reached a turning point, driven by cheaper cars, better charging access and an improved ownership experience. Its latest data shows only 1.2% of EV breakdowns are now caused by running out of charge, down from 8.3% in 2015, and 87.5% of EV breakdowns are fixed at the roadside, against 84.6% for petrol or diesel vehicles. In 40% of 'out of charge' cases the driver could drive to a charger behind the AA patrol, with average recovery of 4.3 miles.
Why it matters
Falling range-related breakdowns and a higher readiness score point to growing driver confidence in public charging, which supports the demand case behind site and network investment. Procurement teams can also read the figures as evidence that reliability and availability are improving the ownership experience that drives utilisation.
Second window of UK Depot Charging Scheme opens with £38 million of funding
The second application window of the Government's Depot Charging Scheme opened at midday on 11 November 2026, after a two-week delay, and closes at midday on 26 February 2027. It offers £38 million toward charge point and civil engineering costs at fleet depots, with funding of up to 60%, down from 70% in the first round, and a cap of £1 million per organisation across all sites. Applications are assessed first come, first served unless demand exceeds funding, in which case a competitive process may be used, and projects must be completed by 31 March 2028.
Why it matters
The lower intervention rate means fleets must carry a larger share of project costs, which may affect business cases and the pace of depot orders. The one application per organisation limit and the 31 March 2028 completion deadline put a premium on early, well-scoped bids and deliverable programmes from installers and CPOs.
Cheshire West and Chester awards Connected Kerb a 20-year LEVI contract for 1,562 public chargepoints
Cheshire West and Chester Council has appointed Connected Kerb as delivery partner for the Local Electric Vehicle Infrastructure (LEVI) scheme, covering 1,562 new public chargepoints across the borough. Installation is expected to begin in early 2027, with the full rollout due by December 2030, mostly in Council-owned car parks and with on-street charging where residents live more than 400 metres from one. Government LEVI funding of £2.049 million has attracted around £8 million of private investment from Connected Kerb, with overnight public charging rates promised on all new installations.
Why it matters
The model leans heavily on private capital, with roughly £8 million of private investment alongside £2.049 million of LEVI funding, on a long 20-year concession. The 400 metre car park threshold for on-street provision and the commitment to competitive overnight rates are useful reference points for CPOs and suppliers shaping bids elsewhere.
SNP promotes Scotland's EV charger density while report says 2030 target of 24,000 points is at risk
A UK press report says SNP MP Calum Kerr urged the UK Government to match Scotland's ambition, citing 235 EV chargers per 100,000 people in Scotland against a UK average of 180. The same report notes that the Scottish Government has pledged to support about 24,000 additional public charge points by 2030, while ZapMap currently lists 12,956 across the country. It says roughly 4,000 would need to be installed each year to meet the promise, which means doubling the current count within about three years.
Why it matters
Scotland leads the UK on chargers per head, but the report points to a large gap between the current base and the 2030 target. If the government has to accelerate, that could mean more demand for public charge point procurement and funding, though the pace is not yet confirmed.
SNP highlights Scotland's EV charger density while 2030 target of 24,000 additional points looks at risk
SNP backbencher Calum Kerr said Scotland has 235 EV chargers per 100,000 people, against a UK average of 180, and urged the UK to match Scotland's ambition. The article, which takes a critical tone towards the SNP, notes that ZapMap lists 12,956 chargers in Scotland and that a 2024 pledge of about 24,000 additional public points by 2030 would need roughly 4,000 installed each year, effectively doubling the current base within three years.
Why it matters
Scotland leads the UK on chargers per head, but the gap between current installed numbers and the 2030 pledge points to a large potential pipeline if delivery is to accelerate. Procurement teams and CPOs should watch whether Transport Scotland funding and tender activity step up to the pace the target implies.
RAW Charging offers two days of free charging at Chesterfield hub
RAW Charging is giving drivers free EV charging, plus a free hot drink from Costa, at its Ravenside Retail Park hub in Chesterfield on 11th and 12th November. The hub has 16 ultra-rapid bays with speeds of up to 150kW and opened in March as part of RAW Charging's partnership with Landsec. Drivers claim the offer by signing up to RAW Rewards, according to the company's announcement.
Why it matters
The promotion shows a CPO using free sessions and a retail partner perk to build usage and loyalty sign-ups at a newly opened landlord-partnered site. For procurement teams, it is a reminder that host partnerships such as the Landsec arrangement can shape both site rollout and utilisation tactics.
Source opens first EV charging hub at Lidl supermarket in Birstall, West Yorkshire
Source, the ultra-rapid charging joint venture between SSE and TotalEnergies, has opened its first hub at a new Lidl store in Birstall, West Yorkshire, two minutes from junction 27 of the M62. The site has 12 bays with speeds of up to 320kW, and ten of the bays are sized for vans and LCVs, alongside an accessible bay. Another Source hub at a Lidl site is planned in the South West, as Source works towards 300 ultra-rapid hubs across Britain by 2030.
Why it matters
Pairing a retail host with van-sized bays close to a major motorway junction shows a site model aimed at LCV and fleet demand as well as car drivers. For CPOs and landlords, the planned second Lidl site suggests the retailer partnership could be repeated, which matters for anyone competing for supermarket host sites.
Believ takes over Brighton and Hove public EV charging network from Blink Charging
Believ has taken over operation of more than 110 public EV chargers across over 30 locations in Brighton and Hove, replacing Blink Charging, and is working with the council to add 210 more rapid and ultra rapid chargers by the end of 2028. Believ will keep existing Standard and Standard Plus equipment where possible and upgrade rapid sites to improve reliability and meet public charging regulations, with that rapid work due by the end of November 2026. The report, posted by Mike Lightfoot on 11 November 2026, notes that 54 per cent of the city's residents lack private charging access.
Why it matters
The handover shows councils are willing to switch operators on existing networks, and an incumbent CPO can lose an estate on reliability and regulatory compliance grounds. The 210 charger rapid and ultra rapid expansion to 2028 also points to continuing hardware and installation demand in the city.
Specialist warns hundreds of thousands of UK private EV chargers have not been inspected since installation
Maintenance specialist Safer Charging says hundreds of thousands of private EV chargers at UK workplaces, depots, apartment blocks and public sector sites have not been inspected since they were installed. Public rapid networks must stay operational 99% of the time under the Public Charge Point Regulations 2023, but private chargers face no equivalent rules and upkeep is often one task among many for staff without charging expertise. Safer Charging also flags fire preparedness as a growing blind spot, citing toxic gases and contaminated firewater run-off, and says insurers increasingly expect specialist documentation.
Why it matters
Unmaintained private chargers can push drivers and fleets onto costly public rapid charging and leave site owners exposed on compliance and liability. For CPOs and maintenance suppliers, the gap points to demand for inspection, servicing and fire risk assessment contracts on private estates, though the claim comes from a company that sells those services.
Openreach and Allstar expand home, public and shared depot charging for 7,000 electric vans
Openreach has partnered with EV payment specialist Allstar to widen charging access for its 7,000-strong electric van fleet, where around one in three engineers cannot charge at home. Allstar Homecharge pays work-related home charging costs directly to drivers' energy suppliers, while public charging is being concentrated through fewer strategic charge point operators and Allstar Co-Pilot helps engineers find approved locations. The partnership is also developing commercial and shared depot access through partners including First Charge and Voltempo, offering larger bays, high-speed charging and bookable slots payable with existing cards such as Allstar Chargepass.
Why it matters
A large UK fleet is consolidating public charging onto fewer operators and seeking depot sites with larger bays and bookable high-speed charging, which signals what fleet buyers will favour in procurement. Operators serving commercial vehicles with card-based payment and booking have a clear route into this demand.
Electric Vehicles
Tusker survey finds EV salary sacrifice is a factor in job applications for 80% of employees
Tusker's Driver Survey Report 2026, based on more than 5,800 employees, found that 23% say a salary sacrifice car would significantly influence their decision to apply for another job and a further 57% say it would have some influence. This compares with 60% who said scheme access would influence their choice of employer in the 2025 research. Among current EV drivers, 61% say salary sacrifice was the main reason they chose an electric car, and Tusker reports a 350% year on year increase in Pre-loved EV orders.
Why it matters
Salary sacrifice is shaping EV uptake and employer recruitment and retention, which points to a growing base of company scheme drivers who need reliable charging at home, at work and on the road. Procurement teams and CPOs can use this as a demand signal when planning workplace and public charging provision in the UK.
Volvo confirms UK pricing for updated XC60 plug in hybrid from £58,965
Volvo has opened order books for its heavily revised XC60 PHEV, with prices starting from £58,965 across five trims: Core, Plus, Plus Pro, Ultra and Ultra Pro. The new 37.9kWh battery gives up to 124 miles of electric driving, almost double the 49.1 miles from the outgoing 14.8kWh pack. The entry price sits above the fully electric EX60, which starts from £56,860 and has a 378 mile range, according to the report.
Why it matters
A plug in hybrid with a battery more than double the size and a far longer electric range gives owners a stronger reason to charge regularly, which could add demand at home, workplace and destination sites. With the PHEV priced above the EX60, fleet and private buyers may also weigh up going fully electric, which strengthens the case for charging provision.
Lexus announces UK pricing for TZ six-seat electric SUV, from £74,895
Lexus has confirmed UK on-the-road pricing from £74,895 for the TZ, its first all-electric three-row SUV, with official sales opening in spring 2027. Every model has a 95.8kWh battery and Direct4 all-wheel drive, with powertrains producing 308hp or 402hp depending on grade, and an anticipated range of up to 330 miles. Lexus says 150kW DC rapid charging allows a 10% to 80% top-up in around 35 minutes, though final WLTP figures for each UK trim are yet to be confirmed.
Why it matters
A large, premium six-seat EV with a 150kW peak charging rate adds another high-capacity battery vehicle to UK roads from 2027, which is relevant for planning rapid charging bays and dwell time at premium and family-oriented sites. Final WLTP figures are still pending, so real-world charging demand is not yet fully defined.
Used electric van prices rise 11.3% to £9,812 in five months, Manheim reports
Manheim Auction Services reports that average used electric van selling prices rose 11.3% to £9,812 over the past five months, while overall wholesale LCV values fell 6.0% to £8,572. Electric van sales rose 78.9% year on year, buyer participation more than doubled and first-time conversion rose from 59.9% to 79.1%, with average mileage down 11.5% as younger vehicles enter the wholesale market. Across all vans, volumes rose 5.2%, guide price performance reached 99.1% and average days to sell fell to 11.1.
Why it matters
Firming residual values and faster resale of younger, lower mileage electric vans point to stronger fleet confidence in electrification, which supports the case for depot and destination charging demand. CPOs and fleet charging bidders can use the data to test assumptions about van fleet turnover and uptake in the UK.
Volkswagen ID Cross compact electric SUV driven, first VW EV with a frunk
The ID Cross is 100mm longer and 51mm taller than the ID Polo hatchback, which earned a 4.5 star road test verdict, and it targets the Renault 4 and the closely related Skoda Epiq. It rides on the Volkswagen Group's new MEB+ platform and is the first electric Volkswagen with a frunk, offering up to 25 litres of storage. The report also notes that Volkswagen has reintroduced physical buttons and toggle switches after criticism of its haptic sliders and touch-heavy interfaces.
Why it matters
Another small electric SUV from a major volume brand adds to the compact EV choice in the UK, which supports longer term demand for public and workplace charging. Operators and buyers planning sites should note that this segment is growing, so more drivers of smaller, lower cost EVs may rely on public charging.
London valeting firm Washello has cleaned more than 5,000 cars since 2016 using scooters and battery tools instead of vans and generators
Washello, a London mobile car valeting business, says it has cleaned more than 5,000 cars since 2016 without owning a van, with riders arriving by scooter and running every cleaning tool on batteries. It runs two scooters, an electric Super Soco CPx and a Honda Forza, and needs neither the customer's tap nor a plug socket. Founder James Allen says the first version used a 12-volt pressure washer and charged £5 a wash, and that building-site battery packs now have the capacity to run a pressure washer through a working day, with spares on charge.
Why it matters
The model shows a small commercial operator running on battery packs and spare packs on charge, rather than on a customer's supply or a fuelled generator, which points to demand for depot or home charging of portable packs rather than kerbside points. For CPOs and procurement teams, it is a reminder that some on-street urban workloads need no public charger at all.
Early drive of electric Porsche 718 Boxster prototype impresses ahead of full launch
A road tester spent an hour as a passenger on Mallorcan hills with Porsche's head of vehicle dynamics, then drove six laps of a racetrack in a late-stage prototype, calling it the most fun EV he has driven. The piece notes Porsche delayed the project because of battery supplier troubles and doubts over demand for an electric sports car, and has since cancelled the briefly mooted flat-six version. The report adds that Porsche is staging a phased media programme, with finished car drives hoped for by the summer, and that a rival electric BMW M3 was recently praised in the same publication.
Why it matters
Another performance EV heading to market points to continued demand for high-power charging among enthusiast and premium drivers, though this is an early, limited verdict with no charging figures given. Procurement teams should treat it as a market signal rather than a specification for planning.
Chinese brands feature in 48% of UK salary sacrifice EV quotes, while established carmakers lead Autotrader retail EV enquiries
An analysis of 500 salary sacrifice quotes by leasing provider Sogo Mobility found that 48% featured vehicles from Chinese new-entrant brands, with BYD described as a dominant force thanks to its expanding range, competitive pricing and manufacturer-backed offers. The figures point to a divide in the UK market, as established carmakers continue to dominate private retail EV enquiries on Autotrader. Sogo Mobility chief executive Chris Joyce said Chinese manufacturers are bringing well-equipped, technology-rich cars at prices that compare favourably with many established brands.
Why it matters
Workplace salary sacrifice is steering a large share of new electric and plug-in hybrid drivers towards Chinese brands, which shapes the vehicle mix that charging operators and fleet-linked site hosts should plan for. The split with private retail demand suggests that employer-led and consumer-led EV adoption may produce different driver profiles and charging needs.
Autocar writer finds BMW iX3 cheaper and more pleasant than diesel on 2500 mile road trip to France and Italy
In an Autocar long-term test report, a writer drove the BMW iX3 on a 2500 mile trip to France and Italy with three people aboard. Despite travelling in the school holidays, they never had to queue for a charger, with France offering plenty of choice and northern Italy having chargers that were always available because few electric cars use them. Most charging was slow overnight charging at or near hotels, and the writer notes that most continental chargers do not accept bank cards, only a phone app or an RFID card.
Why it matters
Overnight destination charging at hotels supported a stress-free long-distance trip, which points to continuing demand for slow charging at accommodation sites. The lack of bank card payment on most continental chargers remains a friction point for drivers, and a clear opening for operators who offer simple ad hoc payment.
Chery's iCAUR to launch in the UK in early 2027 with 40 dealers and the V27 range-extended SUV
iCAUR, a Chery subsidiary, plans a UK debut in early 2027, led by the V27, a five-seater range-extended electric SUV (REEV) with rugged, off-road inspired styling. The brand expects 40 dealerships to be ready to sell its models at launch, each offering sales and aftersales, backed by eight parts 'super hubs' across the country. Pricing and detailed specifications have not yet been announced, and it follows Jaecoo, Omoda and Chery itself into the UK, with the Jaecoo 7 now among the country's top three best-selling models.
Why it matters
Another Chery group brand entering the UK with a dealer network and a plug-in powertrain points to further growth in electrified vehicles on British roads, which feeds into long-term charging demand. Because the V27 is a range-extended model rather than a pure battery electric vehicle, procurement and CPO teams should treat it as a modest, uncertain driver of public charging use until charging specifications are published.
Mercedes-Benz GLA Electric reviewed as a taller, hatchback alternative to the CLA
The third generation Mercedes-Benz GLA sits on the same MMA platform as the CLA and GLB, and replaces both the combustion GLA and the electric EQA. It is primarily an EV, with hybrid options using a 1.5-litre four-cylinder petrol engine, an eight-speed dual-clutch gearbox and a small electric motor, offered with 134 bhp, 161 bhp or 182 bhp, the most powerful having four-wheel drive. The piece is a launch drive review of the electric version, which arrives first.
Why it matters
A single EV-led compact model replacing both the petrol GLA and the EQA points to a consolidated, powertrain-agnostic range from Mercedes-Benz, which could shape the mix of new plug-in vehicles drivers bring to charging sites. The shared MMA platform with the CLA and GLB suggests charging behaviour across these models may be broadly similar, which is useful when planning provision.
Used EVs sell in an average of 24 days in Britain, a week faster than the wider market, says Autotrader
Autotrader data for November so far shows used EVs selling in an average of 24 days, a full week sooner than the wider market. Electrified vehicles take nine of the top 10 fastest-selling spots, with the Renault Clio the only pure petrol model listed. The Hyundai Kona leads at 17 days for three to five year old examples against a market average of 31 days, while diesel is slowest at an average of 36 days.
Why it matters
Strong secondhand demand, driven by high fuel costs, points to a growing base of EV drivers who will need public charging. Dealers also report shortages of five to seven year old stock, which could shape how quickly that driver base expands.
Second main contractor leaves Agratas £5.2bn battery gigafactory in Somerset within five months
Construction firm TSL, formally Tonroe Group, is set to leave the Agratas gigafactory project in Bridgwater, Somerset, according to The Guardian, the second lead contractor to exit in five months. Three sources said TSL could not agree terms with Agratas, and two pointed to disagreements over timescale and cost. The UK government has pledged £380m of support for the project, not all of which has been paid, and no replacement lead contractor has been named, with NG Bailey, already working on site, cited as one option.
Why it matters
Repeated contractor turnover on a flagship Tata Group site signals delivery and cost risk for large UK battery supply chain projects, which matters to anyone planning EV supply or infrastructure around domestic cell output. Suppliers and contractors eyeing the vacant lead role should weigh the reported disputes over programme and price before bidding.</br>
Dutch court bans EU sales of BYD Ti7 over Land Rover Defender design claim, UK launch unaffected
A district court in The Hague, ruling in summary proceedings, found that the BYD Ti7 infringes Jaguar Land Rover's EU design and ordered an immediate ban on sales across the EU. BYD is also barred from building the Ti7 at its new Szeged plant in Hungary, due to come online at the end of 2026, until the intellectual property case is resolved. BYD says it strongly disagrees and will appeal, and the report says UK sales will go ahead as planned after order books opened online.
Why it matters
Any charging demand forecasts or fleet partnerships that assume Ti7 volumes in EU markets now carry legal risk, while the UK outlook is unchanged for now. The restriction on the Hungarian plant also adds uncertainty to BYD's European production plans, so it is worth watching the appeal.
UK fleet managers face demands to cut budgets by up to 30% as diesel reaches £2 per litre, says AFP
The Association of Fleet Professionals (AFP) says fleet managers are under "unusually common and stringent" pressure from senior leadership to cut spending by up to 30%, driven by rising petrol and diesel prices following the conflict in Iran. AFP chair Paul Hollick called the demands "often simply unviable" because fleets budget around vehicle cycles measured in several years, and noted diesel has hit £2 per litre. Some fleets have responded by removing models from choice lists, reducing company car eligibility or limiting mileage.
Why it matters
Electrified company car fleets have been largely insulated from the fuel price squeeze, which strengthens the cost case for charging infrastructure among operators still reliant on ICE vehicles, especially diesel vans. CPOs and suppliers targeting fleet customers may find budget holders more receptive to total cost arguments, though short term cuts could also delay procurement decisions.
BYD targets TCO below diesel within three years for new C12 DUO electric coach in the UK
BYD UK Commercial Vehicles Managing Director Frank Thorpe told Sustainable Bus at Euro Bus Expo 2026 in Birmingham that the C12 DUO is aimed at a total cost of ownership below a comparable diesel coach within three years of operation, based on 50,000 to 55,000 miles a year. BYD has secured 12 orders, with deliveries scheduled for April 2027, and sees school transport, contract services and defined-range private hire as the first target applications. Thorpe also discussed BYD's vertically integrated production, the absence of short-term plans for UK manufacturing, the effects of franchising on investment decisions, and work on financing solutions for operators.
Why it matters
Coach electrification with high annual mileage and defined-range duty cycles points to depot-based charging demand, and CPOs and installers serving operators in school, contract and private hire work should watch how these 12 deliveries are planned. The TCO claim is a manufacturer target rather than a proven result, so procurement teams should test it against their own duty cycles and energy costs.
Nissan continues £2bn Sunderland investment as electric vehicle production expands
Nissan's £2 billion investment in its Sunderland operation, announced in November 2023 under the EV36Zero project, is continuing to reshape UK automotive manufacturing. In December 2025 the plant began building the third-generation LEAF following a £450 million investment, including 78 additional robots in the body shop and 475 automated guided vehicles, while a nearby AESC battery gigafactory supplies batteries. The wider programme was expected to support around 7,000 Nissan employees and approximately 30,000 supply chain jobs in the UK.
Why it matters
Growing UK production of electric Qashqai, Juke and LEAF models points to a larger domestic base of new EVs reaching UK drivers, which supports long term charging demand. For CPOs and procurement teams, the integration of vehicle, battery and renewable energy infrastructure at one North East site is a signal of how UK EV supply chains are being built locally.
Renault Twingo qualifies for full £3,500 Electric Car Grant in the UK, priced from £14,745
The new Renault Twingo has received the full £3,500 Electric Car Grant, with prices starting at £14,745, making it one of the most affordable EVs on UK roads. The car offers around 163 miles of range across three trim levels, and was the best-selling EV in France last month, with UK deliveries expected to begin in March 2027. Renault UK's Managing Director, who appeared on a panel at the Transport + Energy Forum, said volatile petrol and diesel prices were "a pattern now, not a blip" and that drivers "doing the maths" were being drawn to EVs.
Why it matters
A fully grant-eligible EV from £14,745 points to a wider pool of lower-income and first-time EV buyers, which could add to home and public charging demand from drivers with limited off-street parking. Fleet and charge point operators may want to factor this smaller, affordable segment into future demand and site planning.
London Fire Brigade completes year-long trial of electric-hybrid fire engine and moves it into frontline service
The Zero Emission Pumping Appliance (ZEPA01), developed by London Fire Brigade with Emergency One and Babcock Critical Services, has finished a year-long operational trial and is now fully integrated into frontline service. Based at Hammersmith Fire Station since October 2025, it attended over 1,500 incidents, including 141 fires, 393 special service calls and a 25-pump warehouse fire in Brent, completing every attendance on battery power alone. It has a range of more than 200 miles, can pump water continuously for up to four hours, and is estimated to have saved almost 17 tonnes of carbon dioxide compared with a standard diesel fire engine.
Why it matters
A successful trial in one of the most demanding emergency response roles strengthens the case for electrifying blue light fleets, which could create new demand for depot and station charging infrastructure. CPOs and installers should note that resilient, high availability charging at fire stations is likely to become a requirement if the technology is adopted more widely.
Genesis outlines its UK fleet offer as salary sacrifice opens premium electric cars to more company car drivers
In a feature on fleet electrification, Genesis' Head of Fleet Tim White says fleet decisionmakers want reliable OEM suppliers with practical products, good battery range and fast charging for minimal driver downtime. Genesis, the luxury brand of Hyundai Motor Group, offers UK business users three fully electric models: the GV60, Electrified GV70 and Electrified G80. The piece says the rise of salary sacrifice is weakening the grade-based allowances and price caps that once kept luxury brands to senior staff, and the excerpt notes that What Car? has teamed up with Genesis on the story.
Why it matters
Salary sacrifice is widening the pool of drivers who can access premium electric cars, which could add to demand for dependable fast charging, both on the road and at the workplace. For CPOs and procurement teams, fleet buyers' emphasis on minimal driver downtime points to charging reliability and speed as selection criteria.
Research finds SMEs face £150,000 cost gap between private and public charging for electric vans
A Centre for Economics and Business Research (Cebr) study, commissioned by the Open Road Partnership of United Rental Group, Zenith, Enterprise Mobility and Vertu Motors, models a 10-van construction firm. With private charging it could save £42,000 over five years against diesel, while relying on public chargers would leave it £110,000 worse off once lost working hours are counted, a gap of up to £150,000. The research also puts first-year extra costs for a medium-sized business switching 10 vans at £15,500, and lost productive output from public charging at more than £23,800 a year. It was published ahead of an imminent government decision on ZEV mandate targets.
Why it matters
The findings show that for small fleets the economics of electrification hinge on access to private charging, which strengthens the case for depot and workplace charging offers and for public charging that cuts time lost. The timing ahead of the ZEV mandate decision suggests the research will feed into policy debate on support for SME fleet charging.
Kia PV5 Passenger reviewed on UK roads as a lower cost rival to the VW ID. Buzz
A UK road test of Kia's all-electric PV5 Passenger, the people-carrying sibling of the PV5 Cargo and Kia's first commercial vehicle, judges it a clear winner on construction, space, practicality, efficiency and value, though it lacks the premium polish of the VW ID. Buzz. Prices start from under £35,000, with a seven-seat option on the way and a long-range powertrain as standard, positioning it between smaller van-based MPVs such as the Citroen e-Berlingo and larger models such as the Ford E-Tourneo Custom.
Why it matters
A lower priced, long-range van-based people carrier aimed at large families, hotels and airport shuttle operators points to a new source of fleet and business charging demand. Site hosts and CPOs serving shuttle and passenger transport operators should expect more of these vehicles on their networks.
Octopus Energy survey finds 93% of UK EV drivers spend less since going electric
A nationwide survey of more than 1,500 motorists by Octopus Energy found that 93% of drivers spend less since switching to an EV, and 58% save at least £100 a month on fuel. 21% save upwards of £200 a month, equal to £2,400 a year, while 33% say they can fully charge for under £4 and 59% pay £6 or less. Charlotte Snelgrove, product and marketing director at Octopus Energy, said nine in ten drivers are saving money.
Why it matters
Running cost savings are the core consumer case for charging demand, and the reported charge costs show the price levels drivers now expect. CPOs and procurers should weigh tariff and pricing strategy against the low per charge costs these drivers report, which are likely driven largely by home charging.
Renault prices Twingo E-Tech electric from £14,745 and confirms full £3,750 Electric Car Grant
Renault has priced the Twingo E-Tech electric from £14,745, and the car has secured the full £3,750 Electric Car Grant (ECG). It uses a 27.5kWh battery for a range of up to 163 miles, with an 82PS electric motor, and orders open in Q1 2027. Three trims are offered in the UK, with the entry-level evolution charging at 11kW on AC and 50kW on DC, while the £16,245 techno adds 18-inch alloy wheels, Google built-in and a reversing camera.
Why it matters
A small, low-priced EV with full ECG eligibility points to new entry-level drivers arriving from 2027, many of whom may rely on public charging. With DC charging capped at 50kW and a 27.5kWh battery, demand may favour reliable, well-located and competitively priced charging rather than ultra-rapid capacity.
SONGZ says its HVAC systems serve over 950 London electric double deckers and are ready for TfL 2.7
An article describes SONGZ as the supplier of air conditioning for more than 950 zero emission double deckers running daily in London, vehicles that meet Transport for London standards 2.2 and 2.5. SONGZ HVAC compliant with the upcoming TfL 2.7 standard is said to be entering delivery. The SONGZ LMD-VI series received Volvo compatibility certification for 10 to 12m electric bus chassis in May 2026, and its double decker unit passed compatibility testing at Volvo's headquarters laboratory at the end of September 2026, with formal certification expected in the coming months.
Why it matters
Volvo certification is said to cut customer development time by several months, which could shorten electric bus delivery timelines and so the pace at which depot charging is needed. The claims come from supplier-led coverage, so operators and CPOs planning London fleet transitions should confirm TfL 2.7 compliance and delivery schedules directly.
M&H Carriers deploys 18 Mercedes-Benz eSprinter vans, taking its electric fleet to 29
Scottish distribution firm M&H Carriers, which runs around 325 vehicles, has added 18 Mercedes-Benz eSprinters and now operates 29 EVs, according to a 19 November 2026 report by Charles Morris. The company installed 17 charging points at its Inverness depot in 2021 and has since added charging infrastructure in Aberdeen and Perth. About 47 vehicles are due for replacement next year, and further EV purchases are under consideration.
Why it matters
A fleet that previously limited electric vans to local runs is now extending electrification as vehicle range improves, which points to growing depot charging demand across northern Scotland. With 47 replacements due next year, M&H may need further depot charging capacity, an opportunity for CPOs and installers serving regional fleets.
Horsham District Council awards £346,825 electric waste vehicle contract to Saga Truck & Van Ltd
Horsham District Council has awarded a contract to Saga Truck & Van Ltd for its Electric Waste Vehicle requirement. The award is valued at £346,825 and is dated 11 Nov 2026, according to the procurement notice. The excerpt does not state the number of vehicles or whether charging equipment is included.
Why it matters
Council moves to electric refuse fleets can create depot charging demand, so awards like this are an early signal for CPOs and installers. Check the full notice for any charging or infrastructure scope, as the summary does not confirm it.
Xpeng UK targets number one premium EV position by 2028 and plans 100 locations by end of 2027
Xpeng UK managing director Claes Persson told EV Powered the brand aims to be Britain's top premium EV maker in 2028, without relying on discounts. The relaunch adds the G9L flagship SUV from £64,990 and the L03 coupe SUV from £32,990, each offered as a pure EV or range extender, joining the G6 and X9, with the L05 to follow. Xpeng has 22 locations today, will work with 20 retail and leasing partners, plans three flagship stores in London and Manchester within six months, and a national parts hub able to supply stores in as little as 24 hours.
Why it matters
A Chinese brand scaling from 22 to 100 UK locations by the end of 2027 will add a sizeable base of new EV drivers and dealer sites that need charging. CPOs and fleet and leasing buyers should watch the retail and leasing partnerships and the range extender option, which changes charging demand patterns.
XPENG G9L review: £64,990 Chinese electric SUV tested in Portugal against the Volvo EX90 and Kia EV9
XPENG is adding the G9L, a large luxury SUV in six and seven seat layouts, to its European line-up alongside the L03 coupe-SUV. It starts at £64,990 in the UK and around €75,000 elsewhere in Europe, making it one of the most expensive Chinese EVs on sale and close on price to the Volvo EX90 and Kia EV9. The tested G9L Performance Ultra offers 585 horsepower, all-wheel drive and a 343-mile WLTP range, while a range-extender version at no extra cost claims a combined range of 717 miles with a smaller battery.
Why it matters
Another Chinese brand is moving into the premium large SUV segment, which points to more high-end EVs with big batteries arriving on European roads. CPOs and site planners should note that the range-extender option, which uses a smaller battery, may shape how often and how fast these drivers need to charge in public networks.
Lepas prices all-electric L6 SUV from £34,995 in the UK, with deliveries due in early 2027
Chery-owned Lepas has announced UK pricing for the L6 EV, its first all-electric model, starting at £34,995 on the road with up to 279 miles of WLTP range. It comes in Essence and Elevate trims, the latter costing £2,000 more at £36,995, and both use a 65kWh LFP battery with a 217hp front motor and 120kW DC charging, taking the battery from 30% to 80% in around 22 minutes. The car is positioned against the Škoda Elroq and Kia EV3 and is central to the brand's fleet plans, according to the report.
Why it matters
A new Chery-group brand targeting fleets with a mid-size EV at a transparent price adds to the volume of company car drivers who will depend on public and depot charging from 2027. The 120kW peak DC rate and 22 minute 30% to 80% time give CPOs a clear benchmark for the charger power and dwell times this vehicle will expect.
Heavy Haul Rail moves its EV salary sacrifice scheme to Sogo Mobility for around 1,000 eligible staff
Birmingham-based rail freight operator Heavy Haul Rail has switched its employee electric vehicle salary sacrifice scheme to Sogo Mobility, rolling out the Sogo One service to around 1,000 eligible staff. The scheme went live on 1 September after the company moved away from its previous supplier, citing faster turnaround and flexibility. Sogo said it took the programme from initial discussions to launch within weeks, with minimal changes to standard systems and paperwork.
Why it matters
Employee EV schemes are a growing driver of home and workplace charging demand, and employers are willing to change suppliers over speed and ease of onboarding. For CPOs and installers, fleet and benefits providers like Sogo are a route to reach employee drivers in the UK.
Volkswagen launches ID. Buzz Beach camper variant in the UK from £53,995
Volkswagen is bringing the ID. Buzz Beach to the UK, priced from £53,995 and open to order later this month in five, six or seven seat versions. It adds a removable bed frame with a 2m x 1.2m folding mattress, camping chairs and a table, plus an overnight software mode that keeps climate control running for up to 48 hours while parked. The report also says it uses the updated Buzz's vehicle to load function, with a 230 volt socket adapter.
Why it matters
A factory built camper EV from a major brand could widen leisure driving demand, which may increase interest in charging at campsites, holiday parks and rural destinations. Overnight parked use and power export also point to longer dwell times and more varied energy use at sites that host these vehicles.
Research finds £150,000 cost gap for SMEs switching to electric vans depending on charging access
Research by the Centre for Economics and Business Research (Cebr), commissioned by the Open Road Partnership, found that a modelled construction firm running 10 vans could save about £42,000 over five years with private charging compared with diesel. Relying on public charging could leave the same business £110,000 worse off, including lost productive working time, a gap of around £150,000. The study also found a medium-sized business buying 10 new electric vans could face £15,500 of extra costs in the year of purchase, and public charging dependence could mean more than £23,800 of lost productive output annually.
Why it matters
The figures give a quantified case that private or depot charging is the deciding factor in whether electric vans pay back for small fleets, which supports demand for SME-focused install packages and financing. For CPOs, they also show that public charging time and access carry a real cost for van users, shaping what they will value in location, speed and reliability.
Volkswagen opens UK orders for ID Cross compact SUV with up to 265 miles of range
Order books are open for the Volkswagen ID Cross, which offers up to 265 miles of range, a 475-litre boot and a 1,200kg towing limit. Launch 52kWh 211hp models are priced from £30,260 in Life trim to £33,675 in Style, falling to £28,760 and £32,175 after the £1,500 government grant. Smaller 37kWh 135hp versions with a WLTP combined range of 194 miles follow in January 2027 from £26,985, with grant eligibility still to be confirmed.
Why it matters
A new mass-market electric SUV at sub £30,000 grant-adjusted pricing widens the pool of drivers moving to EVs, including those without home charging who will rely on public networks. The 194-mile and 265-mile range split points to differing charging patterns, which is worth factoring into site planning and demand forecasts.
Jaecoo E5 compact electric SUV priced from £30,440 with 248 miles official range
A fleet-focused review by Al Suttie of the battery-powered Jaecoo E5 gives a list price of £30,440, a 4% BiK rate, an official range of 248 miles and a tested range of 228 miles. The Luxury trim driven comes with synthetic leather upholstery, heated and ventilated front seats, a heated steering wheel and a cooled wireless phone charging pad. The review praises space and comfort for the class, but notes rear kneeroom limits the back seats to children.
Why it matters
A budget-priced compact electric SUV with a 4% BiK rate and real-world range of 228 miles is likely to appeal to UK fleet and business drivers, which could add to demand for workplace and public charging. CPOs and fleet buyers should note the growing choice of lower-cost electric models from newer brands.
Lord Mayor of London's 1973 Rolls-Royce Phantom VI limousine converted to electric by Electrogenic
Electrogenic has replaced the engine, transmission and fuel system of the City of London Corporation's official 1973 Phantom VI with a 120 kW (about 160 hp) electric motor producing 310 Nm of torque, powered by a 62 kWh lithium-ion battery under the bonnet. The car made its public debut at last month's Salon Privé weekend at Blenheim Palace, joining a growing set of classic Rolls-Royce models converted by the firm, including a 1929 Phantom II covered in 2023. The report, from a classic car conversion feature, says the range is more than enough for the Lord Mayor's appointments in and around the city.
Why it matters
A high profile civic vehicle going electric shows the retrofit and conversion niche gaining visibility in the UK. For CPOs and procurement teams, it is a small but notable signal of demand for charging access linked to ceremonial, heritage and low volume fleet use in central London.
Jaecoo adds Luxury+ PHEV flagship to Jaecoo 7 line up with first all wheel drive option and 7% BIK band
Jaecoo UK has launched a Luxury+ plug in hybrid flagship for its best selling Jaecoo 7 SUV, priced from £37,000 OTR for the front wheel drive version and £38,500 OTR for the all wheel drive version. A larger battery lifts electric range to 79 miles on the 204hp FWD model, 23 miles more than before with up to 769 miles total range, and 70 miles on the 354hp AWD model, which also produces 490Nm and covers 0 to 62mph in 5.9 seconds. Both versions clear the 70 mile threshold into the 7% Benefit in Kind band for 2026/27, down from 10% for existing models, and the AWD variant is the first all wheel drive model in Jaecoo's SHS P plug in hybrid range.
Why it matters
Lower BIK plug in hybrids with 70 to 79 miles of electric range are aimed squarely at company car drivers, which may add to demand for home and workplace AC charging rather than rapid public charging. CPOs and fleet charging suppliers should watch Chinese brand PHEV growth in the UK, as these drivers need regular plug in access to realise the tax benefit.
Volkswagen ID 3 Neo reviewed in the UK with up to 391 miles of range and 183kW charging
A UK review describes the ID 3 Neo as a comprehensive update to the Golf sized EV, built on a modified MEB+ platform that keeps a 400V electrical architecture. Three pairings are offered: 50kWh with 168bhp, 58kWh with 188bhp, and 79kWh with 228bhp. Life trim costs £33,080 to £36,995 and Style trim £38,500 to £40,000, both excluding the £1500 government EV grant. The largest battery delivers up to 391 miles WLTP in Life trim or 387 miles in Style trim, with charging at up to 183kW.
Why it matters
A mainstream Volkswagen hatchback that stays on 400V with a 183kW peak suggests demand will sit within existing high power DC provision rather than needing ultra rapid hardware. Pricing from £33,080 before the grant points to a volume model that could widen the UK driver base using public charging.
Hillcrest Energy Technologies and Equipmake agree to co-develop 800 V ZVS traction inverter for heavy-duty EVs
Hillcrest Energy Technologies and UK drivetrain manufacturer Equipmake have signed an agreement to jointly develop an 800 V traction inverter using Hillcrest's zero-voltage-switching technology for heavy-duty trucks, buses and off-highway equipment. Hillcrest says its ZVS inverter reached 99.7% peak efficiency in laboratory testing, with lower electromagnetic interference in EMC chamber tests and a more than 90% reduction in motor-terminal voltage overshoot in bench tests. The milestone-based programme has two prototype stages and starts once the technical specification and resource plan are finalised, which both firms have committed to do within six months, as reported by EVNews on 17 November 2026.
Why it matters
Higher efficiency 800 V drivetrains for heavy-duty vehicles could shape the charging power levels and duty cycles that fleet operators and CPOs need to plan for. The programme is still at the pre-specification stage, so it signals direction rather than near-term product availability.
Tesla Model X named the UK's least reliable electric car in MotorEasy Reliability Index
The Tesla Model X scored 1.1 out of 10 in the MotorEasy Reliability Index, ranking 423rd of 428 vehicles for the number of repairs and 306th for repair costs. The Model S was second worst among EVs on 1.4, while the Model 3 ranked sixth on 6.6, and the Porsche Taycan (2.6), Jaguar I-Pace (4.9), original Audi e-tron (6.3) and original BMW i3 (7) also featured. The index draws on real warranty claims paid by the car management and aftermarket warranty provider, covering repair frequency, costs and common faults.
Why it matters
Vehicle reliability influences fleet buying choices, which in turn shape the mix of cars using depot and destination chargers. This is context for demand planning rather than data on charging infrastructure, and it rests on one warranty provider's claims data.
DPD adds over 720 new electric vans and seven parcel depots ahead of record UK peak
DPD has confirmed a record number of EVs on the road this Christmas, including over 720 new Mercedes-Benz e-Sprinter and Ford E-Transit vans. It has also opened seven new depots in Croydon, Derby, Doncaster, Eastleigh, Norwich, Stockport and Worcester, ranging from 21,000 sq ft to 83,000 sq ft, following three automated distribution centres opened earlier this year in Crawley, Darlington and Sittingbourne. The announcement came ahead of Black Friday, with next-day delivery running seven days a week up to and including Christmas Eve.
Why it matters
A fleet addition of more than 720 electric vans alongside new depot capacity points to fresh depot charging demand across a wide spread of UK sites. Charge point operators and installers serving logistics fleets should note the pace of rollout and the number of locations involved.
Geely confirms two battery sizes for Monjaro EM-i PHEV, with up to 105 miles of electric range
Geely has confirmed the Monjaro EM-i plug-in hybrid will be offered with a 30.7kWh or 40.1kWh battery. The smaller pack gives 85 miles of electric range, front wheel drive and 251PS on Pro and Max trims, while the 40.1kWh pack gives up to 105 miles, all wheel drive and 323PS on Ultra and Hyper trims. Both can DC fast charge, at up to 90kW on the 30.7kWh models and 120kW on the 40.1kWh models, according to the report.
Why it matters
A PHEV with a 105-mile electric range and 120kW DC capability is an unusual specification for the segment, and it may shift where UK drivers charge and how often they use public rapid points. CPOs and fleet buyers should note the DC acceptance on these plug-in hybrids when judging demand at rapid sites.
Geely Monjaro seven seat PHEV claims 105 miles of EV range ahead of European and UK launch
Geely will launch the 4770mm Monjaro plug in hybrid SUV in Egypt in August, followed by a European debut and a UK launch likely next year, according to the report. It uses the same hybrid technology as the smaller Starray, which produces 258bhp and offers 81 miles of engine off range with its larger battery, but the Monjaro drives both axles and Geely has not yet confirmed powertrain details. UK pricing is unannounced, though a start in the low £40,000s would put it against the Omoda 9, Jaecoo 8, MG HS, BYD Seal U and Leapmotor C10.
Why it matters
A growing field of Chinese D segment PHEVs with real electric range points to more plug in drivers who will want home and destination charging in the UK. CPOs and procurement teams should factor these models into demand forecasts for lower power AC provision.
City of London adds Electrogenic electric Rolls-Royce Phantom VI to Lord Mayor's fleet
The City of London has introduced a 1973 Rolls-Royce Phantom VI converted to electric by Oxford-based Electrogenic, which debuted in the Lord Mayor's ceremonial show procession marking Alderman Bronek Masojada's inauguration as the 698th Mayor on November 13. The car uses a 161bhp electric motor and a 62kWh battery for up to 120 miles of range, with charging speeds of up to 100kW. The conversion involves no cutting, drilling or welding of the body, so it is fully reversible, and the City presents it as part of its net carbon emissions drive.
Why it matters
A high profile civic fleet addition shows public sector bodies are using visible electrification to signal net zero commitments, and it adds a niche example of 100kW charging demand from converted heritage vehicles. The impact on charging volumes is small, but it points to a wider pool of conversion vehicles that may need compatible charging access.
M&H Carriers more than doubles its electric van fleet with 18 Mercedes-Benz eSprinters
Scottish distribution firm M&H Carriers has added 18 Mercedes-Benz eSprinters, taking its electric van fleet to around 30 vehicles. Western Commercial delivered the first five in July, with the rest being introduced across operations in Aberdeen, Elgin, Inverness and Perth. The firm began electric van operations in 2021 and reports they are cheaper to run on suitable routes, and it has strengthened charging infrastructure at its Aberdeen and Perth depots.
Why it matters
The longer range of the latest eSprinter is letting this operator put electric vans on more demanding routes, which points to growing depot charging demand from regional logistics fleets. Charging upgrades at Aberdeen and Perth show how fleet expansion translates into depot infrastructure work for installers and CPOs.
XPENG confirms UK prices for L03 and G9L SUVs, with deliveries from January 2027
XPENG has set UK pricing at £32,990 on the road for the L03 SUV Coupé and from £64,990 for the flagship G9L. Both models can be ordered now, with first deliveries expected in January 2027 for the L03 and February 2027 for the G9L. The company also plans five new right-hand-drive models over the next 12 months and a retail and service network of approximately 100 locations, as reported in the announcement.
Why it matters
A further Chinese brand scaling up to roughly 100 UK locations and a wider model range points to growing demand for charging at dealer, service and customer sites. CPOs and installers may find fresh opportunities in network partnerships, though the excerpt gives no charging specifics.
Vauxhall Corsa GSE electric hot hatch driven, with 281hp and up to 232 miles of WLTP range
John Kendall's first drive of the Vauxhall Corsa GSE covers an electric supermini priced from £32,995 on the road, including the Electric Car Grant. It shares the 54kWh battery and 281hp (207kW) motor of the Mokka GSE, with WLTP combined range of 212 to 232 miles depending on tyre choice and efficiency of 3.7 to 3.9 miles/kWh. Vauxhall quotes 0 to 80% in 30 minutes on a 100kW DC charger, and the review notes that using the full performance would make either range figure unrealistic.
Why it matters
A performance focused small EV with a 54kWh pack and a 100kW DC charging rate points to drivers who will rely on rapid charging if they use the car's performance. For CPOs, it is another model in the 100kW class, where a 30 minute 0 to 80% session is the expectation to plan for.
Maeving to launch RM1S and RM2 electric motorcycles in Australia from $14,995
British manufacturer Maeving will enter Australia in early 2027, its first Southern Hemisphere market, with deliveries starting in Sydney before expanding to Brisbane and Melbourne. The RM1S and the new two seat RM2 both start at $14,995 before on-road costs, and each has a built in 3.3 kW charger that takes the batteries from 20 to 80 per cent in an hour on a Type 2 AC charge point, with a full charge in two and a half hours. The two 3.33 kWh battery packs are removable for indoor charging from a standard power point, and a full charge costs about $2.25 at roughly 34 cents per kWh, according to the report.
Why it matters
The bikes charge on Type 2 AC and from ordinary sockets, so they add light demand to existing AC destination and public sites rather than requiring new DC capacity. Because the packs can be taken indoors, much of the charging will happen at home, which limits the public charging opportunity for CPOs.
JLR confirms smaller electric Defender and Range Rover GT are heading to production on its EMA platform
According to Car and Driver, JLR boss PB Balaji said on an earnings call that the smaller electric Defender will enter production at the end of next year, with the Range Rover GT also in the pipeline, though he reportedly suggested only the Defender will start in 2027. Both models use the Electrified Modular Architecture (EMA), which supports 800 volt systems and both battery electric and hybrid powertrains, and are expected to be built at the factory that currently makes the Discovery Sport and Range Rover Evoque. No official name or technical specifications have been given.
Why it matters
An 800 volt capable platform points to future JLR models that can take advantage of higher power DC charging, which is relevant to how CPOs specify and future proof UK sites. Production timing at the end of next year gives a clear marker for when demand from these vehicles could begin to reach the network.
Peugeot adds Envy trim to E-208 and E-2008 in the UK, with prices from £24,065
Peugeot has introduced a new Envy trim for its all-electric E-208 supermini and E-2008 crossover, built on the entry-level Allure spec and sitting below the GT and GT Premium. Both qualify for the UK Government's £1,500 Electric Car Grant, bringing the E-208 Envy to £24,065 and the E-2008 Envy to £28,465. Equipment includes keyless entry and start, a 180 degree reversing camera, front and rear parking sensors and i-Cockpit, with the E-2008 also gaining an underfloor cable storage system in the boot.
Why it matters
Grant-eligible pricing of £24,065 and £28,465 keeps mainstream electric models accessible, which supports continued growth in the vehicle parc that public and fleet charging infrastructure must serve. For CPOs and fleet buyers, it also widens the pool of lower-cost electric cars likely to appear in the UK market.
Porsche makes cathode material from fully recycled raw materials while BMW wins award for Gen6 battery
Porsche has produced cathode active material from entirely recycled raw materials after a pilot with partners including Cylib, and cells made with 100% recycled materials are now being tested in Porsche EVs. End-of-life high-voltage batteries from Porsche Centres in Germany have been recycled since May 2026 using a water-based process, with recovered materials intended for new cell production from 2028, though Porsche says at this stage the materials only "could be" used in its high-voltage batteries. Separately, BMW became the first foreign car maker to win an Innovative Technology Award at the World New Energy Vehicle Congress in China for its Gen6 battery, a flat design with cylindrical cells fitted directly into the main housing rather than split into modules.
Why it matters
Recycled content and tracked material accounts are becoming part of battery supply chains, which may shape how vehicle makers and their suppliers approach sustainability requirements in future tenders. The 2028 target and Porsche's cautious wording suggest commercial use at scale is still some way off, and BMW's Gen6 points to continued progress on range and charging speed that charging networks will need to serve.
Volkswagen opens UK orders for the ID. Cross electric SUV from £26,985
Volkswagen has announced UK pricing for the ID. Cross, a compact five-seat electric SUV with up to 265 miles of WLTP range. Prices run from £26,985 for the Life with a 37 kWh battery and 135 PS to £33,675 for the Style with the 52 kWh battery, with the 52 kWh Life at £30,260 and the 37 kWh Style at £30,400. Orders open on Thursday 19 November 2026 for the 52 kWh versions only, with 37 kWh models expected in January 2027. All prices are on-the-road recommended retail prices including VAT.
Why it matters
A new mass-market electric SUV priced from £26,985 widens the pool of UK drivers moving to EVs, including those buying with a smaller battery, which feeds future demand for public and destination charging. Operators and fleet buyers planning capacity can note the staggered launch, with larger battery cars arriving first and smaller ones from January 2027.
MG launches limited edition MG4 Urban Design Edition in the UK, capped at 400 cars
MG will put the MG4 Urban Design Edition on sale in UK showrooms in December, limited to 400 examples and bundled with a Christmas gift pack including a teddy bear, key ring and travel mug. It uses the same powertrain as other long range MG4 Urban versions, a 158bhp front motor and 52.8kWh battery, giving up to 251 miles of range with a heat pump as standard. Buyers can choose Dynamic Red or Kensington Blue, with a gloss black roof, 17 inch alloys, and Premium grade features such as heated seats and a 360 degree camera.
Why it matters
This is a small, cosmetic run with no change to battery or charging hardware, so it adds little new demand on charging networks. It does show MG continuing to push affordable EVs in the UK, which supports the steady growth of mainstream drivers who will rely on public and home charging.
Alpine plans 2027 A290 upgrade with larger battery, longer range and possible 296bhp four-wheel-drive GTX
Alpine is preparing a substantial upgrade to the A290 for next year, replacing the 52kWh battery with a 56kWh pack shared with the Renault 4 and 5, and fitting an improved '6AM' motor with lower losses. All three versions are expected to exceed 249 miles per charge, with the GT approaching 280 miles, against current figures of up to 227 miles for the 215bhp GT Performance and GTS and 237 miles for the 177bhp GT. The car sold 5890 units in Europe in the first half of 2026, up 60% on the same period in 2025, led by France and the UK, according to the report.
Why it matters
A best-selling compact EV gaining range and a possible four-wheel-drive performance variant points to a growing base of UK drivers in the performance hatch segment. Range gains of this kind may ease charging frequency concerns, though real-world demand at motorway sites will still depend on efficiency at higher speeds.
Audi A2 E-tron driven: retro supermini returns as the smallest and most affordable E-tron model
Audi has revived the A2 as an electric hatchback wearing the E-tron badge, following a 2011 concept and a one-off electric restomod in 2024. It uses the latest version of the Volkswagen Group's MEB platform, is longer and taller yet slightly narrower than a Volkswagen ID 3, and claims a drag coefficient of 0.24. The entry-level 52kWh and mid-rung 61kWh models use lithium-iron-phosphate (LFP) packs that can be charged to 100% without degrading, according to the road test.
Why it matters
A premium compact EV aimed at rivals such as the Volvo EX30 and Cupra Born adds to the pool of drivers who will use public charging. LFP packs that tolerate regular full charges may also shape session lengths and how drivers use chargers on site.
Hocking's dairy trials Whitby Morrison's first all-electric ice cream van in North Devon
Hocking's dairy in North Devon, England, received Whitby Morrison's first all-electric ice cream truck in July, giving it a full ice cream season of use, according to Electrek as relayed by The Cool Down. The Mercedes eSprinter-based vehicle worked shifts of up to 12 hours while covering more than 100 miles a day. Whitby Morrison is described as the top manufacturer of ice cream vans.
Why it matters
Long shifts with 100-plus mile daily ranges show small commercial fleets with demanding duty cycles are becoming viable electric adopters, which points to emerging depot and overnight charging demand from food service operators. The coverage does not state charging arrangements, so CPOs should treat this as a demand signal rather than a specified requirement.
UK guide ranks the longest range electric cars on sale in 2026 by WLTP combined range
A UK consumer guide lists the longest range EVs currently on sale, ranked by the quoted WLTP combined range figure, and covers everything from saloons to family SUVs at a variety of price points. It says some cars can now manage the London to Brighton run and back nearly four times without charging. It cites the 2025 RAC Report on Motoring, in which 51% of those surveyed worry that EVs lack the battery range for long journeys as easily as petrol or diesel cars.
Why it matters
Range concern remains a major barrier for UK drivers still sitting on the fence, so confidence in long journey charging stays central to adoption. As long range models spread beyond luxury buyers, CPOs and procurement teams should expect more drivers to judge networks on reliability and availability on longer trips.
JLR confirms smaller Defender on new EMA platform will launch in 2027 with hybrid and battery-electric options
JLR has confirmed that EMA, its new platform underpinning a second, smaller Defender model, will now include the option of hybrid (HEV) as well as battery-electric (BEV) powertrains. Autocar reports that the model, widely referred to as the Defender Sport though the name is not confirmed, has been spotted testing on UK roads. It will be the first entirely new product since Defender became a standalone brand under JLR's House of Brands approach, and the first in an expanded Defender range.
Why it matters
Adding hybrid alongside battery-electric on EMA suggests a slower pure-EV mix for this Defender line, which may temper the pace of charging demand from its buyers. Charging network planners and fleet-facing CPOs should note the 2027 timing when forecasting UK demand from premium SUV drivers.
JLR lowers FY27 margin guidance to 2% to 3% and expects free cash outflow of about £1.25bn
Jaguar Land Rover cut its FY27 adjusted EBIT margin guidance to 2% to 3% from 4%, citing a challenging global environment, as reported alongside its second quarter results to 30 September 2026. Q2 revenue rose 20% year on year to £5.9bn and profit before tax and exceptional items was £6m, against a £485m loss a year earlier. The company recorded a £540m free cash outflow in Q2 and ended September with £1.8bn in cash and £6bn in total liquidity, including a new £1bn loan facility signed on 30 September.
Why it matters
A major UK automaker guiding to thinner margins and a sizeable cash outflow may become more selective about spending and supplier terms. Charging suppliers and CPOs with JLR linked programmes should watch for any change in timing or scope.
Harris Sinotruk sets UK pricing for Sitrak diesel and electric 7.5 tonne trucks, with electric from £59,950
Harris Sinotruk has announced UK pricing for the Sitrak range, the Chinese brand's entry to the UK market. The Euro 6 diesel chassis cab starts from £44,950 MRRP, while the battery electric version starts from £59,950 MRRP, or £47,960 MRRP after the £11,990 Zero Emission Truck Grant. Customer deliveries begin in March 2027, following Harris Group's September announcement of an exclusive deal to distribute Sinotruk trucks in the UK and Ireland.
Why it matters
The electric Sitrak can be paired with the newly opened £38m second tranche of the Depot Charging Scheme, which funds 60% of charge point hardware and civil works up to a £1m cap, so fleets can budget for vehicle and depot together. With deliveries due in March 2027, CPOs and installers have a clear window to engage operators considering a new low priced entrant on depot charging projects.
DPD adds 381 Ford E-Transit vans to its UK fleet ahead of Black Friday and Christmas
DPD has added a further 381 Ford E-Transits, 3.5 tonne equivalent vans chosen for maximum payload and enhanced range, as it prepares for Black Friday and the Christmas period. The order follows 341 Mercedes-Benz eSprinter vans delivered in September, and DPD says it delivered more than 85 million parcels using EVs in 2025. Last year the company announced £330 million of investment in seven new distribution centres, in Crawley, Darlington, Cambridge, Bradford, Guildford, Milton Keynes and Sittingbourne, designed to accelerate its electric van rollout.
Why it matters
Large van orders of this scale, backed by seven new distribution centres, point to growing depot charging demand at DPD sites across England. CPOs and installers should note that fleet electrification is being planned around depot hubs, which is where charging procurement for this work is likely to sit.
Xpeng opens UK sales of G9L seven-seat flagship SUV from £64,990
Xpeng has confirmed UK pricing for the G9L, a 5.1m long and 2m tall seven-seat SUV that sits above the G6 and L03, starting at £64,990. It is priced against the Hyundai Ioniq 9 and Kia EV9, undercuts the Volvo EX90 by around £8,000, and costs more than the Skoda Peaq and the Peugeot E-5008. It is offered as a pure EV in rear-wheel-drive Long Range or all-wheel-drive Performance versions with an optional Ultra trim, or as a range extender, with ultra-fast charging cited among its features.
Why it matters
Another large premium seven-seat EV entering the UK market adds to the mix of vehicles that charging networks will need to serve, particularly for ultra-fast charging at hubs. The article gives no charging figures, so CPOs should check the specification before planning for its charge rates.
Xpeng opens UK orders for L03 coupe-SUV from £32,990 with 10% to 80% charging in 20 minutes
Xpeng has announced UK pricing for the L03, a C-segment coupe-SUV positioned against the Skoda Enyaq Coupe and Ford Capri, with prices starting at £32,990. The entry RWD Standard Range has a 57.6kWh battery, 276 miles of range and a 193kW peak charge rate, while the 70.4kWh Long Range (£35,990, 323 miles) and Performance (£39,990, 273 miles) versions peak at 236kW. Both battery sizes are quoted at 10% to 80% in 20 minutes, according to the report on UK order openings.
Why it matters
A new Chinese entrant pricing several thousand pounds below established rivals, with peak charge rates of 193kW and 236kW, adds to the pool of vehicles able to use high-power chargers, which matters for hub planning and utilisation forecasts. Procurement teams and CPOs should note the quoted 20 minute 10% to 80% window when considering dwell times and charger power specifications.
Second-generation Dacia Spring moves to Renault Group RG-EV platform and Slovenian production
Dacia has launched the second-generation Spring EV, developed in under two years alongside the Renault Twingo and Nissan Pixo by a dedicated team in Shanghai. The first-generation car sold more than 210,000 units since 2021, and the new model is 3855mm long, 1722mm wide with a 2492mm wheelbase. It will be built in Slovenia, avoiding the EU tariffs that hit the old Spring, and is expected to be about £1700 cheaper than the Twingo based on European prices, with UK pricing still pending a decision on government grant eligibility, according to this first drive report.
Why it matters
A larger, cheaper small EV built inside the EU points to continued growth in affordable electric car ownership, including drivers without home charging who rely on public networks. Grant eligibility is still unresolved, so CPOs and fleet buyers should watch UK pricing before forecasting demand from this segment.
Zenobē to finance 169 electric buses and deliver charging at four London depots for Transport UK London Bus
Zenobē has signed a new agreement with Transport UK London Bus, formerly Abellio London, covering finance for 169 electric buses and charging infrastructure at depots in Twickenham, Battersea, Beddington and Walworth. Announced on 3 November at Euro Bus Expo 2026 in Birmingham, the package also includes depot design and construction, energy procurement support and fleet management software, with infrastructure works due for completion by the first quarter of 2027. It forms part of a fleet electrification programme targeting 2030.
Why it matters
The deal shows operators bundling vehicle finance, depot build, energy procurement and software into a single package from one provider, which shapes how depot charging work is packaged and who wins it. CPOs and contractors targeting bus depots should note the Q1 2027 delivery window and the integrated model.
Guide ranks the fastest charging electric cars on sale in the UK by peak DC power
A UK buyer's guide lists the fastest charging EVs available to British buyers, including models from BMW, Volvo, Xpeng and Denza, using stated peak DC charging power as the measure. It notes that Geely has revealed technology charging at 2.25MW, around 10 times faster than a Polestar 2 from a couple of years ago, and that Chery and BYD promise 1,400kW to 1,500kW with claims of 10% to 80% in under five minutes. Virtually all of those cars and chargers are currently available only in China, so the guide focuses on UK models.
Why it matters
Vehicle peak charging power is rising quickly, but ultra high power claims are not yet reaching the UK, so the near term question for CPOs is how well sites serve the UK models already on sale. Peak figures also ignore battery size and how long a car can sustain that power, so they are only a rough guide to real charging times at your sites.
British Gas adds 1,986 Volkswagen Transporter vans, electric and diesel, to its UK fleet
British Gas is rolling out 1,986 new Volkswagen Transporter vans, spanning both electric and diesel models, to support its nationwide engineering operations. The vans have started reaching UK roads, with full deployment running into early 2027, and Bri-Stor Systems has fitted them with bespoke racking and storage. Engineers will use them for diagnostics, servicing and repairs of boilers, heat pumps and EV chargers, and the report notes British Gas already runs one of the largest electric van fleets in the UK.
Why it matters
A large fleet buyer continuing to add e-Transporters points to sustained depot and en-route charging demand from commercial operators. The mixed electric and diesel split also shows that fleet electrification is still being phased, which matters when sizing charging capacity for such customers.
Openreach to adopt Allstar fuel card network for its growing EV van fleet
Openreach (BT) has confirmed it is working to adopt Allstar's UK fuel card network to support its move to electric vehicles, with over 7,000 of its 22,000 vehicles now EVs. The company has installed more than 4,000 chargers at operational sites and engineers' homes, but around one in three engineers cannot fit a home charger. Allstar Homecharge would let engineers with home chargers have work charging costs paid directly to their energy supplier rather than claiming expenses back, while the Allstar Co-Pilot app will also be used to guide charging, as reported by the publication.
Why it matters
Fleet operators are pairing home charging with shared depot and retail site access, and want payment systems that remove expense claims. CPOs and site hosts can see that partnerships such as those with First Bus, Sainsbury's and Source are becoming part of how large fleets solve the gap for drivers without off-street parking.
Higer launches Azure 9 city bus for the UK and puts V12 into FlixBus trials
At Euro Bus Expo 2026, which opened at the NEC in Birmingham on 3 November, Higer and its UK distributor Harris Bus & Coach showed three models, the Azure 9, V12 and V10, and officially launched the Azure 9. The 8.9 metre Azure 9 is Higer's first model aimed at the mainstream UK city bus market. It uses a 4.5 litre Cummins Euro 6 engine with a Voith automatic transmission, has a rated capacity of 63 passengers, and the headline notes the V12 is entering FlixBus trials.
Why it matters
The Azure 9 as described is a diesel vehicle, so it adds no depot charging demand, but it shows Higer building out its UK line up and dealer network. Procurement teams should watch whether electric variants follow, as the source excerpt does not mention any.
DPD adds 381 electric Ford E-Transits ahead of record peak period
DPD is adding a further 381 Ford E-Transits, the 3.5t equivalent model with maximum payload and enhanced range, with all vehicles due on the road by mid-November for Black Friday and Christmas. The order follows the delivery of 341 Mercedes-Benz eSprinter vans in September. DPD says it delivered over 85 million parcels on electric vehicles in 2025 and runs a predominantly diesel-free final mile service within the North and South Circular in London.
Why it matters
Two large van orders in quick succession, totalling 722 vehicles, point to sustained depot and en route charging demand as DPD moves electric vans beyond city centres and onto longer routes. CPOs and charging installers serving parcel fleets should expect continued demand for reliable, high availability charging capacity.
UK fleet leaders report greater spend complexity from EVs, with 44% relying on driver self-reported home charging
Research from Cubic3, the company behind the FleetWallet payment and fraud control platform, found that 54% of UK fleet leaders say introducing electric vehicles has made payment and spend management more complex. Fleets expect on average 49% of their vehicles to be electric within three years. Among fleets whose drivers charge at home, 44% ask drivers to report their own kWh, while only 20% primarily use a dedicated tariff or meter. The Censuswide survey covered 250 UK fleet managers, fleet directors and finance or procurement leads, and found 93% are confident they would quickly spot unauthorised or fraudulent spend, yet only about 41% say fleet payment management is "under control".
Why it matters
Home charging is a growing share of fleet energy use, and self-reporting leaves reimbursement open to error and disputes. That points to demand for metered or tariff-based home charging and integrated payment tools, which matters for CPOs and suppliers targeting fleet customers.
Volkswagen opens UK orders for Caddy Kombi with plug-in hybrid and diesel options
Volkswagen Commercial Vehicles has opened UK orders for the dual-purpose Caddy Kombi, available with plug-in hybrid (PHEV) and diesel derivatives. Prices start at £30,055 before VAT, or £37,507 on the road. The Kombi offers five seats, or two seats with a larger secure load space, with a payload of 775kg and a towing capacity of 1,500kg on the PHEV eHybrid model. It comes in Commerce Plus and Commerce Pro trims and two wheelbase lengths.
Why it matters
A new PHEV light commercial option adds to the mix of vehicles that fleet and site operators may need to plan charging for. Because it is a plug-in hybrid sold alongside diesel, uptake will depend on how fleets balance charging access against their duty cycles.
Volvo opens UK orders for refreshed EX40 from £43,860 OTR, with EC40 from £45,860
Volvo has announced UK pricing for the refreshed fully electric EX40 SUV, starting at £43,860 OTR for the entry level P5 Long Range Plus, with order books now open. It is available in rear wheel drive or all wheel drive with up to 354 miles of range, while the EC40 SUV coupé starts at £45,860 in Long Range Plus Pro spec and is quoted at 359 miles. The update, introduced in September, brings a redesigned front end, new Matrix LED headlights with 15 lighting segments each, and new rear lights and tailgate.
Why it matters
Clear UK price points and ranges of up to 354 and 359 miles give fleet buyers and site planners firmer reference points for demand from a popular premium model. The report gives no charging speed details, so connector and power planning will need Volvo's technical specifications.
VQS reports 56% of October vehicle movements were electric or hybrid
Vehicle inspection and logistics provider Vehicle Quality Solutions (VQS) said 56% of all vehicles it moved in October were electric vehicles or hybrids, as corporate fleet and remarketing sectors electrify. VQS attributed the shift to corporate green mandates and lower benefit-in-kind rates, while diesels still made up 26% of movements because light commercial vehicle fleets are electrifying more slowly. It also noted a move towards centralised inspection, refurbishment and de-fleeting around strategic logistics corridors, with an average October movement of 122 miles.
Why it matters
A rising share of electrified fleet and remarketing volumes points to growing demand for charging at depots, inspection and refurbishment hubs, and logistics corridors. The slower pace of LCV electrification suggests van-focused charging demand may build later than car-led demand.
UK battery electric cars take 32.0% of October 2026 registrations, 8,018 cars behind petrol
The UK registered 152,730 new cars in October 2026, up 5.4% on a year earlier and the 11th consecutive month of market growth, according to the SMMT. Battery electric cars took 32.0% of registrations against 37.2% for petrol, a gap of 8,018 cars, and the BEV share was the highest monthly figure of 2026 so far, up from 28.3% in September. Year to date, 503,805 BEVs have been registered, up 30.4%, for a 26.6% share, while petrol has fallen to 41.1% from 47.2% at the same point in 2025.
Why it matters
A narrowing gap between BEV and petrol registrations points to a steadily growing base of plug-in vehicles that will need public and destination charging, which supports demand forecasts for site utilisation. The article notes discounts are shaping the market, so CPOs and procurement teams should treat the pace of uptake as partly price-driven when planning rollout volumes.
AX orders 614 BMW cars for its replacement fleet, including 88 fully electric models
Accident aftercare company AX has bought 614 BMW cars for the replacement vehicles it supplies to customers after an accident, of which 88 are fully electric. The electric models are 32 i4 Gran Coupés, nine i5 saloons, one i7 saloon and 46 iX SUVs, and plug-in hybrid and fully electric cars together make up over 50% of the order. The purchase supports AX's EV-for-EV promise, which gives electric drivers an electric replacement while their own car is off the road, and many of the vehicles have already been delivered.
Why it matters
A UK accident replacement fleet taking on dozens of electric cars adds a steady flow of EVs that will need charging access, including drivers who may not have home charging. Charge point operators and fleet charging buyers should note this as a further source of short term, varied EV demand.
Whitby Morrison delivers first fully electric ice cream truck to Hocking's dairy in North Devon
Whitby Morrison, which describes itself as the world's leading ice cream truck manufacturer, has delivered its first fully electric ice cream truck to Hocking's dairy in North Devon, England. Built on a standard Mercedes eSprinter chassis cab rather than a retrofitted diesel van, it has operated since July through one ice cream season, reportedly covering more than 100 miles a day and serving for up to 12 hours at a time. The manufacturer says it is open for orders for more and calls the vehicle the world's first fully certified electric ice cream truck, a claim the publication says it has not independently verified.
Why it matters
Specialist converters building on factory electric chassis cabs point to demand for depot and overnight charging among small rural fleets with long daily duty cycles. For CPOs and installers, it is a signal that niche commercial operators in places like North Devon may become a new source of private charging enquiries.
UK data shows electric cars offer around 50% more range than electric vans
Analysis of more than 1,300 UK vehicles by data technology specialist Vehicle Data Global (VDG) found that battery cars offer around 50% more range per charge while using 31% less electricity per mile than e-vans. The 1,053 cars in the sample have a median combined test cycle range of 309.5 miles, against 201 miles for the 311 electric vans, and van maximum charging power is almost 26% lower than for cars. VDG stressed that range figures come from standard tests and charging figures reflect peak power in a charge cycle, so real-world results will vary.
Why it matters
Vans cannot make use of the fastest public chargers and often take longer to charge than cars, which affects dwell times and site planning for CPOs serving fleet operators. Fleet buyers, who make up most e-van purchasers, will need depot and public charging plans that reflect van specific operating conditions such as heavy payloads.
UK used battery electric car transactions rise 23.2% in Q3 to 97,625, a 4.8% market share
The Society for Motor Manufacturers and Traders (SMMT) reports that used battery electric vehicle transactions in the UK grew 23.2% in Q3 2026, reaching 97,625 and taking a 4.8% share, up from 3.9% a year earlier. Year to date, used BEV transactions are up 39.6% to 295,524 units, while the overall used car market grew just 0.5% to just over six million transactions. Hybrid electric vehicles rose 25.9% to a 6.7% share, plug-in hybrids fell 13.3% to 20,911 units, and fossil fuel vehicles made up 87.5% of used sales, down from 89.5%.
Why it matters
A growing used EV market brings more drivers without home charging into the public network, widening the customer base that CPOs and site hosts can serve. Demand planning should allow for more second-hand EV owners, though fossil fuel vehicles still account for 87.5% of used sales.
Driventic VEDS drive selected to repower 28 Metroline Optare Metrodecker EV buses in London
Driventic says its VEDS electric drive system has been selected to repower 28 Optare Metrodecker EV double decker buses operated by Metroline in London, under a refurbishment programme run by Wrightbus subsidiary NewPower at its Bicester, Oxfordshire facility. The work replaces the axles, electric powertrain, battery systems and HVAC equipment on buses that are already electric, with CATL supplying the batteries and Grayson the HVAC. Driventic's press release describes it as the company's first electric to electric repowering programme.
Why it matters
Refurbishing existing electric buses rather than replacing them points to a route for operators to extend fleet life while keeping current depot charging in service. Depot planners and CPOs should check whether the new battery systems change charging requirements at the affected sites.
Volvo opens UK orders for XC90 T8 Long Range PHEV at £75,765
Volvo has opened UK orders for the XC90 T8 Long Range Plug-in Hybrid at £75,765, positioned above the £66,270 B5 Mild Hybrid. It offers 101 miles of electric range, more than double the previous T8 PHEV, from a 41kWh battery paired with a 2.0-litre four-cylinder petrol engine producing 461PS. Total range is 1,096 miles, the official rating is 941.6mpg, and 0 to 62mph takes 5.2 seconds.
Why it matters
A 41kWh battery and 101 miles of electric range could shift more PHEV driver journeys onto electric running, which matters for workplace and home charging demand and for fleet charging policy. Buyers and CPOs weighing PHEV uptake in premium fleets should note the larger battery when planning charger provision.
Grid & Energy
Ofgem energy price cap to rise 26% to £2,166 a year from January 2027
Ofgem has announced that the price cap for 1 January to 31 March 2027 will rise 26% to £2,166 per year, based on the average unit rate and standing charge for Direct Debit customers in England, Scotland and Wales. The regulator attributed the rise to wholesale gas prices that remain high because of the ongoing war in the Middle East. The Government is removing VAT from electricity bills from 1 October 2026 to 30 June 2027 (gas keeps 5% VAT), and around 20 million households in council tax bands A to D will receive £100 towards their bill from January. myenergi CEO Andrew Clint said the rise was predictable and called for the Energy Independence Bill to speed up cheaper renewable electricity and the rollout of home batteries, solar and connected energy technologies.
Why it matters
Gas driven bill pressure, alongside VAT relief on electricity, strengthens the political and consumer case for shifting energy use towards electricity, which could support demand for home and connected charging. Procurement and CPO teams should watch how the Energy Independence Bill develops, as it may shape policy support for electrified energy products.
SGE SMR UK Hosts Supplier Event for Proposed 14-Reactor, 4.2GW BWRX-300 Programme
SGE SMR UK, GE Vernova Hitachi Nuclear Energy and Samsung C&T hosted more than 200 British companies in Birmingham on 24 November to shape the supplier strategy for a proposed £35bn programme of 14 BWRX-300 small modular reactors across three UK sites. The proposal, submitted to the Department for Energy Security and Net Zero in July under the Advanced Nuclear Framework, has progressed to the Preliminary Regulatory Assessment Deep Dive. First power is targeted for 2034, with the full project expected to meet around 11% of current UK consumption, equivalent to eight million homes for 60 to 80 years.
Why it matters
A 4.2GW nuclear build-out, if it proceeds, would add large volumes of low-carbon baseload supply from the mid-2030s, which is relevant to long-term grid capacity and power price assumptions behind charging networks. It also signals competition for UK engineering, construction and specialist supply chain capacity, which charging developers should watch when planning grid connections and civil works.
Watson Farley & Williams advises lenders on operational debt for BW ESS Hams Hall battery storage project
Watson Farley & Williams advised a consortium of lenders and hedge providers, comprising OCBC, Rabobank and Societe Generale, on an operational debt package for BW ESS's Hams Hall battery energy storage system in the West Midlands. The project has entered commercial operation with 350MW (1,243MWh) of capacity, described as the largest operational BESS in Europe by MWh, and is expected to reach 400MW (1,424MWh) after its second phase. Revenues for the first phase are underpinned by a 10 year floor and optimisation agreement with EDF, and the site forms part of the 2.6GWh Ardenham portfolio co-owned with AIP Management.
Why it matters
A bank-backed operational debt package on a large UK BESS with a 10 year floor and optimisation agreement shows how lenders are pricing contracted storage revenues, which is a useful benchmark for CPOs and developers structuring co-located or grid-connected charging and storage assets. The scale of the project and its location next to a National Grid substation also reinforce the importance of grid connection positioning.
LCP Delta says faster renewables and grid investment could have cut almost £100 from household bills this winter
New LCP Delta analysis, published ahead of Wednesday's price cap announcement, says the cap is expected to rise by more than £400 from 1 January 2027 because of higher international gas prices. It finds faster progress on renewables, network upgrades and connections reform could have limited the rise to £300, saving households nearly £100. The scenario assumes AR4 and AR5 projects came online two years earlier, plus an extra 2GW of offshore wind, giving around 4.5GW more wind and 1.5GW more solar operating today.
Why it matters
The analysis adds weight to the case for faster grid connections reform and network upgrades, which also shape grid access timelines for charging sites. It also highlights how exposure to gas prices feeds through to electricity costs, a key input for CPO operating models and energy procurement.
Green Volt floating wind farm reserves 28 Siemens Gamesa turbines and secures Port of Aberdeen agreement
Green Volt, the floating offshore wind farm off the coast of Aberdeenshire developed by Flotation Energy and Vårgrønn, has reserved 28 Siemens Gamesa turbines, each capable of generating more than 15MW. It has also agreed a deal with the Port of Aberdeen that will support £15m of investment in port infrastructure and supply chain opportunities. RenewableUK's chief executive Tara Singh welcomed the news, saying it will benefit supply chains in north east Scotland and nationwide, including turbine manufacturing in Hull.
Why it matters
Large renewable generation projects with secured turbine supply and port capacity add to the UK's future clean power pipeline, which shapes grid capacity and long term power supply for charging networks. For CPOs and suppliers, it also signals where industrial investment and supply chain activity are likely to concentrate.
Elexon targets Spring 2028 launch for Flexibility Market Asset Registration, replacing September 2027 date
Elexon is now aiming for a Spring 2028 go-live for flexibility market asset registration, moving back from the previously intended September 2027. A consultation on the design and implementation proposals, run between September and October 2026, found that 21 of 27 respondents (almost 80%) were generally concerned about sector readiness for the earlier date, and it also flagged external dependencies and delivery constraints for key parties. The solution uses a "register once, use many times" approach so providers do not have to register the same asset repeatedly across different markets.
Why it matters
Operators and aggregators planning to stack flexibility revenues across markets should expect single registration to arrive later than first signalled, so near-term bids and systems plans need to allow for repeated registrations. The standardised asset dataset should eventually improve visibility and coordination between markets, but platform migration work lies ahead.
E.ON Next says UK solar homes could save up to £201m a year by adding home batteries
E.ON Next analysis suggests the 1.78 million UK homes with solar panels could collectively save up to £201 million a year on electricity bills by adopting home batteries. Its survey of solar owners found 50% did not realise a battery could cut the electricity they buy from the grid, 40% did not know it lets them store excess energy, and 36% said knowing the potential saving would encourage installation. The company also said pairing a battery with its Next Optimise dynamic tariff could add savings of up to £452 a year for a typical solar and battery customer.
Why it matters
Dynamic tariffs with automatic battery control point to growing demand for flexible, price-responsive home energy, which shapes how households may charge vehicles and interact with the grid. For CPOs and installers, the awareness gaps in the survey show a sizeable solar-owning base that has yet to be reached with storage and smart energy offers.
National Wealth Fund backs two Scottish battery storage projects with Matrix Renewables UK
The National Wealth Fund has announced an equity investment alongside Matrix Renewables UK in two battery energy storage projects at Eccles and Kilmarnock in Scotland, with Matrix keeping a majority stake in both. Together the projects will provide 1GW of power capacity and 2GWh of storage, and more than 200 jobs are expected to be created or supported. Construction is underway at Eccles with commercial operations expected in October 2027, while Kilmarnock is due to start construction in December 2026 with operations targeted for September 2028.
Why it matters
Public equity going into grid scale storage on key Scotland to England transmission corridors points to growing state support for flexibility assets that ease network constraints. For CPOs and developers, it signals where grid capacity and renewable integration are being strengthened, and that the National Wealth Fund is an active co-investor in energy infrastructure.
UK Power Networks awards flexibility contracts worth up to £4 million in industry-first long-term tender
UK Power Networks' DSO has awarded contracts worth up to £4 million to 14 providers, including two new joiners, for 29.4MW of flexible capacity across 59 locations in London, the South East and East of England. Around 15,000 electric vehicle chargers feature among the contracted assets, and the capacity is enough to power 19,600 homes. It is the first GB DSO to award flexibility contracts extending into the 2028 to 2033 distribution regulatory period, and the tender complements its day-ahead market auctions.
Why it matters
Longer-term contracts give charge point operators and aggregators with managed charging portfolios clearer, more bankable revenue visibility from flexibility services. Operators in UKPN's area can now plan investment and customer acquisition around multi-year demand for flexible EV charging capacity.
Cornish Lithium awards Marriott Drilling contract for two-well geothermal lithium programme at Cross Lanes near Truro
Cornish Lithium has awarded Marriott Drilling a major contract to drill two wells at its Cross Lanes Geothermal Lithium Project near Truro, each designed to reach roughly 2,000 metres. Drilling is expected to begin in December 2026 and run for several months, and the programme is intended to confirm the commercial viability of producing lithium from geothermal brines first tested by a 2023 exploration borehole. Marriott, based in Chesterfield and described as the UK's largest onshore deep drilling company, will supply the rig, specialist equipment and personnel.
Why it matters
A domestic lithium source is a long term upstream signal for the UK battery supply chain that ultimately serves EV demand and charging rollout. For procurement and CPO teams it is a watching brief rather than a near term supply change, given that drilling has yet to start and commercial viability is still to be confirmed.
UK Government publishes clean electrification roadmap and backs two offshore wind farms
The UK Government has launched its clean electrification roadmap as the Prime Minister outlined plans to invest in two offshore wind farms. The Clean Energy Industries Sector Plan targets at least a doubling of investment in frontier clean energy industries to over £30 billion a year by 2035, with a further £700 million for Great British Energy, and the Clean Industry Bonus has used £204 million of public investment to leverage £3.4 billion of private investment in British factories, ports and supply chains. The roadmap also cites the ZEV Mandate as driving EV uptake and phasing out new petrol and diesel only cars from 2030, while ChargeUK chief executive Shane Brennan said committing to electrification whilst considering weakening EV targets is a contradiction in terms.
Why it matters
The roadmap names EV charging as an investment and jobs opportunity, but uncertainty over possible changes to the ZEV Mandate leaves demand signals unclear for CPOs and their supply chains. Procurement teams should watch how the supply chain funding and any mandate revisions shape project timelines and investment cases.
UK homeowner with two EVs weighs £6,800 Powerwall 3 quote to avoid peak electricity rates
A UK homeowner told Reddit they had been quoted £6,800 ($8,990) for a home battery, including a Powerwall 3 with backup functionality, as rates rise from 6.6p overnight to 36p at peak. About 3,500 kWh of annual use falls in the peak window, and one commenter estimated that shifting it to overnight charging could save £900 to £1,000 a year after losses. The household has a gas combi boiler and two electric vehicles, according to The Cool Down.
Why it matters
The gap between 6.6p and 36p per kWh shows how strongly time of use tariffs reward load shifting, which affects how CPOs and installers pitch home and workplace charging paired with storage. It is a single Reddit anecdote with commenter estimates, not verified savings data, so treat the figures as indicative only.
Britain's grid alert ended after forecast reserve shortfall shrank from 1,388MW to 200MW
Neso, the National Energy System Operator, issued an unusual low supply alert to generators in the early hours of 9 November, forecasting a potential deficit of 1,388MW against its desired reserve margin during low wind generation. It asked for extra power of roughly 800MW, comparable to a midsize gas plant, and withdrew the alert just after 9am once forecasts of the gap fell from 500MW in a predawn assessment to 200MW. The operator said there was no immediate threat to customers, according to Eastern Eye as reported by The Cool Down.
Why it matters
Tight reserve margins on low wind days show how quickly system conditions can shift, which is relevant to CPOs planning for grid constraints, flexibility and time of use pricing. Sites with load management or on site storage may be better placed if such alerts become more common.
UK solar owner's question on 8 kW grid export limit highlights kW and kWh confusion
The Cool Down reports on a UK homeowner who asked on Reddit what to do with surplus solar power on peak days, given an 8 kW grid export limit and a 9 kWh battery. Commenters explained that the limit describes the rate of export at any instant, while battery capacity is a quantity of energy. One said a 9 kWh battery would take 9 hours to fill at 1 kW of production, or 3 hours at 3 kW, and that mixing up kW and kWh is "a bit like mixing up distance and speed".
Why it matters
Confusion between power and energy among domestic solar and battery owners shows why clear communication of export limits and capacity matters when specifying sites that combine on-site generation, storage and charging. Procurement teams and CPOs working on grid connections should make sure kW limits and kWh capacities are stated and understood consistently.
E.ON Next invests £4 million in 1,000 more free home batteries, saying households can save nearly £500 a year
E.ON Next is investing £4 million to provide 1,000 additional home batteries through its Battery Boost programme, with Northern Powergrid continuing as a partner and UK Power Networks and SP Electricity North West joining. The expansion covers Greater Manchester, Yorkshire, North Lincolnshire and the east and northeast of England, with a focus on households at risk of fuel poverty who do not pay for the equipment upfront. The company says participants save nearly £500 a year without solar panels, and its research found 73% of people were unaware that batteries can power homes without solar, as reported by The Cool Down.
Why it matters
Three distribution network operators backing supplier funded home batteries points to growing demand side flexibility in the same regions where CPOs and local authorities plan charging capacity. Procurement and site teams should note the potential for shifting household load away from peak periods, though the source gives no EV specific detail.
RWE and KKR reach financial close on 2.8GW of UK offshore wind at Vanguard West and Vanguard East
RWE and KKR have partnered to deliver the Vanguard West and Vanguard East offshore wind projects, which total 2.8GW and represent around £12 billion of investment, including the wind farms and their associated transmission infrastructure. Funding comes from equity commitments by both partners plus non recourse project financing from a consortium of international lenders, and financial close has been reached for both projects. Once operational, they are expected to supply the equivalent of around three million UK homes, according to the announcement, which includes comments from the Prime Minister and the Energy Secretary.
Why it matters
Financed, large scale offshore wind adds domestic generation that the UK charging sector will ultimately draw on, which is relevant to long term energy cost and grid decarbonisation assumptions in CPO business cases. It also signals continued private capital appetite for UK energy infrastructure, which can shape the wider funding climate for grid dependent projects.
Renault Scenic owner uses V2L to power a Lake District rental house during a 30 hour blackout in Storm Boelo
A first person report describes how a Renault Scenic with an 87kWh battery supplied limited household power during a 30 hour power cut caused by Storm Boelo. The car's adaptor plugs into the charging port to give a three pin socket, but output is capped at 3.7kW, and the article notes V2L is available on many but not all EVs, including most modern Hyundai, Kia and Renault models and many Chinese ones. It also separates V2L from vehicle-to-home (V2H), which needs a switch to isolate the house from the grid and is more common in the US, and cites average household use of 6.8 to 9.4kWh a day.
Why it matters
Consumer awareness of V2L as a resilience feature is growing, while V2H remains niche in the UK because grid supply is seen as reliable. For CPOs and procurement teams, this points to emerging driver interest in bidirectional capability, though the article describes plug in V2L use rather than any charger or grid integration.
National Wealth Fund commits £1 billion to RWE and KKR's Vanguard West and Vanguard East offshore wind projects
The National Wealth Fund has made two £500 million commitments, one each to the Vanguard West and Vanguard East windfarms off Norfolk, which together total 2.8GW and could supply around three million UK homes. Financial close brings approximately £13 billion of project-backed financing from a consortium of 35 international banks including the National Wealth Fund, and KKR has acquired a 50% equity stake in each project to form a 50:50 joint venture with RWE. The announcement follows Allocation Round 7 in January, which awarded Contracts for Difference to 8.4GW of potential capacity, the largest offshore wind auction in Europe to date.
Why it matters
Large new offshore capacity located close to high demand areas in the south of England supports the wider grid and power supply picture that charging projects depend on. The scale of financing needed for AR7 projects, and the role of public capital in widening the investor pool, is a useful signal for CPOs and funders weighing how to secure capital for their own infrastructure.
Government refuses consent for Botley West, the UK's largest solar farm to go through planning
Solar Energy UK said it was disappointed and surprised that Botley West did not secure Government consent. The Secretary of State cited Green Belt, landscape and heritage concerns, and also referenced aviation safety, though the trade body notes solar farms are planned or in place at airports including Blackpool, Teesside, Bristol, Glasgow, Belfast, Southend, Edinburgh and Newquay. Chief Executive Chris Hewett said multiple gigawatts of consented capacity remain in the pipeline and that next year should see more solar farms built than ever before.
Why it matters
Large solar schemes feed the wider push for cheaper grid power, which shapes the cost of energy for charging sites. The refusal signals planning risk for very large projects, even as consented capacity elsewhere continues to move towards construction.
UK homeowner struggles to use free Sunday electricity hour with new Tesla Powerwall 3
A British homeowner with solar panels and a newly installed Tesla Powerwall 3, but no electric vehicle, asked on Reddit how to configure the battery to capture a free hour of electricity offered on a Sunday from 1 p.m. to 2 p.m. Solar generation typically fills the battery by 10 a.m. or 11 a.m., leaving little spare capacity, and the Tesla app, which already listed their Octopus tariff, offered limited control. A top comment recommended NetZero at £7 a month or the free but labour intensive Home Assistant, as reported by The Cool Down.
Why it matters
The case shows that retail flexibility offers such as free power sessions depend on usable automation, and that app limitations push users towards paid third party tools. For CPOs and procurement teams, it is a reminder that smart control and tariff integration shape whether customers can actually benefit from time-based pricing.
UK homeowner told by installer that a further £2,000 of home battery capacity may not pay back
A UK homeowner weighing an extra £2,000 ($2,670) for home battery storage was advised by their solar installer to choose 10 kWh rather than the 15 kWh or 20 kWh they had considered. The homeowner, who reported daily winter consumption of about 14 kWh, shared the advice on Reddit, noting the installer's view that buying a little extra from the grid is probably cheaper than another battery module. The post, reported by The Cool Down, also asked how easily capacity could be added later.
Why it matters
The case shows how installers are steering buyers to right-sized storage, with return on investment outweighing full backup coverage, a pattern relevant to anyone pricing behind-the-meter batteries alongside charging. The question about adding modules later also points to demand for expandable systems that avoid upfront oversizing.
Policy & Market
eVED, ZEV mandate and used battery health dominate VRA Summit discussion on 2027 used EV market
Delegates at the Vehicle Remarketing Association Summit at The Slate, Warwick University, heard that the electric Vehicle Excise Duty, Zero Emission Vehicle mandate targets and buyer confidence in used battery health will be critical to the used EV market in 2027. More than 180 delegates attended, where speakers warned that policy and tax pressures risk deterring second-hand buyers even though fleet EV adoption remains strong. Paul Hollick, chair of the Association of Fleet Professionals, welcomed the limited Benefit-in-Kind increase in the recent Budget, but flagged eVED mileage-based taxation arriving from April 2028 as a headwind.
Why it matters
Fleet electrification feeds the future used EV mix, so tax changes such as eVED could shape residual values and the pace of EV uptake, and in turn long-term charging demand. CPOs and procurement teams planning fleet and depot charging should watch how mileage-based taxation affects driver and fleet behaviour.
Chinese entrants, ZEV mandate and inflation expected to shape UK vehicle remarketing in 2027
Delegates at the Vehicle Remarketing Association Summit, held at The Slate, Warwick University on 25 November 2026, heard that Chinese new entrants, ZEV mandate pressures and uncertain economic conditions will define remarketing in 2027. More than 180 people attended. The Bank of England's Glynn Jones said inflation is forecast to peak below 5% by mid-2027, with rising energy costs and Middle East tensions weighing on consumer confidence, while the Association of Fleet Professionals' Paul Hollick welcomed the limited Benefit-in-Kind increase to just 10% for 2030/31.
Why it matters
Used EV values and fleet demand feed directly into leasing and fleet electrification decisions, which in turn shape the volume of vehicles needing charging infrastructure. Softer consumer confidence and inflation, set against supportive Benefit-in-Kind rates, are worth factoring into demand forecasts for fleet focused charging work.
UK government reportedly set to lower 2030 ZEV Mandate threshold to between 50% and 60%
EV Infrastructure News has been told by an industry source that the Department for Transport is likely to announce a softened Zero Emissions Vehicle (ZEV) Mandate next week. The current rules require 80% of new vehicles sold in the UK to be zero emissions by 2030, and the revised figure could fall to between 50% and 60%, which the source said was broadly in line with automotive industry requests. Transport Secretary Heidi Alexander reportedly favours a threshold around 60%, while the SMMT has called the current rules "unsustainable".
Why it matters
A lower 2030 target could slow the pace of EV uptake that charging demand forecasts and rollout plans are built on. CPOs and buyers of charging infrastructure should watch the final figure and review utilisation assumptions and procurement timelines accordingly.
EV APPG chair Perran Moon says diluting the ZEV Mandate would be a terrible mistake
In a comment piece for Transport + Energy, Perran Moon MP, chair of the EV APPG, argues that almost 80% of UK-manufactured cars are exported, and that fewer than one in ten new car registrations are UK-built cars subject to the mandate. He says the 27% EV market share this year should be compared with an effective target of 24.6%, as calculated by New AutoMotive after flexibilities, rather than the 33% headline figure. He argues the industry is on course to meet its target, as it has every year since the mandate began.
Why it matters
Moon warns that cutting the mandate would replace policy certainty with doubt, putting billions of pounds of EV supply chain and infrastructure investment at risk. For CPOs and procurement teams, any weakening of the mandate could undermine the vehicle demand that underpins charging network business cases.
UK charging industry calls for policy certainty and better grid coordination on the EV transition
At a panel titled "Aligning Governments, Utilities & Industry", Jon Lyons of the Transport Technology Forum said government funding had helped local authorities build charging infrastructure, but that the shifting date for ending new petrol and diesel car sales makes planning harder. The 2030 target was set in 2020, delayed to 2035 in September 2023 under Rishi Sunak, then reinstated in 2024 by Labour, with hybrids allowed until 2035. Mark Smith of the Energy Saving Trust said councils need continued funding and expertise for infrastructure and contract management, plus closer alignment between government policy, industry investment and network planning.
Why it matters
Repeated changes to the phase out date complicate investment cases for charge point operators, and councils still struggle with procurement, installation and long term operation of networks. Suppliers and bidders should expect demand for contract management support and for early engagement with network operators.
Versinetic warns that cutting the 2030 ZEV Mandate target from 80% could undermine charging investment confidence
Julian Skidmore of EV charging engineering specialist Versinetic argues in an article titled 'ZEV Mandate: What It Means for Charge Point Operators' that EV sales trajectories directly inform utilisation forecasts, site business cases and product development plans. He notes that charging infrastructure falls outside the Government's review of the Mandate, but that charge point operators remain exposed because their business models depend on EV adoption growth. Skidmore says Versinetic's first charger took around five developer-years to build, and that anyone committing engineering budget today is betting on the market size in 2028 and beyond.
Why it matters
Operators and investors building utilisation forecasts and site business cases rely on a stable EV sales trajectory, so a mid-plan cut to the 2030 target adds demand risk to long-lead hardware and development commitments. Procurement teams may need to test their assumptions against slower adoption scenarios.
Coalition of 50 signatories urges UK government not to dilute ZEV mandate
A letter signed by 50 individuals and organisations from climate, transport, health and public sectors, unions, passenger groups, academic institutions and economic think tanks asks Prime Minister Andy Burnham to keep a strong, predictable ZEV mandate and set out a more ambitious plan on transport emissions. The government is reportedly exploring policy options that could adjust the mandate from 2027, including more flexibility for manufacturers committed to moving away from petrol and diesel production. The letter echoes one sent to Transport Secretary Heidi Alexander on 18th November by the Climate Change Committee, and a New AutoMotive report says the mandate has helped attract more than £41 billion (US$55 billion) of automotive investment since 2020.
Why it matters
The ZEV mandate underpins vehicle sales forecasts, and so the pace of charger demand that CPOs and funders plan around. Any loosening from 2027 could change utilisation assumptions and the timing of procurement and investment decisions.
Finance & Leasing Association calls for ZEV Mandate 2030 target to be cut from 80% to 50%
The Finance & Leasing Association (FLA) has urged the UK Government to lower the 2030 Zero Emission Vehicle (ZEV) Mandate target from 80% to 50%, saying current requirements do not reflect consumer demand or market conditions. In its response to the Department for Transport's review, it backed Option 3, a 50% zero-emission car sales target by 2030, and asked for more flexibility for manufacturers and revised targets for electric vans. It cited Department for Transport figures showing fleet purchases made up 78% of new electric car registrations in 2025, and proposed targeted support for used EV purchases and company car tax changes to boost second-hand supply.
Why it matters
A lower 2030 target could slow the growth in EV numbers that underpins charging demand forecasts, which matters for anyone sizing network rollouts or bidding for work. The heavy reliance on fleet buying, at 78% of new electric car registrations, suggests fleet and depot charging remains the most dependable demand source while private uptake lags.
Scotland warns Westminster against weakening the ZEV mandate without devolved agreement
Scottish Transport Secretary Stephen Flynn called any UK government move to water down the Zero Emission Vehicle (ZEV) mandate "wholly unacceptable" without the agreement of all four nations, following widespread speculation that ministers will cut 2030 EV quotas. He argued the policy rests on devolved legislation, so changes need the express consent of the governments and parliaments of all four nations. The article notes that parts 1 to 4 of the consultation are run jointly with Scotland, Wales and Northern Ireland, while only part 5, covering the 2030 phase-out of new petrol and diesel cars, sits solely with the UK government.
Why it matters
A dispute over who can change the mandate adds uncertainty to the 2030 EV sales trajectory that underpins charge point demand forecasts and investment cases. CPOs and funders should watch for delays or legal friction that could affect the pace of rollout, particularly in Scotland.
Band F car tax to rise to £235 from April 2027, with Band M up to £825
A report says Band F vehicle excise duty, covering cars emitting 141 to 150g/km CO2, will rise by £10 to £235 from 1 April 2027, up from £225 in 2026/27 and a steady climb from £200 in 2023/24. The Treasury confirmed in October that VED rates for cars, vans and motorcycles will be uprated in line with RPI, while Band M cars above 255g/km rise from £790 to £825 a year. The changes apply to cars registered between 2001 and 2017 across 13 emissions based bands.
Why it matters
Annual RPI linked rises widen the cash gap between low and high emitting cars, a modest but steady cost signal for drivers weighing a switch to electric. The report does not cover EV specific tax changes, so CPOs should treat this as background demand context rather than a direct driver of charging volumes.
IEA warns UK pay-per-mile plans on top of existing motoring taxes could discourage the switch to cleaner vehicles
A new Institute of Economic Affairs report by Professor David Bailey of Birmingham Business School, Reforming Road Tax: The Case for a Fair, Sustainable Pay-per-Mile System in the UK, calls adding mileage charges on top of current motoring taxes the "most politically damaging design" for road pricing. From April 2028 the Government plans to charge electric car drivers 3p per mile and plug-in hybrid drivers 1.5p per mile, both on top of Vehicle Excise Duty, meaning £360 a year at 12,000 miles and £600 at 20,000 miles for an electric car. The IEA calculates that a plug-in hybrid driver covering 20,000 miles would pay £300 in mileage charges, plus £200 standard VED and a £440 Expensive Car Supplement for cars listed above £40,000, reaching £940 a year before fuel duty.
Why it matters
A new per-mile cost for electric and plug-in hybrid drivers could weaken the running cost case for switching, which feeds through to charger demand and utilisation assumptions in site business cases. CPOs and funders should watch how the April 2028 charge develops, as it may influence driver behaviour and the pace of electric vehicle uptake.
Indian Centre open to additional funding for EV charging infrastructure if needed, says PM adviser
A news headline reports that the Centre is open to extra funding for EV charging infrastructure if required, according to an adviser to the Prime Minister. A related headline on the same page says Kumaraswamy called for a reliable EV charging network, stressing uptime and easy payments. The excerpt gives no funding amounts, timelines or scheme details, and the surrounding items are Indian energy stories, not UK ones.
Why it matters
Any additional public funding is conditional and unquantified for now, so it is a signal to watch rather than a basis for bids. The stress on uptime and easy payments suggests that reliability and user experience could shape future support and procurement expectations in India.
EU Made in Europe proposal forces UK to weigh closer EU ties against Chinese EV investment
Reuters reports that the EU's proposed Made in Europe rules would require a set percentage of European made components for companies to access EU subsidies or sell to EU governments and agencies, aiming to help EV and battery makers compete with cheap Chinese imports. As drafted, the scheme would exclude products made in the UK, and Prime Minister Andy Burnham wants UK built cars and components to count as made in Europe. Talks ahead of a Friday summit in Brussels are proving difficult, with key EU member states saying Britain must align with the bloc on trade protection measures and conditions for investment from China.
Why it matters
Local content rules could shape which EV and battery supply chains qualify for EU funded or publicly procured charging projects, and UK made hardware may be shut out unless a deal is reached. Buyers and CPOs with cross border pipelines should watch whether UK alignment with the EU limits Chinese investment and equipment sourcing.
Logistics UK says COP31 electrification goals need energy systems that can support logistics
Logistics UK has launched its Energy and Infrastructure Insight Report 2026 as electrification took centre stage at COP31 in Antalya, Türkiye, where the Global Electrification Initiative aims to lift electricity to 35% of global final energy consumption by 2035. The report draws on 14 in-depth interviews with senior figures from the logistics and energy sectors and covers grid decarbonisation, connections, charging infrastructure, technology and innovation, hydrogen and low-carbon fuels. Respondents called for aligned transport and energy policy, faster connections, sufficient grid capacity, strategically located charging and electricity prices that make electrification commercially viable. The report was sponsored by VEV and is available to Logistics UK Executive Members, with a summary available to download.
Why it matters
Operators are framing fleet decarbonisation as an energy, infrastructure and affordability problem rather than a vehicle choice, which points to grid connections, site location and electricity pricing as the deciding factors in charging investment. CPOs and suppliers serving logistics customers should expect demand to centre on these issues.
FLA chief executive says policy certainty is key to unlocking investment in electric fleets
In an opinion piece, Shanika Amarasekara MBE, chief executive of the Finance and Leasing Association (FLA), argues that the UK's EV transition needs a stable policy environment, not just ambitious targets and short term incentives. She cites FLA members providing £10.8bn of new finance for business cars, £8.7bn for commercial vehicles, £2.2bn for plant and machinery and £2.2bn for equipment in the 12 months to September 2026. She says the finance industry has the capacity and appetite to back cleaner commercial fleets, and that the challenge is whether businesses and lenders have enough confidence.
Why it matters
Fleet electrification is largely financed through leasing and hire purchase, so lender and operator confidence shapes how quickly fleets commit to electric vehicles. For CPOs and procurement teams, demand for depot and fleet charging is likely to track how clear and stable UK policy is.
BT, IKEA UK and Ireland, Centrica, ABB E-mobility and Openreach urge UK Government not to reduce ZEV Mandate
Major companies including BT, IKEA UK and Ireland, Centrica, ABB E-mobility and Openreach have written to UK ministers through the Climate Group's EV100 network, saying the ZEV Mandate "enjoys broad business support". They cite record BEV registrations, up 54% year-on-year and one in three of all new registrations, and 3,376 battery-electric vans registered in October, a 53% increase. The letter, which follows a similar message from the Climate Change Committee, asks the Government to retain the existing headline trajectories for cars and vans and focus on practical barriers, particularly the lack of suitable van models for heavier payloads.
Why it matters
The Mandate underpins the demand certainty that charging investment cases rely on, so any weakening would raise risk for CPOs and their funders. The letter's emphasis on van operators points to growing fleet and depot charging demand if the barriers are addressed.
Stormont to charge MLAs for EV charging after review finds policy breach
An internal review by senior official Robin Ramsey, running to over seventy pages, found that Northern Ireland Assembly members could charge their cars free of charge at secured car park chargers while also claiming travel expenses that can reach £6,900 per year for long-distance commuters. The chargers were installed in 2015 with no recorded decision to make them free for legislators, and the arrangement conflicted with the Assembly's own guidelines on benefit allocation. The review also found that booking record retention was cut from ninety days to seven on 12 May, three days after a Freedom of Information request for those records, and that the 18 May response saying the information was "not held" was judged non-compliant.
Why it matters
Free charging on public estates, with no recorded decision or pricing policy, creates reputational and compliance risk, and a two tier regime of free for insiders and paid for visitors is hard to defend. Operators and procurers bidding for workplace or public sector sites should expect pressure for clear tariff rules, auditable booking and usage data, and sensible record retention in contracts and back office systems.
Climate Change Committee warns UK likely to miss legal climate targets if ZEV Mandate is weakened
The Climate Change Committee chair, Nigel Topping, has written to Transport Secretary Heidi Alexander as part of the Government's review of the ZEV Mandate, backed by new evidence. The CCC cites the Government's own impact assessment, which implies cutting the headline targets would raise UK fuel consumption by 15 million barrels of oil a year by 2030, costing over £1 billion a year at current prices. It also says EVs deliver the largest share of emissions cuts in the Carbon Budget and Growth Delivery Plan to 2037, and that a typical household can save around £800 a year by switching to an EV.
Why it matters
The ZEV Mandate underpins demand forecasts for public charging, so any weakening could affect the volume and timing of EV uptake that CPO business cases and procurement pipelines depend on. The CCC's intervention signals continued political pressure to hold the policy, but the outcome of the review remains uncertain.
UK climate advisers warn weakening the ZEV mandate would likely cause climate targets to be missed
The Climate Change Committee said in a letter published on Wednesday that the UK is likely to miss its legally binding climate targets if the government confirms plans to allow more petrol and diesel car and van sales over the next four years. The change could add 8.4m tonnes of CO2 a year by next decade. The zero emission vehicle mandate, which carries fines of £12,000 per vehicle for carmakers that miss rising annual electric sales shares, is the single biggest contributor to those goals.
Why it matters
Any loosening of the mandate could soften the electric vehicle growth that charge point demand forecasts and investment cases rely on, and it adds policy uncertainty for CPOs and funders. The government would then need to find other major emission cuts or amend the carbon budgets, so watch for how it responds.
UK rapid charger grid fees forecast to reach £541.73 per week in 2027, raising pressure on public charging prices
An assessment by charging company Zest and The Fast Charge found that fixed grid charges for a standard rapid charger rose from £61.47 per week in 2021 to £440.13 in 2026, with published network tariffs indicating a further rise to £541.73 in 2027. The pressure stems mainly from fixed network charges linked to connection capacity, introduced under Ofgem's Targeted Charging Review in 2022 and fully implemented in 2023, rather than from wholesale electricity prices alone. Zest said sites typically use less than 10% of their maximum capacity across a full day, and that rapid charging prices could exceed £1/kWh.
Why it matters
Fixed charges tied to reserved capacity penalise sites with low average utilisation, so connection sizing and load management now weigh heavily on site economics and tender pricing. CPOs and funders should test business cases against these rising standing costs and the risk of higher driver prices.
Report says converting parking spaces into bike bays could help revive high streets at low cost
A new report from design practice Create Streets and cycle parking specialist Cyclehoop argues that reviving a high street costs far less than councils assume, and that turning parking spaces into bike bays could help. The coverage appears on TransportXtra, publisher of Local Transport Today and Parking Review, and the excerpt is paywalled, so no cost or space figures are available.
Why it matters
Kerbside space is the same scarce asset that on-street charging bids rely on, so councils weighing bike bays against parking bays may apply the same logic to charge point locations. CPOs and bidders should expect more competition for kerb space and be ready to justify the value of EV bays on high streets.
Mandatory payrolling of company van benefits to start in April 2027
From the 2027/28 tax year, UK employers must report company vans, van fuel, company cars, car fuel and medical benefits through payroll, with most other benefits following in April 2028. The excerpt says the start date was confirmed in the Budget and that the Finance Bill 2026 to 27 will carry the legislation, with supporting regulations still in draft. For 2026/27 the flat van benefit is £4,170 and the van fuel benefit is £798, with the van benefit rising to £4,310 in 2027/28, and a driver using a van at weekends with company fuel could face a taxable benefit of up to £5,135 a year.
Why it matters
Fleet customers will need accurate private use records and clear policies, which affects how they run depot, workplace and home charging arrangements for vans. Suppliers that can support clean usage data and clear reporting may find it easier to win and keep fleet work.
Experts warn weakening the UK ZEV mandate would harm the car industry and consumers ahead of Climate Change Committee letter
Campaigners and experts say watering down the UK zero emissions vehicle mandate would slow the electric car market and hamper efforts to reduce the cost of living, according to an exclusive in The Guardian. The mandate currently requires 80% of new car sales to be electric from 2030 and 100% from 2035, and it has been reported that Labour is poised to reduce those targets. The Climate Change Committee, chaired by Nigel Topping, is due to write to ministers on Wednesday on the effects of any change on the cost of living and net zero targets.
Why it matters
Any loosening of the 2030 and 2035 sales trajectory would weaken the long-term demand signal that underpins charge point investment, site pipelines and tender volumes. CPOs and suppliers should watch the Climate Change Committee intervention and the government response closely when assessing utilisation forecasts and rollout plans.
Pay per mile tax of 3p for EVs and 1.5p for plug in hybrids confirmed, report says
A UK news report says Labour has confirmed a pay per mile tax, first announced by Rachel Reeves and still due to go ahead under Andy Burnham's Government. Electric vehicle owners would pay 3p per mile and plug in hybrid drivers 1.5p, so 10,000 miles a year would cost an EV driver £300 on top of standard vehicle tax. The report says the move responds to falling fuel duty revenue as more drivers switch to electric, while some experts argue barriers to buying EVs should be kept to a minimum.
Why it matters
A per mile charge raises running costs for EV drivers, with high mileage, work and rural drivers hit hardest, which could weigh on EV uptake and the charging demand that business cases rely on. Procurement teams and CPOs should watch for how the policy affects fleet decisions and the cost advantage of charging over petrol and diesel.
Vehicle tax rates to rise from April in line with RPI, with Band F set at £235
A regional news report says vehicle tax bills will rise again from April, with rates for cars made between 2001 and 2017 ranging from £20 to £825 depending on emissions. Band F will be £235, most cars sit in bands E to H, and most cars made after 2017 pay £200 a year, with lower charges for some brand new vehicles. The RAC is quoted as saying the Government will raise VED for cars, vans and motorcycles in line with the Retail Prices Index from April 2027, affecting most bands.
Why it matters
Rising VED on older petrol and diesel cars adds to ownership costs and may shape how drivers weigh a switch to electric, which feeds long term charging demand. The excerpt does not cover EV rates, so any demand assumptions should be checked against the full RAC and Government detail.
Polestar UK urges Andy Burnham to introduce scrappage scheme for most polluting vehicles
Matt Galvin, Managing Director of Polestar UK, said the country is reaching a tipping point for EV adoption and that the new government should stimulate the pre-owned market through grants and a scrappage scheme for the most polluting vehicles. The article recalls the Labour government scheme introduced in the 2009 Autumn Budget, which encouraged motorists to scrap a car or van owned for more than 12 months and buy a cleaner one. That scheme was extended in September 2009 and February 2010, and ended at the end of March 2010.
Why it matters
A scheme aimed at the used market could widen the pool of EV drivers who rely on public charging, which matters for demand forecasting and site planning. For now it is an industry call, with no policy commitment reported in the article.
AFP urges Government to keep 80% ZEV Mandate car target for 2030 but cut van goal to 40%
In its submission to the Government's Zero Emission Vehicle (ZEV) Mandate consultation, the Association of Fleet Professionals said the existing 2030 target of 80% for new electric car sales should be maintained. It warned that fleets account for a large proportion of electric car sales and that a downward revision could mean lower manufacturer and charge point investment, higher prices and weaker supply. For vans, it recommended reducing the goal from 70% to 40%, alongside increased availability of depot charging and better grid support.
Why it matters
A retained car target supports the demand outlook behind charge point investment, while the call for more depot charging and grid support for vans points to where fleet-focused CPOs and installers may see opportunity. A lower van goal would signal a slower pace of commercial electrification, which could affect depot project pipelines.
Sadiq Khan joins Labour figures urging the Prime Minister not to water down electric vehicle targets
A live politics blog reports that Sadiq Khan has joined other Labour figures in urging the PM not to weaken electric vehicle targets, though the excerpt gives no detail on which targets or what changes are proposed. The same blog says the PM met European Commission president Ursula von der Leyen in Dublin, with a UK and EU summit seven days away in Brussels, where agreements on food and farming, emissions trading and a youth mobility scheme are due to be signed.
Why it matters
Public pressure from within the governing party shows that EV target policy is still being contested, which matters for anyone pricing demand and long term charging investment. Operators and bidders should watch whether any softening of targets changes the expected pace of vehicle uptake and site utilisation.
UK car industry to press EU for two-year delay to Brexit tariffs on electric cars
The UK car industry is preparing to push for a two-year delay to Brexit tariffs on electric cars traded with the EU, after an initial European proposal suggested a shorter delay. Rules of origin on batteries are due to apply from 1 January, meaning British and European electric cars would face 10% tariffs unless their batteries are made in the UK or EU with local materials. The rules were first due to start on 1 January 2024 and were delayed once, in December 2023, after several battery projects on both sides of the Channel collapsed, and many replacement projects have yet to reach the scale needed to meet European demand.
Why it matters
A tariff on cross-border electric cars would affect vehicle pricing and supply, which feeds through to the pace of EV uptake and the charging demand that CPOs plan around. The outcome of the delay talks also signals how far local battery manufacturing can be relied on, and carmakers remain largely dependent on imports.
EVA England chief executive urges Government to keep ZEV Mandate targets
Dr Vicky Edmonds, chief executive of EVA England, has written to Cabinet Office Minister Louise Haigh urging the Government to maintain ZEV Mandate targets. Earlier in the week the BBC reported that the Government would announce a "significant" reduction to the 2030 target, which currently calls for EVs to make up 80% of sales. Edmonds argued that weakening the mandate sends the wrong signal and erodes public confidence, and said the focus should be on barriers such as the high price and poor reliability of public charging, and high upfront vehicle costs.
Why it matters
The mandate has underpinned investment in charging infrastructure, so a lower 2030 target could affect demand forecasts and the investment case for charge point operators and the suppliers bidding to serve them. Procurement teams may want to watch for policy signals that change utilisation assumptions.
Startline poll finds 47% of UK dealers want an EV scrappage scheme to replace the Electric Car Grant
A Startline Motor Finance survey of car dealers found 45% want a trade-in incentive to cover both new and used EVs, while 28% favour new only and 27% used only. On funding, 53% would add a scrappage scheme to existing subsidies such as the Electric Car Grant, but 47% think it should replace them. The largest share, 45%, backed a one-year scheme targeting petrol and diesel cars over 10 years old, with 27% preferring 15 years and 28% preferring over five years.
Why it matters
A scrappage scheme that replaces the Electric Car Grant could change the pace and mix of EV sales, particularly in the used market, which in turn shapes the charging demand that CPOs and funders plan around. The poll reflects dealer opinion only, but it signals the policy options that may be in play in the UK.
Greg Clark opens Transport + Energy Forum with call for long-term policy certainty
Former business secretary and WMG chair Greg Clark gave the keynote at the Transport + Energy Forum, introduced by EVUK's Tanya Sinclair as someone "building the foundations of the industry that we know today". Clark said a short-term strategy is "a contradiction in terms", that the first two years of the current government have not achieved the progress hoped for, and that the reassertion of an industrial strategy in the 10 year plan is a positive development. He argued policy should rest on consensus, longevity and confidence rather than day to day politics, and said this year's Forum theme is convergence.
Why it matters
Charge point operators and investors depend on stable, long-term policy to underwrite capital-heavy rollout and grid connection plans, so a call for cross-party consistency speaks directly to project risk. Bidders should watch how the 10 year industrial strategy is translated into concrete programmes and funding.
Northern Ireland publishes Everyday Active Travel urban delivery plan with over 140 km of priority routes
Infrastructure Minister Liz Kimmins has set out "Everyday Active Travel: The Urban Delivery Plan", covering pedestrian and cycling improvements in Northern Ireland's towns and cities over the next decade and beyond. The priority programme identifies over 140 km of routes connecting more than 280,000 people to destinations including 118 schools, 33 town centres and 17 public transport hubs, at an estimated cost of £140 million to £280 million. The plan also identifies almost 1,000 km of additional corridors for future delivery.
Why it matters
This is an active travel plan rather than a charging policy, but it signals where the Department for Infrastructure will focus urban public realm and street works over the next decade. CPOs and contractors planning on-street or town centre charging in Northern Ireland should track these corridors for potential overlap, coordination opportunities and kerbside space pressures.
UK ranks 15th in G20 on electrification as ministers reportedly discuss weakening ZEV mandate
A new analysis from the Energy and Climate Intelligence Unit (ECIU) places the UK 15th in the G20 for shifting transport, heating and industry away from fossil fuels, with 22.1% electrification across industry, buildings and transport in 2024. The report, based on International Energy Agency data, was published a day after ministers reportedly met to discuss weakening the Zero Emission Vehicle (ZEV) mandate. It lands as COP31 in Antalya considers a proposed target of 35% electrification by 2035, which South Korea has already exceeded and Japan is close to at 34.6%.
Why it matters
Any weakening of the ZEV mandate could soften the demand outlook that underpins charge point investment and procurement planning in the UK. Developers and CPOs should watch for the outcome of the review when assessing rollout timelines and utilisation assumptions.
Reported UK ZEV mandate cut could add uncertainty for electric motorcycle sector after grant ends
Reports suggest the UK Government is preparing to scale back its Zero Emission Vehicle mandate, with the share of new cars required to be zero-emission by 2030 falling from 80 per cent to around 60 per cent. The mandate covers cars and vans, not motorcycles, mopeds or scooters, so it would not directly change requirements for electric motorcycle makers. The Plug-in Motorcycle Grant, worth up to £500 per eligible bike, expired in April 2026 with no replacement, leaving the sector without a dedicated purchase incentive.
Why it matters
A weaker national signal on electrification, combined with the loss of two-wheeler purchase support, could dampen demand growth for light electric vehicles and slow the case for dedicated charging provision for them. Procurement teams and CPOs planning L-category charging should treat demand forecasts with extra caution.
Labour MPs urge government not to weaken 2030 electric vehicle sales target ahead of cabinet talks
Members of Labour's climate and nature crisis caucus say ministers must not water down the legal requirement for 80% of vehicles carmakers sell in 2030 to be electric, calling a cut a backward step. Business secretary Jonathan Reynolds wants 50% and transport secretary Heidi Alexander about 60%, while energy secretary Miatta Fahnbulleh wants it kept as close to 80% as possible. Sources say Louise Haigh is likely to back a new target of 60% to 65% at a meeting now set for Thursday, with a final announcement likely this month.
Why it matters
The 2030 sales target underpins the demand forecasts that charging investment cases rely on, so a cut to somewhere between 60% and 65% could slow or reshape rollout plans. CPOs and funders should watch the final figure before locking in volume assumptions for tenders and site pipelines.
UK reportedly considers cutting 2030 zero-emission vehicle sales target from 80% to about 60%
The UK government is reportedly weighing a reduction in its 2030 ZEV sales target from 80% to approximately 60%, with compliance flexibilities for automakers possibly extended until 2034. Battery-electric vehicles made up 26.6% of UK new car sales in the first ten months of 2026, against a 33% target, and carmakers cite weak consumer demand and supply chain disruption. Charging infrastructure investors warn that weakening the mandate could put £1.7 billion of investment at risk, and no final decision has been announced.
Why it matters
A lower 2030 target could slow the growth in EV numbers that underpins charging demand forecasts and the business cases for new sites. Investors and CPOs may face greater uncertainty on returns and tender pipelines until the government confirms its position, even though the 2035 zero-emission commitment remains in place.
SMMT chief says heavy UK electric car discounting is not sustainable in the long term
Mike Hawes, Chief Executive of the SMMT, told the Express that manufacturers are relying heavily on discounts on newly released models, alongside other incentives, to drive electric vehicle demand. Discounts as high as 15% are described as common as firms work to meet the Zero Emissions Vehicle mandate, which sets a 33% fully electric target for 2026 rising to 80% by 2030, with penalties of around £12,000 per non-compliant car. Hawes warned the approach is unsustainable for businesses and for buyers facing lower resale values.
Why it matters
Demand propped up by discounting rather than organic uptake adds uncertainty to the pace of EV parc growth that charging network business cases depend on. Procurement teams and CPOs should watch whether mandate pressure and falling resale values affect the volume and mix of vehicles reaching UK roads.